Home / WFE Solenoid/Corrector Magnet Spares / Document

WFE Solenoid Statement of Work

Updated

A PDF document (962 KB) attached to WFE Solenoid/Corrector Magnet Spares, from the Department of Energy. Due Dec 9, 2026, 5:00 PM (UTC-6).

File name: WFE Solenoid SOW 389116swk.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Statement of Work

AD-Proton Source Low Energy Solenoid and
Corrector Magnet Package
Preparation Date:

07/24/2026

Date:

08/03/2026

Preparing Organization:

AD-Proton Source Department

Document Number:
Document Approval
Signatures Required

Date Approved

Originator: Daniel C. Jones

8/18/26

Approver: Lionel Prost

Revision History
Revision

Date of Release

-

August 2026

Fermi National Accelerator Laboratory

Description of Change
Initial Release

Statement of Work

1.

2.

3.

4.

5.

6.

7.

8.

9.

8.1.

8.2.

8.3.

A.1

Fermi National Accelerator Laboratory

Statement of Work

1.

INTRODUCTION

The Proton Source Department of Fermi National Accelerator Laboratory (FNAL) is responsible for providing high-intensity proton beams for FNAL’s broad physic program. To facilitate the complex’s continued success the Proton Source Department is seeking proposals for the design and fabrication of 2 magnet packages that will steer, focus, and match the 30 keV H - beam from the ion source into the Radio Frequency Quadrupole (RFQ) accelerator. The magnet packages must include the solenoid coil and two dipole corrector magnets for steering the beam in both the vertical and horizontal planes. This Statement Of Work (SOW) outlines the technical tasks and requirements for the Prospective Offerors (hereafter referred to as “the Subcontractor”), including reporting, documentation, scheduling, change management, deliverables, and communication with The Buyer, Fermi Forward Discovery Group (FFDG). These requirements must be fulfilled in accordance with FNAL standards and guidelines. 2.

SCOPE AND DELIVERABLES

The primary scope of work covers design, manufacturing, fabrication, quality control (QC), and delivery for a built-to-spec package inclusive of all associated and/or described work within this SOW. The Subcontractor will provide all shop facilities, manufacturing/fabrication equipment, qualified shop personnel, engineering personnel, inspection services, magnetic testing services, cleaning services, and packaging services for completing the scope of work defined in this SOW. Table 1 provides a list of all contract deliverables, including documentation which is listed as required (AR). Only released drawings shall be used for manufacturing and fabrication. The Subcontractor is responsible for verifying the drawing release state with FFDG prior to the start of any manufacturing or fabrication. The requirements for documentation to be provided to FFDG are outlined in Section 7. Table 1: List of Contract Deliverables

Item

The beginning of the document. Download the full file to read on.

Other documents in this bid