Statement of Work - JBLG Rev01
Updated
A PDF document (119 KB) attached to JB Charleston Multiple Award Construction Contract, from the Department of the Air Force. Due Nov 2, 2026, 12:00 PM (UTC-5).
File name: Statement of Work - JBLG Rev01.pdf
The full file is for paid members, or buy this bid alone.
Preview
STATEMENT OF WORK
FOR
MULTIPLE AWARD
CONSTRUCTION CONTRACT (MACC)
AT
JOINT BASE LINDSEY GRAHAM
SOUTH CAROLINA
(Formerly Joint Base Charleston)
SOLICITATION NO. FA4418-26-R-0006
24 March 2026 (R1: 22 Oct 2026)
628TH CIVIL ENGINEER SQUADRON
210 WEST STEWART AVENUE (BLDG 721)
JOINT BASE LINDSEY GRAHAM, SC 29404
INDEX FOR
STATEMENT OF WORK
MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC)
1. Definitions
2. Description of Work
3. Contractor Operations
4. Commencement, Prosecution, and Completion of Work
5. Design Documents, General
6. Progress of Work
7. Material Approval Submittals
8. As-Built Files
9. Operation and Maintenance Manuals
10. Warranty of Construction
11. Program Management
12. Quality Control Plan
13. Daily Construction Activity Reports
14. Subcontracting Support Capability
15. Project Execution and Technical Capability
16. Field Survey Requirements
17. Government Furnished Equipment / Materials
18. Government Equipment On Site
19. Disposal of Waste
20. Construction Site Maintenance
21. Security
22. Flightline Access
23. Delays in Entering and Leaving Work Area
24. Safety and Health
25. Prohibition of Use of Asbestos Containing Materials 26. Use of Tobacco Products in Air Force Facilities
27. Recording and Preserving Historical and Archeological Finds 28. Parent MACC Contract and TOPR Conflicts
STATEMENT OF WORK
FOR
MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC)
1. DEFINITIONS:
a. Beneficial Occupancy - FAR 52.236-11, Use and Possession Prior to Completion, allows for the occupation of a building prior to final acceptance. The Contracting Officer must notify the contractor of the intent of the government to take Beneficial Occupancy in writing. If the Air Force occupies the facility they must ensure there is no alteration, repair or change in any way to the facility, or any equipment therein prior to the government taking final acceptance. Changes of this nature could alter the Government’s rights under the contract clauses for warranty and inspection.
b. Design-Build – The process by which the same contractor provides both the design and construction
c.
services for a project. TOPRs may be issued as Conventional Design-Build or Progressive Design Build. (1) Conventional Design Build: TOPR awarded cost will be a Firm-Fixed price for both Design and Construction at time of TOPR issuance.
(2) Progressive Design Build: Progressive Design-Build (PDB) is authorized under this contract pursuant to 10 U.S.C. § 3241(g) and shall be executed in accordance with the fair opportunity procedures of RFO 16.505. Progressive Design Build (PDB) TOPRs will be awarded a best-value
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Solicitation
- Solicitation Attachment XU - Past Performance Customer Questionnaire
- Solicitation Attachment XV - Past Performance Survey
- Solicitation Attachment XW - JB Charleston MACC Work Load Estimate
- Solicitation Attachment XX - Task Order Proposal Request Seed Project
- Solicitation Attachment XY - On and Off-Ramp Procedures
- Statement of Work - JB CHS MACC
- Statement of Work - Attachment 1 - JB Charleston Statement of Work for (A E)
- Statement of Work - Attachment 10 - 01 33 00 - Attachment B - JB CHS Request for Information Form
- Statement of Work - Attachment 11 - 01 33 00 - Attachment C - Form (Submittal Register)
- Statement of Work - Attachment 12 - 01 33 00 - Attachment D - Form (Request for Information Register)
- Statement of Work - Attachment 13 - 01 33 00 - Submittal Procedures