100% CONSTRUCTION DOCUMENTS

70 South Franklin Street, Wilkes-Barre, PA 18701
570 | 824-6340 [email protected]
edpons.com

FE PROJECT NO: 25-126

ENGINEERING LLP

22 Mulberry St., Suite 2A,
Middletown, NY 10940
t 845-343-1481; fx 855-320-8735

www.fellp.com

SAFETY NOTES:

SITE KEY PLAN

GI-002

LEGEND:

GENERAL NOTES:

SITE SAFETY & PROPOSED STAGING PLAN

GI-002

100% CONSTRUCTION DOCUMENTS

FE PROJECT NO: 25-126

ENGINEERING LLP

22 Mulberry St., Suite 2A,
Middletown, NY 10940
t 845-343-1481; fx 855-320-8735

www.fellp.com

CONSTRUCTION PHASING PLAN

PROJECT SCOPE OF WORK

GENERAL NOTES:

DURATION

DESCRIPTION

Weeks 1-12

Submittals & Mobilization

TBD

PHASE 1: Building 13 Roof - Abatement, Demo, Construction

TBD

PHASE 2: Building 13 (Facade Work) - Demo & Construction

TBD

Project Close Out

Project Duration: ___ Days
Notes:
1.
2.
3.
4.

TEMPORARY CONSTRUCTION PARTITION

WITH DOUBLE MAN GATE DETAIL

5.

Certain activities may be combined for expediency.
All phasing and work is subject to the owner occupancy schedule. All work needs to be coordinated with the COR in advance. There will be no re-mobilization cost permitted. All work must be completed in allotted time frame.
Refer to spec section 01 32 16.15 for more information on Project Scheduling Requirements.

GI-003

GENERAL PROJECT PHASING NOTES:

8' TEMPORARY CONSTRUCTION FENCING DETAIL

GI-003

AREAS OF EXCAVATION

TEMPORARY CONSTRUCTION PARTITION

WITH DOUBLE MAN GATE DETAIL

GI-003

AREAS OF EXCAVATION

10' TEMPORARY CONSTRUCTION FENCING DETAIL

GI-003

100% CONSTRUCTION DOCUMENTS

FE PROJECT NO: 25-126

ENGINEERING LLP

22 Mulberry St., Suite 2A,
Middletown, NY 10940
t 845-343-1481; fx 855-320-8735

www.fellp.com

INFECTION CONTROL NOTES:

100% CONSTRUCTION DOCUMENTS

70 South Franklin Street, Wilkes-Barre, PA 18701
570 | 824-6340 [email protected]
edpons.com

FE PROJECT NO: 25-126

ENGINEERING LLP

22 Mulberry St., Suite 2A,
Middletown, NY 10940
t 845-343-1481; fx 855-320-8735

www.fellp.com

The beginning of the document. Download the full file to read on.

Other documents in this bid