ThinkForm St. Louis VAMC Renovate Lobby RBM Survey Report 1
Updated
A PDF document (8.5 MB) attached to 657-26-102JC FCA Replace Various Roofs on BLDG 1, JC, from the Department of Veterans Affairs. Due Nov 4, 2026, 2:00 PM (UTC-6).
File name: ThinkForm_St. Louis VAMC Renovate Lobby_RBM Survey Report 1.pdf
The full file is for paid members, or buy this bid alone.
Preview
REGULATED BUILDING MATERIALS
SURVEY REPORT
Renovate Bldg. 1 Ambassador Suite & Main Lobby
VA Project No. 657-24-111JC
John J. Cochran VA Medical Center
915 North Grand Boulevard
St. Louis, MO 63106
Mabbett Project No. R2023211.001.001
July 28, 2025
Prepared For:
ThinkForm Design Architects, LCC
38 E Broad Street, Suite 3
Hopewell, NJ 08525
Mabbett & Associates, Inc.
105 Central Street, Suite 4100
Stoneham, MA 02180-1260
T. 781-275-6050
F. 781-954-5155
Massachusetts | Virginia |
© 2025, Mabbett & Associates, Inc.
www.mabbett.com
Rhode Island
|
New York
REGULATED BUILDING MATERIALS SURVEY REPORT
Renovate Bldg. 1 Ambassador Suite & Main Lobby | St. Louis VAMC
ACKNOWLEDGEMENT
This Regulated Building Materials Survey Report has been prepared by Mabbett & Associates, Inc. (Mabbett®) for the Renovate Bldg. 1 Ambassador Suite & Main Lobby VA Project No. 657-24-111JC at the John J. Cochran VA Medical Center (St. Louis VAMC) located at 915 North Grand Boulevard in St. Louis, Missouri. The information presented herein is based on the facts and information conveyed to or received by Mabbett during the preparation of this report. If any of the information provided to Mabbett that was used in preparing this report is incorrect, incomplete, or subject to change, Mabbett would wish to alter its opinions accordingly. In addition, the professional opinions and information contained in this report are based solely on the requirements of the applicable regulations and technical data as known to Mabbett as of the date of this report and considered applicable to this report.
Mabbett does not claim to have identified all hazardous materials that could be present in the facility. Mabbett has conducted this assessment with reasonable care and has performed this project in accordance with industry standards. There can be no assurances, and Mabbett makes no assurances, that the information, research, and technology used to prepare this report may not change in the future, thus affecting the results reported herein. The attached Regulated Building Materials Survey Report was prepared by Mr. Andrew P. Beaton, Environmental and Regulated Building Materials Technician of Mabbett & Associates, Inc. This report has been reviewed and approved by:
Digitally signed by
Michael F. Delaney
Date: 2025.07.28
14:05:49 -04'00'
Michael F. Delaney
Practice Lead, Building Sciences
Michael F.
Delaney
APB/MFD
© 2025, Mabbett & Associates, Inc.
The beginning of the document. Download the full file to read on.