Revised CALCULATION OF SELF PERFORMED-SUBCONTRACTOR WORK r 02
Updated
A Word document (25 KB) attached to 657-26-102JC FCA Replace Various Roofs on BLDG 1, JC, from the Department of Veterans Affairs. Due Nov 4, 2026, 2:00 PM (UTC-6).
File name: REVISED CALCULATION OF SELF PERFORMED-SUBCONTRACTOR WORK_r 02.docx
The full file is for paid members, or buy this bid alone.
Preview
?.## CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK, PROJECT # 657-24-111JC
Offerors for General construction contractors (NAICS code 236220). The contractor will not pay more than 85% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219-73 or certified VOSBs listed in the SBA certification database as set forth in 852.219-74. Any work that a similarly situated certified SDBOSB/VOSB subcontractor further subcontracts will count towards the 85% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead, profit/fee and bond costs shall be added after a subtotal of personnel and material/Equipment costs has been calculated. Clearly identify the personnel costs you will be performing, and the personnel costs of other eligible service-disabled veteran-owned small business concerns. Below is a suggested format.
Specification Division
SDVOB Vendor (Y or N)
Personnel Cost
Material/Equipment Costs
Division 01
$
$
Division 02
$
$
Division 03
$
$
Division 04
$
$
Division 05
$
$
(Add additional lines as necessary for each Division applicable to this project)
$
$
$
$
Sub Total (Personnel Costs, Material/Equipment Costs)
$
Profit
$
Home Office Overhead
$
Bond
$
Grand Total
$
Calculation of self-performed personnel costs:
2. Subtract all subcontractor personnel costs* that are not SDVOSB 3. Remainder is ‘Total amount of work to be self-performed under the
*personnel costs include labors, mechanics, other tradesmen, and office personnel directly charged to the project (includes project manager, job superintendent, administrative, estimators, etc.)
I certify the above representations are true and correct to the best of my knowledge.
SignatureDate
Printed Name of Authorized RepresentativeTelephone Number
Title of Authorized RepresentativeE-mail Address
The beginning of the document. Download the full file to read on.