Statement of Work - Novocyte
Updated
A Word document (21 KB) attached to NOVOCYTE 3000 PM&R Services Intent to Sole Source, from the Department of Veterans Affairs. Due Nov 13, 2026, 12:00 PM (UTC-8).
File name: P09 - FINAL SOW - Novocyte.docx
The full file is for paid members, or buy this bid alone.
Preview
SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS
D.1 – STATEMENT OF WORK
TITLE: Novocyte 3000 PM&R
PLACES OF PERFORMANCE: VA San Diego Healthcare System (VASDHCS), Campus Facilities throughout, San Diego County, CA, Imperial County, CA PERIOD OF PERFORMANCE: Base Year - 12/01/2026-11/30/2027Option Year One - 12/01/2027 -11/30/2028Option Year Two - 12/01/2028 -11/30/2029Option Year Three - 12/01/2029 -11/30/20230Option Year Four - 12/01/2030 -11/30/20231 CONTRACT TYPE: Firm Fixed Price (FFP).
OBJECTIVES / SCOPE: The NovoCyte 3000 is equipped with 3 lasers and capable of 13-parameter detection. High parameter detection capabilities are necessary in order to maximize the number of parameters that can be quantitated on the same single cells. This is crucial because (1) the CD8+ T cells being analyzed are rare and (2) analyzing numerous parameters on the same single cells will be needed to accurately identify heterogeneous T cell subsets. Thus, the requested equipment fulfills a unique need in my laboratory and will be essential to support the specific aims of our funded VA Merit grant.
The Novocyte 3000 is a workhorse in our suite of VA Merit studies that rely on state-of-the-art flow cytometry. It is essential that this equipment and its software remain in good working order with no downtime or technical disruptions.
Flow cytometry measurements are an integral activity listed on several of our group’s VA Merit studies, so the maintenance package is a necessary part of completing that research. SPECIFIC REQUIREMENTS / TASKS: Technical optimization and validation of novel MR pulse sequences for qualitative and quantitative characterization of musculoskeletal and neuro tissues with a histologic reference standard. The contractor shall provide complete 12-month coverage for top priority response for any repair needed to get the Novocyte 3000 system back up and running, including all parts and labor, plus travel costs for on-site visits related to hardware failures. The contractor shall also provide regular Planned Maintenance visits) to ensure the system continues to run at optimal performance with minimized downtime. The contractor shall also provide full optimization and timely updates of software and data systems. PERFORMANCE MONITORING REQUIREMENTS: An assigned Principal Investigator will be checking quality of performance when service is used. CHANGES: The awarded Contractor / Vendor is advised that only the Contracting Officer, acting within the scope of the contract has the authority to make changes which affect the contract in terms of quality, quantity, price or delivery.
The beginning of the document. Download the full file to read on.