Home / Hickman Wildlife Water Catchment and Pipe Fence / Document

Question and Answers 9 3 2026 0002

Updated

A PDF document (90 KB) attached to Hickman Wildlife Water Catchment and Pipe Fence, from the Bureau of Land Management. Due Nov 9, 2026, 3:00 PM (UTC-5).

File name: B011_-_140L1726Q0054_Question_and_Answers_9_3_2026_0002.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

140L1726Q0054
9/3/2026

Questions & Answers
Q1) Access – Can we get a pin to determine the accessibility of the project? A: A lat/long is provided so the location can be viewed or navigated to in Google Earth or a similar program: 33.75244, -107.14047
The legal description of the project is also included in the SOW and can be used to navigate to the project.

Q2) Do you anticipate that the awarded contractor will be able to access the site by vehicle? Or do you anticipate the site will be accessible only via helicopter? A: Yes, there will be vehicle access. A helicopter is an option as well.

Q3) Do you know how many LF of arroyo crossing the pipe tube fence will require? (Approximate) A: No, that will be up to the contractor to determine.

Q4) Size of the Water Catchment Reservoir? I cannot find anything in the SOW. A: There is no catchment reservoir other than the storage tanks. The contractor will be building a catchment, not a reservoir.

The beginning of the document. Download the full file to read on.

Other documents in this bid