Statement of Work Joint Pipeline Advisory Committees Repair Criteria Review clean
Updated
A Word document (26 KB) attached to Joint Pipeline Advisory Committees: Repair Criteria Review, from the Pipeline and Hazardous Materials Safety Administration. Due Nov 5, 2026, 1:00 PM (UTC-5).
File name: SOW Joint Pipeline Advisory Committees Repair Criteria Review clean.docx
The full file is for paid members, or buy this bid alone.
Preview
PHMSA PIPELINE HAZARDOUS MATERIALS SAFETY ADMINISTRATION (PHMSA)
1.0 PROJECT SCOPE & LOCATION The Contractor shall be responsible for furnishing appropriate meeting space, audio-visual (AV) support, technical services, beverage service, and overnight lodging accommodations for the Joint Meeting of the Liquid and Gas Pipeline Advisory Committees to review the Repair Criteria rulemaking. Geographic Location: All proposed venues must be located within the Washington, D.C. metropolitan area. Performance Period / Event Dates: December 2 – 3, 2026 (2 consecutive days). Daily Operating Hours: 9:00 AM to 5:00 PM EST daily.
2.0 MEETING SPACE & CONFIGURATION REQUIREMENTS
2.1 Main Meeting Room (General Session)
Capacity & Layout: Must comfortably accommodate all meeting participants with U-shaped table configuration with seating for 25 in front of seating for the audience. Technical Requirements: Electrical outlets (e.g. 3 6-foot power strips for participants at the table.) Dedicated, easily accessible electrical power outlets for court reporter equipment and real-time transcription setup with direct feed from house audio. Ability to accommodate PHMSA staff laptop that will present the slides from the U-shaped table with the capability of bringing audio into the room from Zoom while allowing Zoom participants to hear the audio inside the room. Schedule: Required for both days (December 2–3, 2026) from 9:00 AM to 5:00 PM daily.
2.2 Breakout Room (PHMSA Staff)
Capacity & Layout: One (1) separate breakout room equipped with tables and seating for 20 people. Technical Requirements: Screen/Large monitor with HDMI cable. Schedule: Required for both days (December 2–3, 2026) from 9:00 AM to 5:00 PM daily.
3.0 AUDIO-VISUAL (AV) & TECHNICAL REQUIREMENTS
The Contractor shall provide a complete, turn-key Audio-Visual and IT infrastructure package, including: Internet Access: High-speed, VPN-capable Wi-Fi internet access dedicated for all meeting attendees and staff. Display Systems: Two (2) large projection screens along with contractor-provided digital projectors suitable for clear viewing throughout the main room. (Depending on visibility, may need two large monitors for the audience.) Microphone Package:
20 to 25 table [push to talk microphones arranged at a head table / U-shaped table setup with seating for 20-25. Sound System & Audio Integration: Complete integration with house sound system, sound mixing boards, amplifiers, and associated audio hardware. Hybrid / Virtual Capability: Integrated Video Conferencing and Live Streaming capabilities compatible with Zoom, Microsoft Teams, and Google Meet.
The beginning of the document. Download the full file to read on.