Home / 2-STEP SEALED BID - TINKER AFB WWYK250019 Remove and… / Document

Unedited Specifications 28 31 76

Updated

A PDF document (220 KB) attached to 2-STEP SEALED BID - TINKER AFB WWYK250019 Remove and Replace Fire Sprinkler in Plasma Booth Dust Collectors and Replace the Building F/A System, B3221, from the Department of the Air Force. Due Oct 30, 2026, 2:00 PM (UTC-5).

File name: Unedited Spec 28 31 76.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

**************************************************************************

USACE / NAVFAC / AFCEC

Preparing Activity:

USACE

UFGS-28 31 76 (August 2020)
-----------------------------------Superseding
UFGS-28 31 00.00 10 (November 2008)
UFGS-28 31 49 (April 2006)
UFGS-28 31 63.00 20 (October 2007)
UFGS-28 31 64.00 10 (August 2009)
UFGS-28 31 74.00 20 (February 2010)
UFGS-28 31 76 (August 2011)

UNIFIED FACILITIES GUIDE SPECIFICATIONS

References are in agreement with UMRL dated April 2026
**************************************************************************

SECTION TABLE OF CONTENTS

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

SECTION 28 31 76

INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM, ADDRESSABLE

PART 1

GENERAL

1.1

REFERENCES

1.2

RELATED SECTIONS

1.3

SUMMARY

1.3.1
Scope
1.3.2
Qualified Fire Protection Engineer (QFPE)
1.4

DEFINITIONS

1.4.1
Interface Device
1.4.2
Fire Alarm and Mass Notification Control Unit (FMCU)
1.4.3
Remote Fire Alarm and Mass Notification Control Unit
1.4.4
Local Operating Console (LOC)
1.4.5
Terminal Cabinet
1.4.6
Control Module and Relay Module
1.4.7
Designated Fire Protection Engineer (DFPE)
1.4.8
Qualified Fire Protection Engineer (QFPE)
1.5

SUBMITTALS

1.6

SYSTEM OPERATION

1.6.1
Alarm Initiating Devices and Notification Appliances (Visual, Voice, Textual)
1.6.2
Functions and Operating Features
1.6.3
Elevator Recall
1.7

TECHNICAL DATA AND SITE-SPECIFIC SOFTWARE

1.8

EXISTING EQUIPMENT

1.9

QUALITY ASSURANCE

1.9.1
Submittal Documents
1.9.1.1
Preconstruction Submittals

SECTION 28 31 76

1.9.1.2
Shop Drawings
1.9.1.3
Nameplates
1.9.1.4
Wiring Diagrams
1.9.1.5
System Layout
1.9.1.6
Notification Appliances
1.9.1.7
Initiating Devices
1.9.1.8
Amplifiers
1.9.1.9
Battery Power
1.9.1.10
Voltage Drop Calculations
1.9.1.11
Product Data
1.9.1.12
Air Sampling Smoke Detection System Calculations
1.9.1.13
Operation and Maintenance (O&M) Instructions
1.9.1.14
As-Built Drawings
1.9.2
Qualifications
1.9.2.1
Fire Alarm System Designer
1.9.2.2
Supervisor
1.9.2.3
Technician
1.9.2.4
Installer
1.9.2.5
Test Technician
1.9.2.6
Manufacturer
1.9.3
Regulatory Requirements
1.10

DELIVERY, STORAGE, AND HANDLING

1.11

MAINTENANCE

1.11.1
Spare Parts
1.11.2
Special Tools

PART 2

PRODUCTS

2.1

GENERAL PRODUCT REQUIREMENT

2.2

MATERIALS AND EQUIPMENT

2.2.1
Standard Products

The beginning of the document. Download the full file to read on.

Other documents in this bid