Home / Prevailing wage rates / New York / NY20260007

4 Counties in New York Davis-Bacon Wage Rates: Building, Heavy and Highway

Updated

Federal prevailing wage rates (Davis-Bacon) for building, heavy and highway construction in 4 Counties in New York: 19 classifications, base rates from $35.94 to $75.46 an hour plus fringe benefits. General decision NY20260007, modification 3, published Oct 8, 2026.

TypeDavis-Bacon (construction)
NumberNY20260007
Modification3
PublishedOct 8, 2026
StateNew York
AreaNew York Counties of Dutchess, Orange, Sullivan and Ulster
Construction typeBuilding, Heavy and Highway
Get new federal construction bids in New York by email
Only new notices that match, once a day. Federal bids in New York that match your words.

Wage rates and fringe benefits (19)

ClassificationBase rateFringeTotalNew York median
Bricklayer (Heavy Construction): Bricklayers, Cement Masons, Plasterers, Stone Masons (Orange County (Town of Tuxedo))$47.44$38.00$85.44
Carpenters (Building Construction): Carpenters, Millwrights, Pile Drivers$44.72$31.23$75.95
Carpenters (Heavy and Highway Construction): Carpenters, Millwrights, Pile Drivers$44.72$31.23$75.95
Millwright (Dutchess and Orange Counties)$47.83$43.03$90.86$39.88 (+$7.95)
Diver (Dutchess and Orange Counties)$75.46$55.84$131.30
Diver Tender (Dutchess and Orange Counties)$55.00$55.84$110.84
Dock Builder & Piledrivermen (Dutchess and Orange Counties)$60.59$55.84$116.43
Laborer (Building Construction) Group 2: Forklift for Masonry Purposes (Orange and Ulster Counties)$37.75$27.15$64.90
Laborers (Building Construction) Group 3: Blasters, Laser Beam Operator. (Dutchess County)$43.45$32.90$76.35
Glazier (Dutchess, Orange, Sullivan and Ulster Counties)$49.20$57.20$106.40$31.05 (+$18.15)
Painters: Drywall Finishers$35.94$24.66$60.60
Painters: Lead Abatement Work$35.94$24.66$60.60
Painters: Painter/Paperhanger$35.94$24.66$60.60
Painters: Spray Rate$36.94$24.66$61.60
Painter: Structural Steel and Bridge (Dutchess, Orange, Sullivan and Ulster Counties)$56.25$55.14$111.39
Plumber/Pipefitter (Zone 2 Dutchess County and the Remainder of Ulster County)$60.66$45.35$106.01
Roofer$50.25$32.62$82.87$34.10 (+$16.15)
Sprinkler Fitter$57.20$32.66$89.86$47.85 (+$9.35)
Sheet Metal Worker$55.29$47.43$102.72$41.25 (+$14.04)

The median is the middle rate for the same work across New York's building, heavy and highway wage determinations in force today, shown when at least three have it.

How to use these rates

On a federal or federally funded construction contract over $2,000, every laborer and mechanic on site must be paid at least the base rate for the work they do, plus the fringe benefit amount, either as benefits or in cash. The wage determination that applies is the one included in the solicitation, at the modification in force when bids open; a later modification only counts if it is published early enough before bid opening. Classifications missing here are added through a conformance request. The full text below has the footnotes, the paid holidays and any rate notes.

Other Davis-Bacon building, heavy and highway wage determinations in New York

All New York prevailing wage rates · Open federal bids in New York

Full text of NY20260007

Show the official text (120,535 characters)
General Decision Number: NY20260007 10/08/2026


State: New York


Construction Types: Building, Heavy and Highway


Counties: New York Counties of 
Dutchess, Orange, Sullivan and Ulster




Excludes building construction in Sullivan County


Modification Number     Publication Date
          1                01/30/2026
          2                05/18/2026
          3                10/08/2026


 ASBE0040-003 05/01/2025
                                                     Rates                  Fringes
HAZARDOUS MATERIAL HANDLER: DUTIES LIMITED TO 
PREPARATION WETTING; STRIPPING; REMOVAL; SCRAPPING; 
VACUUMING; BAGGING; AND DISPOSING OF ALL INSULATION 
MATERIALS WHETHER THEY CONTAIN ASBESTOS OR NOT FROM 
MECHANICAL SYSTEMS (SULLIVAN AND ULSTER COUNTIES)...$ 41.74                  27.58
INSULATOR/ASBESTOS WORKER: (INCLUDES APPLICATION OF 
ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, 
COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL 
SYSTEMS) (SULLIVAN AND ULSTER COUNTIES).............$ 41.74                  27.58
----------------------------------------------------------------

 ASBE0091-002 06/02/2025
                                                     Rates                  Fringes
HAZARDOUS MATERIAL HANDLER: DUTIES LIMITED TO 
PREPARATION, WETTING, STRIPPING, REMOVAL SCRAPPING, 
VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION 
MATERIALS; WHETHER THEY CONTAIN ASBESTOS OR NOT 
FROM MECHANCIAL SYSTEMS (DUTCHESS AND ORANGE 
COUNTIES)...........................................$ 46.62                  49.30
INSULATOR/ASBESTOS WORKER: (INCLUDES APPLICATION OF 
ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, 
COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL 
SYSTEMS) (DUTCHESS AND ORANGE COUNTIES).............$ 46.62                  49.30
----------------------------------------------------------------

 BOIL0005-001 01/01/2025
                                                     Rates                  Fringes
BOILERMAKER  (FOOTNOTE:  ADDITIONAL FRINGE BENEFITS 
INCLUDE THE FOLLOWING PAID HOLIDAYS:  NEW YEAR'S 
DAY, THANKSGIVING DAY, MEMORIAL DAY, INDEPENDENCE 
DAY, LABOR DAY AND GOOD FRIDAY, FRIDAY AFTER 
THANKSGIVING, CHRISTMAS EVE DAY AND NEW YEAR'S EVE).$ 68.88                  49.83
----------------------------------------------------------------

 BRNY0005-001 06/01/2024
                                                     Rates                  Fringes
BRICKLAYER (BUILDING CONSTRUCTION): BRICKLAYERS, 
CEMENT MASONS, PLASTERERS, STONE MASONS (DUTCHESS, 
ORANGE (EXCLUDING THE TOWN OF TUXEDO) AND ULSTER 
COUNTIES)...........................................$ 46.45                  37.50
BRICKLAYER (BUILDING CONSTRUCTION): BRICKLAYERS, 
CEMENT MASONS, PLASTERERS, STONE MASONS (ORANGE 
COUNTY (TOWN OF TUXEDO))............................$ 47.44                  38.00
BRICKLAYER (HEAVY CONSTRUCTION): BRICKLAYERS, 
CEMENT MASONS, PLASTERERS, STONE MASONS (DUTCHESS, 
ORANGE (EXCLUDING THE TOWN OF TUXEDO) AND ULSTER 
COUNTIES)...........................................$ 46.45                  37.50
BRICKLAYER (HEAVY CONSTRUCTION): BRICKLAYERS, 
CEMENT MASONS, PLASTERERS, STONE MASONS (ORANGE 
COUNTY (TOWN OF TUXEDO))............................$ 47.44                  38.00
BRICKLAYER (HIGHWAY CONSTRUCTION): BRICKLAYERS, 
CEMENT MASONS, PLASTERERS, STONE MASONS (DUTCHESS, 
ORANGE (EXCLUDING THE TOWN OF TUXEDO), SULLIVAN AND 
ULSTER COUNTIES)....................................$ 46.45                  37.50
----------------------------------------------------------------

 CARP0279-005 07/01/2025
                                                     Rates                  Fringes
CARPENTERS (BUILDING CONSTRUCTION): CARPENTERS, 
MILLWRIGHTS, PILE DRIVERS...........................$ 44.72                  31.23
CARPENTERS (HEAVY AND HIGHWAY CONSTRUCTION): 
CARPENTERS, MILLWRIGHTS, PILE DRIVERS...............$ 44.72                  31.23
----------------------------------------------------------------

 CARP0740-002 07/01/2025
                                                     Rates                  Fringes
MILLWRIGHT (DUTCHESS AND ORANGE COUNTIES)...........$ 47.83                  43.03
----------------------------------------------------------------

 CARP1556-005 07/01/2024
                                                     Rates                  Fringes
DIVER (DUTCHESS AND ORANGE COUNTIES)................$ 75.46                  55.84
DIVER TENDER (DUTCHESS AND ORANGE COUNTIES).........$ 55.00                  55.84
DOCK BUILDER & PILEDRIVERMEN (DUTCHESS AND ORANGE 
COUNTIES)...........................................$ 60.59                  55.84
----------------------------------------------------------------

 ELEC0363-001 04/01/2025
                                                     Rates                  Fringes
ELECTRICIAN (DUTCHESS (REMAINING TOWNSHIPS), ULSTER 
AND SULLIVAN COUNTIES) (FOOTNOTE: ADDITIONAL FRINGE 
BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW 
YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, FOURTH 
OF JULY, LABOR DAY, PRESIDENTIAL ELECTION DAY, 
VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER 
THANKSGIVING, CHRISTMAS DAY)........................$ 51.50                  42.22
ELECTRICIAN (ORANGE AND DUTCHESS (TOWNSHIPS OF 
FISHKILL, EAST FISHKILL AND BEACON) COUNTIES). 
(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE 
FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, 
PRESIDENT'S DAY, MEMORIAL DAY, FOURTH OF JULY, 
LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S 
DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, 
CHRISTMAS DAY)......................................$ 51.50                  42.22
----------------------------------------------------------------

 ELEC1249-002 05/05/2025
                                                     Rates                  Fringes
ELECTRICIAN (LINE CONSTRUCTION - LIGHTING AND 
TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC 
CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND 
TRAFFIC MONITORING SYSTEMS, ROAD WEATHER 
INFORMATION SYSTEMS): FLAGMAN  (ADDITIONAL FRINGE 
BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: 
MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD 
FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION 
DAY FOR THE PRESIDENT OF THE UNITED STATES AND 
ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, 
PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO 
DAYS AFTER THE HOLIDAY.)............................$ 32.51                  29.93
ELECTRICIAN (LINE CONSTRUCTION - LIGHTING AND 
TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC 
CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND 
TRAFFIC MONITORING SYSTEMS, ROAD WEATHER 
INFORMATION SYSTEMS): GROUNDMAN (DIGGING MACHINE 
OPERATOR).   (ADDITIONAL FRINGE BENEFITS INCLUDE 
THE FOLLOWING PAID HOLIDAYS: MEMORIAL DAY, NEW 
YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, 
DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY 
FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION 
DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED 
THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS 
AFTER THE HOLIDAY.).................................$ 48.77                  31.31
ELECTRICIAN (LINE CONSTRUCTION - LIGHTING AND 
TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC 
CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND 
TRAFFIC MONITORING SYSTEMS, ROAD WEATHER 
INFORMATION SYSTEMS): GROUNDMAN (TRUCK DRIVER). 
(ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING 
PAID HOLIDAYS: MEMORIAL DAY, NEW YEAR'S DAY, 
PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT 
OF THE UNITED STATES AND ELECTION DAY FOR THE 
GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE 
WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE 
HOLIDAY.)...........................................$ 43.35                  30.73
ELECTRICIAN (LINE CONSTRUCTION - LIGHTING AND 
TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC 
CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND 
TRAFFIC MONITORING SYSTEMS, ROAD WEATHER 
INFORMATION SYSTEMS): GROUNDMAN TRUCK DRIVER 
(TRACTOR TRAILER UNIT).  (ADDITIONAL FRINGE 
BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: 
MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD 
FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION 
DAY FOR THE PRESIDENT OF THE UNITED STATES AND 
ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, 
PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO 
DAYS AFTER THE HOLIDAY.)............................$ 43.35                  30.73
ELECTRICIAN (LINE CONSTRUCTION - LIGHTING AND 
TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC 
CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND 
TRAFFIC MONITORING SYSTEMS, ROAD WEATHER 
INFORMATION SYSTEMS): LINEMAN AND TECHNICIAN.  
(ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING 
PAID HOLIDAYS: MEMORIAL DAY, NEW YEAR'S DAY, 
PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT 
OF THE UNITED STATES AND ELECTION DAY FOR THE 
GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE 
WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE 
HOLIDAY.)...........................................$ 54.19                  35.69
ELECTRICIAN (LINE CONSTRUCTION - LIGHTING AND 
TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC 
CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND 
TRAFFIC MONITORING SYSTEMS, ROAD WEATHER 
INFORMATION SYSTEMS): MECHANIC.   (ADDITIONAL 
FRINGE BENEFITS INCLUDE THE FOLLOWING PAID 
HOLIDAYS: MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S 
DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, 
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND 
ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES 
AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK 
STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE 
OR TWO DAYS AFTER THE HOLIDAY.).....................$ 43.35                  30.73
----------------------------------------------------------------

 ELEC1249-004 05/05/2025
                                                     Rates                  Fringes
ELECTRICIAN (LINE CONSTRUCTION - OVERHEAD AND 
UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND 
ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK 
INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, 
FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT 
BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE 
OF GROUND FAULT PROTECTION AND FIBER OPTIC 
CAPABILITIES): LINEMAN AND TECHNICIAN. (FOOTNOTE: 
ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING 
PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, 
MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION 
DAY FOR THE PRESIDENT OF THE UNITED STATES AND 
ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, 
PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO 
DAYS AFTER THE HOLIDAY.)............................$ 61.56                  36.21
ELECTRICIAN (LINE CONSTRUCTION - OVERHEAD AND 
UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND 
ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK 
INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, 
FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT 
BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE 
OF GROUND FAULT PROTECTION AND FIBER OPTIC 
CAPABILITIES): FLAGMAN. (FOOTNOTE: ADDITIONAL 
FRINGE BENEFITS INCLUDE THE FOLLOWING PAID 
HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL 
DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY 
FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION 
DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED 
THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS 
AFTER THE HOLIDAY.).................................$ 35.34                  30.12
ELECTRICIAN (LINE CONSTRUCTION - OVERHEAD AND 
UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND 
ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK 
INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, 
FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT 
BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE 
OF GROUND FAULT PROTECTION AND FIBER OPTIC 
CAPABILITIES): GROUNDMAN DIGGING MACHINE OPERATOR . 
(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE 
FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, 
PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT 
OF THE UNITED STATES AND ELECTION DAY FOR THE 
GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE 
WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE 
HOLIDAY.)...........................................$ 55.40                  31.78
ELECTRICIAN (LINE CONSTRUCTION - OVERHEAD AND 
UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND 
ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK 
INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, 
FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT 
BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE 
OF GROUND FAULT PROTECTION AND FIBER OPTIC 
CAPABILITIES): GROUNDMAN TRUCK DRIVER. (FOOTNOTE: 
ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING 
PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, 
MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION 
DAY FOR THE PRESIDENT OF THE UNITED STATES AND 
ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, 
PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO 
DAYS AFTER THE HOLIDAY.) ...........................$ 49.25                  31.15
ELECTRICIAN (LINE CONSTRUCTION - OVERHEAD AND 
UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND 
ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK 
INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, 
FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT 
BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE 
OF GROUND FAULT PROTECTION AND FIBER OPTIC 
CAPABILITIES): GROUNDMAN TRUCK DRIVER (TRACTOR 
TRAILER UNIT). (FOOTNOTE: ADDITIONAL FRINGE 
BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW 
YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD 
FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING 
DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE 
PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR 
THE GOVERNOR OF NEW YORK STATE, PROVIDED THE 
EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER 
THE HOLIDAY.).......................................$ 49.25                  31.15
ELECTRICIAN (LINE CONSTRUCTION - OVERHEAD AND 
UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND 
ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK 
INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, 
FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT 
BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE 
OF GROUND FAULT PROTECTION AND FIBER OPTIC 
CAPABILITIES): MECHANIC. (FOOTNOTE: ADDITIONAL 
FRINGE BENEFITS INCLUDE THE FOLLOWING PAID 
HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL 
DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY 
FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION 
DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED 
THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS 
AFTER THE HOLIDAY.).................................$ 49.25                  31.15
ELECTRICIAN (LINE CONSTRUCTION - SUBSTATION): CABLE 
SPLICER. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS 
INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S 
DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT 
OF THE UNITED STATES AND ELECTION DAY FOR THE 
GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE 
WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE 
HOLIDAY.) ..........................................$ 63.14                  33.82
ELECTRICIAN (LINE CONSTRUCTION - SUBSTATION): 
FLAGMAN. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS 
INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S 
DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT 
OF THE UNITED STATES AND ELECTION DAY FOR THE 
GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE 
WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE 
HOLIDAY.) ..........................................$ 35.34                  30.12
ELECTRICIAN (LINE CONSTRUCTION - SUBSTATION): 
GROUND MAN TRUCK DRIVER. (FOOTNOTE: ADDITIONAL 
FRINGE BENEFITS INCLUDE THE FOLLOWING PAID 
HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL 
DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY 
FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION 
DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED 
THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS 
AFTER THE HOLIDAY.).................................$ 49.25                  31.15
ELECTRICIAN (LINE CONSTRUCTION - SUBSTATION): 
GROUNDMAN DIGGING MACHINE OPERATOR. (FOOTNOTE: 
ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING 
PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, 
MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION 
DAY FOR THE PRESIDENT OF THE UNITED STATES AND 
ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, 
PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO 
DAYS AFTER THE HOLIDAY.)............................$ 55.40                  31.78
ELECTRICIAN (LINE CONSTRUCTION - SUBSTATION): 
GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT). 
(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE 
FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, 
PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT 
OF THE UNITED STATES AND ELECTION DAY FOR THE 
GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE 
WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE 
HOLIDAY.) ..........................................$ 49.25                  31.15
ELECTRICIAN (LINE CONSTRUCTION - SUBSTATION): 
LINEMAN & TECHNICIAN. (FOOTNOTE: ADDITIONAL FRINGE 
BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW 
YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD 
FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING 
DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE 
PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR 
THE GOVERNOR OF NEW YORK STATE, PROVIDED THE 
EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER 
THE HOLIDAY.) ......................................$ 61.56                  36.21
ELECTRICIAN (LINE CONSTRUCTION - SUBSTATION): 
MECHANIC. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS 
INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S 
DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT 
OF THE UNITED STATES AND ELECTION DAY FOR THE 
GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE 
WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE 
HOLIDAY.) ..........................................$ 49.25                  31.15
ELECTRICIAN (LINE CONSTRUCTION - SWITCHING 
STRUCTURES; RAILROAD CATENARY INSTALLATION AND 
MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR 
GAS FILLED TRANSMISSION CONDUIT AND CABLE 
INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC 
GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR 
THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND 
FIBER OPTIC CAPABILITIES), PIPETYPE CABLE 
INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND 
MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE 
INSTALLATION): GROUNDMAN TRUCK DRIVER 
(TRACTOR-TRAILER UNIT). (FOOTNOTE: ADDITIONAL 
FRINGE BENEFITS INCLUDE THE FOLLOWING PAID 
HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL 
DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY 
FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION 
DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED 
THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS 
AFTER THE HOLIDAY.) ................................$ 49.25                  31.15
ELECTRICIAN (LINE CONSTRUCTION - SWITCHING 
STRUCTURES; RAILROAD CATENARY INSTALLATION AND 
MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR 
GAS FILLED TRANSMISSION CONDUIT AND CABLE 
INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC 
GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR 
THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND 
FIBER OPTIC CAPABILITIES), PIPETYPE CABLE 
INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND 
MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE 
INSTALLATION): CABLE SPLICER. (FOOTNOTE: ADDITIONAL 
FRINGE BENEFITS INCLUDE THE FOLLOWING PAID 
HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL 
DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY 
FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION 
DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED 
THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS 
AFTER THE HOLIDAY.)  ...............................$ 64.59                  42.92
ELECTRICIAN (LINE CONSTRUCTION - SWITCHING 
STRUCTURES; RAILROAD CATENARY INSTALLATION AND 
MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR 
GAS FILLED TRANSMISSION CONDUIT AND CABLE 
INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC 
GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR 
THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND 
FIBER OPTIC CAPABILITIES), PIPETYPE CABLE 
INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND 
MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE 
INSTALLATION): FLAGMAN. (FOOTNOTE: ADDITIONAL 
FRINGE BENEFITS INCLUDE THE FOLLOWING PAID 
HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL 
DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY 
FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION 
DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED 
THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS 
AFTER THE HOLIDAY.)  ...............................$ 35.34                  30.12
ELECTRICIAN (LINE CONSTRUCTION - SWITCHING 
STRUCTURES; RAILROAD CATENARY INSTALLATION AND 
MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR 
GAS FILLED TRANSMISSION CONDUIT AND CABLE 
INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC 
GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR 
THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND 
FIBER OPTIC CAPABILITIES), PIPETYPE CABLE 
INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND 
MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE 
INSTALLATION): GROUNDMAN DIGGING MACHINE OPERATOR. 
(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE 
FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, 
PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT 
OF THE UNITED STATES AND ELECTION DAY FOR THE 
GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE 
WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE 
HOLIDAY.)  .........................................$ 55.40                  31.78
ELECTRICIAN (LINE CONSTRUCTION - SWITCHING 
STRUCTURES; RAILROAD CATENARY INSTALLATION AND 
MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR 
GAS FILLED TRANSMISSION CONDUIT AND CABLE 
INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC 
GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR 
THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND 
FIBER OPTIC CAPABILITIES), PIPETYPE CABLE 
INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND 
MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE 
INSTALLATION): GROUNDMAN TRUCK DRIVER. (FOOTNOTE: 
ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING 
PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, 
MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION 
DAY FOR THE PRESIDENT OF THE UNITED STATES AND 
ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, 
PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO 
DAYS AFTER THE HOLIDAY.)  ..........................$ 49.25                  31.15
ELECTRICIAN (LINE CONSTRUCTION - SWITCHING 
STRUCTURES; RAILROAD CATENARY INSTALLATION AND 
MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR 
GAS FILLED TRANSMISSION CONDUIT AND CABLE 
INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC 
GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR 
THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND 
FIBER OPTIC CAPABILITIES), PIPETYPE CABLE 
INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND 
MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE 
INSTALLATION): LINEMAN & TECHNICIAN. (FOOTNOTE: 
ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING 
PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, 
MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION 
DAY FOR THE PRESIDENT OF THE UNITED STATES AND 
ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, 
PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO 
DAYS AFTER THE HOLIDAY.)  ..........................$ 61.56                  36.21
ELECTRICIAN (LINE CONSTRUCTION - SWITCHING 
STRUCTURES; RAILROAD CATENARY INSTALLATION AND 
MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR 
GAS FILLED TRANSMISSION CONDUIT AND CABLE 
INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC 
GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR 
THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND 
FIBER OPTIC CAPABILITIES), PIPETYPE CABLE 
INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND 
MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE 
INSTALLATION): MECHANIC. (FOOTNOTE: ADDITIONAL 
FRINGE BENEFITS INCLUDE THE FOLLOWING PAID 
HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL 
DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY 
FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION 
DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED 
THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS 
AFTER THE HOLIDAY.) ................................$ 49.25                  31.15
----------------------------------------------------------------

 ELEC1249-005 05/05/2025
                                                     Rates                  Fringes
ELECTRICIAN (LIGHTING AND TRAFFIC SIGNAL LINEMAN 
INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY 
FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING 
SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS): 
FLAGMAN. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS 
INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S 
DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S 
DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR 
THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY 
FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED 
THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER 
THE HOLIDAY) (SULLIVAN COUNTY)......................$ 35.34                  30.12
ELECTRICIAN (LIGHTING AND TRAFFIC SIGNAL LINEMAN 
INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY 
FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING 
SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS): 
GROUNDMAN (DIGGING MACHINE OPERATOR) (FOOTNOTE: 
ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING 
PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, 
DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF 
THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR 
OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE 
WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY) 
(SULLIVAN COUNTY)...................................$ 55.40                  31.78
ELECTRICIAN (LIGHTING AND TRAFFIC SIGNAL LINEMAN 
INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY 
FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING 
SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS): 
GROUNDMAN (TRUCK DRIVER) (FOOTNOTE: ADDITIONAL 
FRINGE BENEFITS INCLUDE THE FOLLOWING PAID 
HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, 
DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF 
THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR 
OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE 
WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY) 
(SULLIVAN COUNTY)...................................$ 49.25                  31.15
ELECTRICIAN (LIGHTING AND TRAFFIC SIGNAL LINEMAN 
INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY 
FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING 
SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS): 
GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) 
(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE 
FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL 
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, 
DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF 
THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR 
OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE 
WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY) 
(SULLIVAN COUNTY)...................................$ 49.25                  31.15
ELECTRICIAN (LIGHTING AND TRAFFIC SIGNAL LINEMAN 
INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY 
FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING 
SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS): 
LINEMAN & TECHNICIAN (FOOTNOTE: ADDITIONAL FRINGE 
BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW 
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS 
PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, 
ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES 
AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF 
NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY 
BEFORE OR THE DAY AFTER THE HOLIDAY) (SULLIVAN 
COUNTY).............................................$ 61.56                  36.21
ELECTRICIAN (LIGHTING AND TRAFFIC SIGNAL LINEMAN 
INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY 
FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING 
SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS): 
MECHANIC (FOOTNOTE: ADDITIONAL FRINGE BENEFITS 
INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S 
DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S 
DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR 
THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY 
FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED 
THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER 
THE HOLIDAY) (SULLIVAN COUNTY)......................$ 49.25                  31.15
----------------------------------------------------------------

 ELEC1249-008 01/01/2025
                                                     Rates                  Fringes
ELECTRICIAN (LINE CONSTRUCTION - TELEPHONE, CATV 
FIBEROPTICS CABLE AND EQUIPMENT): CABLE SPLICER  
(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE 
FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, 
PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, 
INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, 
THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS 
DAY.)...............................................$ 40.81                  6.99
ELECTRICIAN (LINE CONSTRUCTION - TELEPHONE, CATV 
FIBEROPTICS CABLE AND EQUIPMENT): GROUNDMAN 
(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE 
FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, 
PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, 
INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, 
THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS 
DAY.)...............................................$ 20.53                  6.39
ELECTRICIAN (LINE CONSTRUCTION - TELEPHONE, CATV 
FIBEROPTICS CABLE AND EQUIPMENT): INSTALLER 
REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT 
OPERATOR  (FOOTNOTE: ADDITIONAL FRINGE BENEFITS 
INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S 
DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, 
INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, 
THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS 
DAY.)...............................................$ 38.73                  6.93
----------------------------------------------------------------

 ELEV0138-001 01/01/2026
                                                     Rates                  Fringes
ELEVATOR MECHANIC  (ADDITIONAL FRINGE BENEFITS 
INCLUDE THE FOLLOWING: A.VACATION: 6%/UNDER 5 YEARS 
BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED.  
8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR 
ALL HOURS WORKED. AND B. PAID HOLIDAYS:  NEW YEAR'S 
DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; 
VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER 
THANKSGIVING DAY; AND CHRISTMAS DAY.)...............$ 76.12                  38.98
----------------------------------------------------------------

 ENGI0137-001 03/04/2024
                                                     Rates                  Fringes
POWER EQUIPMENT OPERATOR GROUP 1A (BUILDING 
CONSTRUCTION): CARRIER- TRAILER HORSE; 
CONCRETE-PORTABLE HOIST; CRANE & HOIST 
ENGINEER-STEEL (CONCRETE, MATERIAL, SUPERSTRUCTURE 
SUB- STRUCTURE); DERRICK (STONE-STEEL); ELEVATOR & 
CAGE; HOIST- SINGLE/DOUBLE OR TRIPLE DRUM; 
HOIST-PORTABLE MOBILE UNIT; HOIST ENGINEER-CONCERT 
(CRANE-DERRICK-MINE HOIST); HOIST ENGINEER- 
MATERIAL; OVERHEAD CRANE; POWER HOUSE PLANT; 
TELEPHIES (CABLEWAY); WHIRLY; MAINTENANCE ENGINEER; 
LULL HILIFT OR SIMILAR; HYDRAULIC CRANE 25 TON AND 
OVER; CHERRY PICKER 25 TONS AND OVER; BACKHOE 
OLIVER 88; FORDSON; DYNAHOE; DUAL PURPOSE AND 
SIMILAR MACHINES; BARBER GREEN LOADER-EUCLID LOADER 
OR SIMILAR TYPE; CONWAY OR SIMILAR MUCKING MACKING 
MACHINES; DRAGLINE; GRADALL; SHOVEL; BACKHOE ETC. 
(CRAWLER OR TRUCK); FRONT END LOADERS; HYDRAULIC 
BOOM; JERSEY SPREADER; LIFT SLAB CONSOLE; 
LETOURNEQU OR TOUNAPULL (SCRAPERS OVER 20 YDS 
STRUCK); MUCKING MACHINES; PAVEMENT BREAKER (AIR 
RAM); PAVER (CONCRETE); ROAD BORING MACHINE; ROAD 
MIX MACHINES; ROSS CARRIER AND SIMILAR MACHINES; 
POST HOLE DIGGER; SHOVEL (TUNNELS); SIDE BOOM; 
SPREADER (ASPHALT); SCOOPMOBILE-TRACTOR-SHOVEL OVER 
1 1/2 YDS. TRENCHING MACHINES VERMEER CONCRETE SAW 
TRENCHER AND SIMILAR; TRACTOR TYPE DEMOLITION 
EQUIPMENT; WINCH TRUCK (A FRAME); HYDRAULIC CRANE 
OVER 10 TON UP TO 25 TON); CHERRY PICKER OVER 10 
TON UP TO 25 TON) (NOTES: HAZMAT, 20% ABOVE REGULAR 
RATE. PUMPING OPERATION PREMIUM, $0.50. CRANE 
OPERATORS (100-149 FT), $2.00. CRANE OPERATORS (149 
FT+), $3.00. LOADER OPERATORS (OVER 5 CU. YD.), 
$0.50. SHOVEL OPERATORS (OVER 4 CU. YD.), $1.00)  
(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE 
FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL 
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, PLUS LINCOLN'S BIRTRHDAY, 
WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, 
NOVEMBER ELECTION DAY, VETERAN'S DAY.)  (DUTCHESS 
COUNTY (POUGHKEEPSIE AND SOUTH THEREOF))............$ 59.04                  31.32
POWER EQUIPMENT OPERATOR GROUP 1B (BUILDING 
CONSTRUCTION): COMPRESSOR (STEEL ERECTION); PULSE 
METER AND PUSH BUTTON BUZZ BOX; ELEVATOR; MECHANIC 
(OUTSIDE) ALL TYPES; WELDER; SCRAPERS 20 YDS STRUCK 
AND UNDER; MACHINE PULLING SHEEP'S FOOT ROLLER; 
VIBRATORY ROLLERS; ROLLER 4 TONS AND OVER. (NOTES: 
HAZMAT, 20% ABOVE REGULAR RATE. PUMPING OPERATION 
PREMIUM, $0.50. CRANE OPERATORS (100-149 FT), 
$2.00. CRANE OPERATORS (149 FT+), $3.00. LOADER 
OPERATORS (OVER 5 CU. YD.), $0.50. SHOVEL OPERATORS 
(OVER 4 CU. YD.), $1.00)  (FOOTNOTE: ADDITIONAL 
FRINGE BENEFITS INCLUDE THE FOLLOWING PAID 
HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, PLUS LINCOLN'S BIRTRHDAY, 
WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, 
NOVEMBER ELECTION DAY, VETERAN'S DAY.)  (DUTCHESS 
COUNTY (POUGHKEEPSIE AND SOUTH THEREOF))............$ 54.41                  31.32
POWER EQUIPMENT OPERATOR GROUP 2A (BUILDING 
CONSTRUCTION): COMPACTOR SELF-PROPELLED; GRADER; 
BULLDOZE D7 AND SIMILAR TRACTORS WITH A DRAW BAR 
HORSEPOWER OF 100 OR OVER; BULLDOZER D6 AND UNDER; 
WELDER; SCRAPER 20 YDS STRUCK AND UNDER; MACHINE 
PULLING SHEEP'S FOOT ROLLER; VIBRATORY ROLLERS. 
(NOTES: HAZMAT, 20% ABOVE REGULAR RATE. PUMPING 
OPERATION PREMIUM, $0.50. CRANE OPERATORS (100-149 
FT), $2.00. CRANE OPERATORS (149 FT+), $3.00. 
LOADER OPERATORS (OVER 5 CU. YD.), $0.50. SHOVEL 
OPERATORS (OVER 4 CU. YD.), $1.00)  (FOOTNOTE: 
ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING 
PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, PLUS LINCOLN'S BIRTRHDAY, 
WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, 
NOVEMBER ELECTION DAY, VETERAN'S DAY.)  (DUTCHESS 
COUNTY (POUGHKEEPSIE AND SOUTH THEREOF))............$ 56.97                  31.32
POWER EQUIPMENT OPERATOR GROUP 3A (BUILDING 
CONSTRUCTION): ASPHALT PLANT; BOILER (HIGH 
PRESSURE); CONCRETE MIXING PLANTS; CONCRETE PUMP; 
FIREMEN; FORKLIFT; FORKLIFT (ELECTRIC); JOY DRILL 
OR SIMILAR TRACTOR DRILLING MACHINE; LOADER - 1 1/2 
YARDS AND UNDER; LOCOMOTIVE (ALL SIZES); MIXER 
CONCRETE - 21E AND OVER; PORTABLE ASPHALT PLANT; 
PORTABLE BATCH PLANT; PORTABLE CRUSHER; QUARRY 
MASTER; STONE CRUSHER; WELL DRILLING MACHINE AND 
WELL POINT SYSTEM; CHERRY PICKER UNDER 10 TONS; 
HYDRAULIC CRANE UNDER 10 TONS; CONCERT BUFFY; ONE 
YARD AN UP RIDE ON DUMPER (BENFORD OR SIMILAR). 
(NOTES: HAZMAT, 20% ABOVE REGULAR RATE. PUMPING 
OPERATION PREMIUM, $0.50. CRANE OPERATORS (100-149 
FT), $2.00. CRANE OPERATORS (149 FT+), $3.00. 
LOADER OPERATORS (OVER 5 CU. YD.), $0.50. SHOVEL 
OPERATORS (OVER 4 CU. YD.), $1.00)  (FOOTNOTE: 
ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING 
PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, PLUS LINCOLN'S BIRTRHDAY, 
WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, 
NOVEMBER ELECTION DAY, VETERAN'S DAY.)  (DUTCHESS 
COUNTY (POUGHKEEPSIE AND SOUTH THEREOF))............$ 54.88                  31.32
POWER EQUIPMENT OPERATOR GROUP 3B (BUILDING 
CONSTRUCTION): COMPRESSOR OVER 125 CU. FEET; 
CONVEYOR BELT MACHINE REGARDLESS OF SIZE; LIGHTING 
UNIT (PORTABLE & GENERATOR); WELDING MACHINE (STEEL 
ERECTION AND EXCAVATION); AND COMPRESSOR PLANT; 
STUD MACHINE; LADDER HOIST. (NOTES: HAZMAT, 20% 
ABOVE REGULAR RATE. PUMPING OPERATION PREMIUM, 
$0.50. CRANE OPERATORS (100-149 FT), $2.00. CRANE 
OPERATORS (149 FT+), $3.00. LOADER OPERATORS (OVER 
5 CU. YD.), $0.50. SHOVEL OPERATORS (OVER 4 CU. 
YD.), $1.00)  (FOOTNOTE: ADDITIONAL FRINGE BENEFITS 
INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S 
DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S 
BIRTRHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, 
COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S 
DAY.)  (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH 
THEREOF))...........................................$ 52.25                  31.32
POWER EQUIPMENT OPERATOR GROUP 4A (BUILDING 
CONSTRUCTION): AIR TRACTOR DRILL; BATCH PLANT; 
BENDING MACHINE; CONCRETE BREAKER; CONCRETE 
SPREADER; CURB CUTTER MACHINE; FARM TRACTOR (ALL 
TYPES); FINISHING MACHINE-CONCRETE; HEPAVAC CLEAN 
AIR MACHINE (ALL SIMILAR TYPES: REMOVAL OF ASBESTOS 
ETC.); MATERIAL HOPPER-SAND-STONE-CEMENT; 
MIXER-CONCRETE-UNDER 21E; MULCHING GRASS SPREADER; 
PUMP-GYPSUM, ETC., PUMP-PLASTER-GROUT 
-FIREPROOFING; SHOP MECHANIC (NOT EMPLOYED ON JOB 
SITE); ROLLER UNDER 4 TON; SPREADING AND FINE 
GRADING MACHINE; STEEL CUTTING MACHINE; SYPHON 
PUMP-AIR-STEAM; TAR JOINT MACHINE; TURBO JET BURNER 
OR SIMILAR EQUIPMENT; VIBRATOR (1 TO 5); FINE 
GRADING MACHINE; ROOF HOIST (TUGGER HOIST); 
TELEVISION CAMERAS-WATER- SEWER-GAS-ETC. (NOTES: 
HAZMAT, 20% ABOVE REGULAR RATE. PUMPING OPERATION 
PREMIUM, $0.50. CRANE OPERATORS (100-149 FT), 
$2.00. CRANE OPERATORS (149 FT+), $3.00. LOADER 
OPERATORS (OVER 5 CU. YD.), $0.50. SHOVEL OPERATORS 
(OVER 4 CU. YD.), $1.00)  (FOOTNOTE: ADDITIONAL 
FRINGE BENEFITS INCLUDE THE FOLLOWING PAID 
HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, PLUS LINCOLN'S BIRTRHDAY, 
WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, 
NOVEMBER ELECTION DAY, VETERAN'S DAY.)  (DUTCHESS 
COUNTY (POUGHKEEPSIE AND SOUTH THEREOF))............$ 54.33                  31.32
POWER EQUIPMENT OPERATOR GROUP 4B (BUILDING 
CONSTRUCTION): COMPRESSOR TO 125 FEET; DUST; DUST 
COLLECTOR; HEATER ALL TYPES; PUMP; PUMP STATION 
(WATER AND SEWER); STEAM JENNY; SWEEPER; CHIPPER; 
MULCHER. (NOTES: HAZMAT, 20% ABOVE REGULAR RATE. 
PUMPING OPERATION PREMIUM, $0.50. CRANE OPERATORS 
(100-149 FT), $2.00. CRANE OPERATORS (149 FT+), 
$3.00. LOADER OPERATORS (OVER 5 CU. YD.), $0.50. 
SHOVEL OPERATORS (OVER 4 CU. YD.), $1.00)  
(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE 
FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL 
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, PLUS LINCOLN'S BIRTRHDAY, 
WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, 
NOVEMBER ELECTION DAY, VETERAN'S DAY.)  (DUTCHESS 
COUNTY (POUGHKEEPSIE AND SOUTH THEREOF))............$ 45.94                  31.32
POWER EQUIPMENT OPERATOR GROUP 5 (BUILDING 
CONSTRUCTION): MOTORIZED ROLLER (WALK BEHIND) 
(NOTES: HAZMAT, 20% ABOVE REGULAR RATE. PUMPING 
OPERATION PREMIUM, $0.50. CRANE OPERATORS (100-149 
FT), $2.00. CRANE OPERATORS (149 FT+), $3.00. 
LOADER OPERATORS (OVER 5 CU. YD.), $0.50. SHOVEL 
OPERATORS (OVER 4 CU. YD.), $1.00)  (FOOTNOTE: 
ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING 
PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, PLUS LINCOLN'S BIRTRHDAY, 
WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, 
NOVEMBER ELECTION DAY, VETERAN'S DAY.)  (DUTCHESS 
COUNTY (POUGHKEEPSIE AND SOUTH THEREOF))............$ 49.53                  31.32
POWER EQUIPMENT OPERATOR GROUP 5A (BUILDING 
CONSTRUCTION): MASTER MECHANIC (NOTES: HAZMAT, 20% 
ABOVE REGULAR RATE. PUMPING OPERATION PREMIUM, 
$0.50. CRANE OPERATORS (100-149 FT), $2.00. CRANE 
OPERATORS (149 FT+), $3.00. LOADER OPERATORS (OVER 
5 CU. YD.), $0.50. SHOVEL OPERATORS (OVER 4 CU. 
YD.), $1.00)  (FOOTNOTE: ADDITIONAL FRINGE BENEFITS 
INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S 
DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S 
BIRTRHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, 
COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S 
DAY.)  (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH 
THEREOF))...........................................$ 61.95                  31.32
POWER EQUIPMENT OPERATOR GROUP 5B (BUILDING 
CONSTRUCTION): UTILITY MAN (NOTES: HAZMAT, 20% 
ABOVE REGULAR RATE. PUMPING OPERATION PREMIUM, 
$0.50. CRANE OPERATORS (100-149 FT), $2.00. CRANE 
OPERATORS (149 FT+), $3.00. LOADER OPERATORS (OVER 
5 CU. YD.), $0.50. SHOVEL OPERATORS (OVER 4 CU. 
YD.), $1.00)  (FOOTNOTE: ADDITIONAL FRINGE BENEFITS 
INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S 
DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S 
BIRTRHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, 
COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S 
DAY.)  (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH 
THEREOF))...........................................$ 47.00                  31.32
POWER EQUIPMENT OPERATOR GROUP 6 (BUILDING 
CONSTRUCTION): WAREHOUSE MAN (NOTES: HAZMAT, 20% 
ABOVE REGULAR RATE. PUMPING OPERATION PREMIUM, 
$0.50. CRANE OPERATORS (100-149 FT), $2.00. CRANE 
OPERATORS (149 FT+), $3.00. LOADER OPERATORS (OVER 
5 CU. YD.), $0.50. SHOVEL OPERATORS (OVER 4 CU. 
YD.), $1.00)  (FOOTNOTE: ADDITIONAL FRINGE BENEFITS 
INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S 
DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S 
BIRTRHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, 
COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S 
DAY.)  (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH 
THEREOF))...........................................$ 49.26                  31.32
----------------------------------------------------------------

 ENGI0137-007 03/04/2024
                                                     Rates                  Fringes
POWER EQUIPMENT OPERATOR GROUP 1 (HEAVY & HIGHWAY): 
BOOM TRUCK; CHERRY PICKER; CLAMSHELL; CRANE, 
(CRAWLER, TRUCK); DRAGLINE; ROUGH TERRAIN CRANE  
(NOTES: LOADER OPERATOR (OVER 5 CU YDS), $0.50.  
SHOVAL OPERATORS (OVER 4 CU YD), $1.00.   HAZMAT 
PREMIUM OVER REGULAR RATE,  20%.  CRANES: 100 FT- 
149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 
FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.)  
(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE 
FOLLOWING PAID HOLIDAYS:  NEW YEAR'S DAY; LINCOLN'S 
BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE 
DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; 
NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND 
CHRISTMAS DAY) (POUGHKEEPSIE AND SOUTH THEREOF).....$ 68.63                  35.25
POWER EQUIPMENT OPERATOR GROUP 1-A (HEAVY & 
HIGHWAY): AUGER; AUTO GRADER; DYNAHOE AND DUAL 
PURPOSE AND SIMILAR MACHINES; BOAT CAPTAIN; BORING 
MACHINE (ALL TYPES); BULL DOZER-ALL SIZES; CENTRAL 
MIX PLANT OPERATOR; CHIPPER-ALL TYPES; CLOSE 
CIRCUIT T.V.; COMPACTOR WITH BLADE; CONCRETE 
PORTABLE HOIST; C.M.I. OR SIMILAR; CONWAY OR 
SIMILAR MUCKING MACHINES; GRADALL, SHOVEL BACKHOE, 
ETC. GRADER; DERRICK, (STONE- STEEL; ELEVATOR & 
CAGE, MATERIALS OR PASSENGERS; FRONT END LOADERS 
OVER 1 1/2 YDS.; HOIST SINGLE, DOUBLE, TRIPLE DRUM, 
HOIST PORTABLE MOBILE UNIT; HOIST ENGINEER-CONCRETE 
(CRANE-DERRICK-MINE HOIST); HOIST 
ENGINEER-MATERIAL, HYDRAULIC BOOM; LETOURNEAU OR 
TOURNAPULL (SCRAPERS OVER 20 YDS. STRUCK); LOG 
SKIDDER; MOVABLE CONCRETE BARRIER TRANSFER & 
TRANSPORT VEHICLE; MUCKING MACHINES; OVERHEAD 
CRANE; PAVER (CONCCRETE); PULSEMETER; PUSH BUTTON 
(BUZZ BOX) ELEVATOR; ROAD MIX MACHINES; ROBOT 
HAMMER (BROCK OR SIMILAR), ROSS CARRIER AND SIMILAR 
MACHINES; SHOVELS (TUNNELS); SIDE BOOM; SLIP FORM 
MACHINE; SPREADER (ASPHALT); 
SCOOPMOBILE-TRACTOR-SHOVEL OVER 1 1/2 YARDS; 
TRENCHING MACHINES; TELEPHIES- VERMEER CONCRETE SAW 
TRENCHER AND/OR SIMILAR; TRACTOR-TYPE DEMOLITION 
EQUIPMENT, WHIRLY  (NOTES: LOADER OPERATOR (OVER 5 
CU YDS), $0.50.  SHOVAL OPERATORS (OVER 4 CU YD), 
$1.00.   HAZMAT PREMIUM OVER REGULAR RATE,  20%.  
CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN 
GROUP 1 RATE. 149 FT AND OVER RECEIVE $3.00 MORE 
THAN GROUP 1 RATE.)  (FOOTNOTE: ADDITIONAL FRINGE 
BENEFITS INLCLUDE THE FOLLOWING PAID HOLIDAYS:  NEW 
YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; 
MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS 
DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; 
THANKSGIVING DAY; AND CHRISTMAS DAY) (POUGHKEEPSIE 
AND SOUTH THEREOF)..................................$ 60.42                  35.25
POWER EQUIPMENT OPERATOR GROUP 1-B (HEAVY & 
HIGHWAY): ROAD PAVER, ASPHALT  (NOTES: LOADER 
OPERATOR (OVER 5 CU YDS), $0.50.  SHOVAL OPERATORS 
(OVER 4 CU YD), $1.00.   HAZMAT PREMIUM OVER 
REGULAR RATE,  20%.  CRANES: 100 FT- 149 FT: 
RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 FT AND 
OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.)  
(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE 
FOLLOWING PAID HOLIDAYS:  NEW YEAR'S DAY; LINCOLN'S 
BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE 
DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; 
NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND 
CHRISTMAS DAY) (POUGHKEEPSIE AND SOUTH THEREOF).....$ 63.70                  35.25
POWER EQUIPMENT OPERATOR GROUP 2-A (HEAVY & 
HIGHWAY): BALLAST REGULATORS; COMPACTOR 
SELF-PROPELLED; COW TRACKS; FUSION MACHINE; RAIL 
ANCHOR MACHINES; ROLLER 4 TON AND OVER; SCRAPERS - 
20 YARDS STRUCK; SWITCH TAMPERS; VIBRATORY ROLLER, 
ETC.  (NOTES: LOADER OPERATOR (OVER 5 CU YDS), 
$0.50.  SHOVAL OPERATORS (OVER 4 CU YD), $1.00.   
HAZMAT PREMIUM OVER REGULAR RATE,  20%.  CRANES: 
100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 
RATE. 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 
1 RATE.)  (FOOTNOTE: ADDITIONAL FRINGE BENEFITS 
INLCLUDE THE FOLLOWING PAID HOLIDAYS:  NEW YEAR'S 
DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; 
INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS 
DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND 
CHRISTMAS DAY) (POUGHKEEPSIE AND SOUTH THEREOF).....$ 57.84                  35.25
POWER EQUIPMENT OPERATOR GROUP 2-B (HEAVY & 
HIGHWAY): MECHANIC (OUTSIDE) ALL TYPES   (NOTES: 
LOADER OPERATOR (OVER 5 CU YDS), $0.50.  SHOVAL 
OPERATORS (OVER 4 CU YD), $1.00.   HAZMAT PREMIUM 
OVER REGULAR RATE,  20%.  CRANES: 100 FT- 149 FT: 
RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 FT AND 
OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.)  
(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE 
FOLLOWING PAID HOLIDAYS:  NEW YEAR'S DAY; LINCOLN'S 
BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE 
DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; 
NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND 
CHRISTMAS DAY) (POUGHKEEPSIE AND SOUTH THEREOF).....$ 59.67                  35.25
POWER EQUIPMENT OPERATOR GROUP 3 (HEAVY & HIGHWAY): 
A:  AIR TRACTOR DRILL; ASPHALT PLANT; BATCH PLANT; 
BOILER (HIGH PRESSURE; CONCRETE BREAKER; CONCRETE 
PUMP CONCRETE SPREADER; CURB CUTTER MACHINE; FARM 
TRACTOR (ALL TYPES); FINISHING MACHINE (CONCRETE); 
FINE GRADING MACHINE; FIREMAN; FORKLIFT; FORKLIFT 
(ELECTRIC); JOY DRILL OR SIMILAR TRACTOR DRILLING 
MACHINE; LOADER - 1 1/2 YARDS AND UNDER; LOCOMOTIVE 
(ALL SIZES), MAINTENANCE ENGINEER; MACHINE PULLING 
SHEEPS FOOT ROLLER; MATERIAL HOPPER; MIXER CONCRETE 
- 21-E AND OVER; MULCHING GRASS SPREADER; PORTABLE 
ASPHALT PLANT, PORTABLE BATCH PLANT, PORTABLE 
CRUSHER; POWERHOUSE PLANT; QUARRY MASTER; ROLLER 
UNDER 4 TON; SPREADING AND FINE GRADING MACHINE; 
STEEL CUTTING MACHINE; STONE CRUSHER; SWEEPER; 
TURBOJET BURNER OR SIMILAR; WELL DRILLING MACHINE ; 
WINCH TRUCK ""A"" FRAME. JOHN HENRY DRILL OR SIMILAR. 
 (NOTES: LOADER OPERATOR (OVER 5 CU YDS), $0.50.  
SHOVAL OPERATORS (OVER 4 CU YD), $1.00.   HAZMAT 
PREMIUM OVER REGULAR RATE,  20%.  CRANES: 100 FT- 
149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 
FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.)  
(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE 
FOLLOWING PAID HOLIDAYS:  NEW YEAR'S DAY; LINCOLN'S 
BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE 
DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; 
NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND 
CHRISTMAS DAY) (POUGHKEEPSIE AND SOUTH THEREOF).....$ 56.81                  35.25
POWER EQUIPMENT OPERATOR GROUP 4-A (HEAVY & 
HIGHWAY): SERVICE MEN (FUEL OR GREASE TRUCK). 
(NOTES: LOADER OPERATOR (OVER 5 CU YDS), $0.50.  
SHOVAL OPERATORS (OVER 4 CU YD), $1.00.   HAZMAT 
PREMIUM OVER REGULAR RATE,  20%.  CRANES: 100 FT- 
149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 
FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.)  
(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE 
FOLLOWING PAID HOLIDAYS:  NEW YEAR'S DAY; LINCOLN'S 
BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE 
DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; 
NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND 
CHRISTMAS DAY) (POUGHKEEPSIE AND SOUTH THEREOF).....$ 51.57                  35.25
POWER EQUIPMENT OPERATOR GROUP 4-B (HEAVY & 
HIGHWAY): OILER; COMPRESSOR - COMPRESSOR PLANT; 
PAINT COMPRESSOR-STEEL ERECTION; CONVEYOR BELT 
MACHINE; LIGHTING UNIT (PORTABLE & GENERATOR); 
OILER; PUMPS - PUMP STATION-WATER-SEWER- GYPSUM- 
PLASTER, ETC.; ROLLER-MOTORIZED (WALK-BEHIND); 
WELDING MACHINE (STEEL ERECTION EXCAVATION); WELL 
POINT SYSTEM; BENDING MACHINE; DUST COLLECTOR; 
MIXER - CONCRETE UNDER 21-E; HEATER ALL TYPES; 
STEAM JENNY; SYPHON PUMP-AIR-STEAM; TAR JOINT 
MACHINE; VIBRATOR (1 TO 5); COMPRESSOR TRUCK 
MOUNTED (2-6)  (NOTES: LOADER OPERATOR (OVER 5 CU 
YDS), $0.50.  SHOVAL OPERATORS (OVER 4 CU YD), 
$1.00.   HAZMAT PREMIUM OVER REGULAR RATE,  20%.  
CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN 
GROUP 1 RATE. 149 FT AND OVER RECEIVE $3.00 MORE 
THAN GROUP 1 RATE.)  (FOOTNOTE: ADDITIONAL FRINGE 
BENEFITS INLCLUDE THE FOLLOWING PAID HOLIDAYS:  NEW 
YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; 
MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS 
DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; 
THANKSGIVING DAY; AND CHRISTMAS DAY) (POUGHKEEPSIE 
AND SOUTH THEREOF)..................................$ 44.19                  35.25
POWER EQUIPMENT OPERATOR GROUP 5 (HEAVY & 
HIGHWAY):OILER  (NOTES: LOADER OPERATOR (OVER 5 CU 
YDS), $0.50.  SHOVAL OPERATORS (OVER 4 CU YD), 
$1.00.   HAZMAT PREMIUM OVER REGULAR RATE,  20%.  
CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN 
GROUP 1 RATE. 149 FT AND OVER RECEIVE $3.00 MORE 
THAN GROUP 1 RATE.)  (FOOTNOTE: ADDITIONAL FRINGE 
BENEFITS INLCLUDE THE FOLLOWING PAID HOLIDAYS:  NEW 
YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; 
MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS 
DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; 
THANKSGIVING DAY; AND CHRISTMAS DAY) (POUGHKEEPSIE 
AND SOUTH THEREOF)..................................$ 64.02                  35.25
POWER EQUIPMENT OPERATOR GROUP 5-A-1 (HEAVY & 
HIGHWAY):  MASTER MECHANIC  (NOTES: LOADER OPERATOR 
(OVER 5 CU YDS), $0.50.  SHOVAL OPERATORS (OVER 4 
CU YD), $1.00.   HAZMAT PREMIUM OVER REGULAR RATE,  
20%.  CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE 
THAN GROUP 1 RATE. 149 FT AND OVER RECEIVE $3.00 
MORE THAN GROUP 1 RATE.)  (FOOTNOTE: ADDITIONAL 
FRINGE BENEFITS INLCLUDE THE FOLLOWING PAID 
HOLIDAYS:  NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD 
FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; 
VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; 
THANKSGIVING DAY; AND CHRISTMAS DAY) (POUGHKEEPSIE 
AND SOUTH THEREOF)..................................$ 64.02                  35.25
POWER EQUIPMENT OPERATOR GROUP 5-A-2 (HEAVY & 
HIGHWAY): ENGINEER - ALL TOWER CRANES, ALL CLIMBING 
CRANES AND ALL CRANES OF 100 TON CAPACITY OR 
GREATER (3900 MANITOWAC OR SIMILAR) IRRESPECTIVE OF 
MANUFACTURER AND REGARDLESS OF HOW THE SAME IS 
RIGGED (EXCEPT FOR PILE RIGS). (NOTES: LOADER 
OPERATOR (OVER 5 CU YDS), $0.50.  SHOVAL OPERATORS 
(OVER 4 CU YD), $1.00.   HAZMAT PREMIUM OVER 
REGULAR RATE,  20%.  CRANES: 100 FT- 149 FT: 
RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 FT AND 
OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.)  
(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE 
FOLLOWING PAID HOLIDAYS:  NEW YEAR'S DAY; LINCOLN'S 
BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE 
DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; 
NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND 
CHRISTMAS DAY) (POUGHKEEPSIE AND SOUTH THEREOF).....$ 77.82                  35.25
POWER EQUIPMENT OPERATOR GROUP 5-A-3 (HEAVY & 
HIGHWAY):  ENGINEER-- PILE DRIVER  (NOTES: LOADER 
OPERATOR (OVER 5 CU YDS), $0.50.  SHOVAL OPERATORS 
(OVER 4 CU YD), $1.00.   HAZMAT PREMIUM OVER 
REGULAR RATE,  20%.  CRANES: 100 FT- 149 FT: 
RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 FT AND 
OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.)  
(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE 
FOLLOWING PAID HOLIDAYS:  NEW YEAR'S DAY; LINCOLN'S 
BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE 
DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; 
NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND 
CHRISTMAS DAY) (POUGHKEEPSIE AND SOUTH THEREOF).....$ 75.13                  35.25
POWER EQUIPMENT OPERATOR GROUP 5-A-4 (HEAVY & 
HIGHWAY): HOIST ENGINEER- STEEL -SUB STRUCTURE  
(NOTES: LOADER OPERATOR (OVER 5 CU YDS), $0.50.  
SHOVAL OPERATORS (OVER 4 CU YD), $1.00.   HAZMAT 
PREMIUM OVER REGULAR RATE,  20%.  CRANES: 100 FT- 
149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 
FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.)  
(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE 
FOLLOWING PAID HOLIDAYS:  NEW YEAR'S DAY; LINCOLN'S 
BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE 
DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; 
NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND 
CHRISTMAS DAY) (POUGHKEEPSIE AND SOUTH THEREOF).....$ 70.41                  35.25
POWER EQUIPMENT OPERATOR GROUP 5-A-5 (HEAVY & 
HIGHWAY): JERSEY-SPREADER, PAVEMENT BREAKER (AIR 
RAM); POST HOLE DIGGER  (NOTES: LOADER OPERATOR 
(OVER 5 CU YDS), $0.50.  SHOVAL OPERATORS (OVER 4 
CU YD), $1.00.   HAZMAT PREMIUM OVER REGULAR RATE,  
20%.  CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE 
THAN GROUP 1 RATE. 149 FT AND OVER RECEIVE $3.00 
MORE THAN GROUP 1 RATE.)  (FOOTNOTE: ADDITIONAL 
FRINGE BENEFITS INLCLUDE THE FOLLOWING PAID 
HOLIDAYS:  NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD 
FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; 
VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; 
THANKSGIVING DAY; AND CHRISTMAS DAY) (POUGHKEEPSIE 
AND SOUTH THEREOF)..................................$ 59.19                  35.25
----------------------------------------------------------------

 ENGI0158-006 07/01/2025
                                                     Rates                  Fringes
POWER EQUIPMENT OPERATORS GROUP A (BUILDING 
CONSTRUCTION): SHOVEL, ALL EXCAVATOR (EXCEPT 
TRACTOR MOUNTED RUBBER TIRED JOHN DEERE 510 OR 
SMALLER), GRADALLS, POWER ROAD GRADER, ALL CMI 
EQUIPMENT, FRONT-END RUBBER TIRE LOADER, 
TRACTOR-MOUNTED DRILL (QUARRY MASTER), MUCKING 
MACHINE, CONCRETE CENTRAL MIX PLANT, CONCRETE PUMP, 
BELCRETE SYSTEM, AUTOMATED ASPHALT CONCRETE PLANT 
AND TRACTOR ROAD PAVER, BOOM TRUCK (5 TONS AND 
UNDER).  (NOTE: HAZARDOUS WORK - ANYTIME OPERATING 
ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50 
PER HOUR OVER REGULAR RATE.)  (FOOTNOTE: ADDITIONAL 
FRINGE BENEFITS INCLUDE THE FOLLOWING PAID 
HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY) (NORTHERN PART OF DUTCHESS (TO THE 
NORTHEN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE) .$ 54.93                  33.20
POWER EQUIPMENT OPERATORS GROUP A(1) (BUILDLING 
CONSTRUCTION):  CRANE, HYDRAULIC CRANES, TOWER 
CRANE, LOCOMOTIVE CRANE, PILEDRIVER, CABLEWAY, 
DERRICKS, WHIRLIES, DRAGLINE, BOOM TRUCK (OVER 5 
TONS)   (GROUP A(1) CRANE PREMIUMS: OVER 150', ADD 
$1.00.   OVER 200', ADD $2.00.)   (NOTE: HAZARDOUS 
WORK - ANYTIME OPERATING ENGINEERS ARE INVOLVED 
WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER REGULAR 
RATE.)  (FOOTNOTE: ADDITIONAL FRINGE BENEFITS 
INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S 
DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY) (NORTHERN PART OF 
DUTCHESS (TO THE NORTHEN BOUNDARY LINE OF THE CITY 
OF POUGHKEEPSIE) ...................................$ 55.42                  33.20
POWER EQUIPMENT OPERATORS GROUP B (BUILDING 
CONSTRUCTION) BACKHOE, (TRACTOR MOUNTED RUBBER 
TIRED EQUIVALENT TO JOHN DEERE 510 OR LESS), 
BULLDOZER, PUSHCAT, TRACTOR, TRAXCAVATOR, SCRAPER, 
LETOURNEAU GRADER, FORM FINE GRADER, ROAD ROLLER, 
BLACKTOP ROLLER, BLACKTOP SPREADER, POWER BROOMS, 
SWEEPERS, TRENCHING MACHINE, BARBER GREEN LOADER, 
SIDE BOOMS, HYDROHAMMER, CONCRETE SPREADER, 
CONCRETE FINISHING MACHINE, ONE DRUM HOIST, POWER 
HOSTING (SINGLE DRUM), HOIST - TWO DRUM OR MORE, 
THREE DRUM ENGINE, POWER HOISTING (TWO DRUM AND 
OVER), TWO DRUM AND SWINGING ENGINE, THREE DRUM 
SWINGING ENGINE, HOD HOIST, A-L FRAME WINCHES, CORD 
AND WELL DRILLERS (ONE DRUM), POST  HOLE DIGGER, 
MODEL CHB VIBRO-TAMP OR SIMILAR MACHINE, BATCH BIN 
AND PLANT OPERATOR, DINKEY LOCOMOTIVE, SKID STEER 
LOADER, TRACK EXCAVATOR 5/8 CU. YD. OR SMALLER.   
(NOTE: HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS 
ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR 
OVER REGULAR RATE.)  (FOOTNOTE: ADDITIONAL FRINGE 
BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW 
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY, CHRISTMAS DAY) (NORTHERN 
PART OF DUTCHESS (TO THE NORTHEN BOUNDARY LINE OF 
THE CITY OF POUGHKEEPSIE) ..........................$ 53.91                  33.20
POWER EQUIPMENT OPERATORS GROUP C (BUILDLING 
CONSTRUCTION): FORK LIFT, HIGH LIFT, LULL, OILER, 
FIREMAN AND HEAVY- DUTY GREASER, BOILERS, AND STEAM 
GENERATORS, PUMP, VIBRATOR, MOTOR MIXER, AIR 
COMPRESSOR, DUST COLLECTOR, WELDING MACHINE, WELL 
POINT, MECHANICAL HEATER, GENERATORS, TEMPORARY 
LIGHT PLANTS, CONCRETE PUMPS, ELECTRIC SUBMERSIBLE 
PUMP 4"" AND OVER, MURPHY TYPE DIESEL GENERATOR, 
CONVEYOR, ELEVATORS, CONCRETE MIXER AND BELCRETE 
POWER PACK (BELCRETE SYSTEM), SEEDING, AND MULCHING 
MACHINES, PUMPS.  (NOTE: HAZARDOUS WORK - ANYTIME 
OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR 
ABOVE, $2.50 PER HOUR OVER REGULAR RATE.)  
(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE 
FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL 
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY) (NORTHERN PART OF DUTCHESS (TO THE 
NORTHEN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE) .$ 51.01                  33.20
------------------------------

Source: the U.S. Department of Labor's register of wage determinations, read every week. Federal Bid Alerts is independent; check the wage determination in your solicitation before you bid.