4 Counties in New York Davis-Bacon Wage Rates: Building, Heavy and Highway
Updated
Federal prevailing wage rates (Davis-Bacon) for building, heavy and highway construction in 4 Counties in New York: 19 classifications, base rates from $35.94 to $75.46 an hour plus fringe benefits. General decision NY20260007, modification 3, published Oct 8, 2026.
| Type | Davis-Bacon (construction) |
|---|---|
| Number | NY20260007 |
| Modification | 3 |
| Published | Oct 8, 2026 |
| State | New York |
| Area | New York Counties of Dutchess, Orange, Sullivan and Ulster |
| Construction type | Building, Heavy and Highway |
Wage rates and fringe benefits (19)
| Classification | Base rate | Fringe | Total | New York median |
|---|---|---|---|---|
| Bricklayer (Heavy Construction): Bricklayers, Cement Masons, Plasterers, Stone Masons (Orange County (Town of Tuxedo)) | $47.44 | $38.00 | $85.44 | |
| Carpenters (Building Construction): Carpenters, Millwrights, Pile Drivers | $44.72 | $31.23 | $75.95 | |
| Carpenters (Heavy and Highway Construction): Carpenters, Millwrights, Pile Drivers | $44.72 | $31.23 | $75.95 | |
| Millwright (Dutchess and Orange Counties) | $47.83 | $43.03 | $90.86 | $39.88 (+$7.95) |
| Diver (Dutchess and Orange Counties) | $75.46 | $55.84 | $131.30 | |
| Diver Tender (Dutchess and Orange Counties) | $55.00 | $55.84 | $110.84 | |
| Dock Builder & Piledrivermen (Dutchess and Orange Counties) | $60.59 | $55.84 | $116.43 | |
| Laborer (Building Construction) Group 2: Forklift for Masonry Purposes (Orange and Ulster Counties) | $37.75 | $27.15 | $64.90 | |
| Laborers (Building Construction) Group 3: Blasters, Laser Beam Operator. (Dutchess County) | $43.45 | $32.90 | $76.35 | |
| Glazier (Dutchess, Orange, Sullivan and Ulster Counties) | $49.20 | $57.20 | $106.40 | $31.05 (+$18.15) |
| Painters: Drywall Finishers | $35.94 | $24.66 | $60.60 | |
| Painters: Lead Abatement Work | $35.94 | $24.66 | $60.60 | |
| Painters: Painter/Paperhanger | $35.94 | $24.66 | $60.60 | |
| Painters: Spray Rate | $36.94 | $24.66 | $61.60 | |
| Painter: Structural Steel and Bridge (Dutchess, Orange, Sullivan and Ulster Counties) | $56.25 | $55.14 | $111.39 | |
| Plumber/Pipefitter (Zone 2 Dutchess County and the Remainder of Ulster County) | $60.66 | $45.35 | $106.01 | |
| Roofer | $50.25 | $32.62 | $82.87 | $34.10 (+$16.15) |
| Sprinkler Fitter | $57.20 | $32.66 | $89.86 | $47.85 (+$9.35) |
| Sheet Metal Worker | $55.29 | $47.43 | $102.72 | $41.25 (+$14.04) |
The median is the middle rate for the same work across New York's building, heavy and highway wage determinations in force today, shown when at least three have it.
How to use these rates
On a federal or federally funded construction contract over $2,000, every laborer and mechanic on site must be paid at least the base rate for the work they do, plus the fringe benefit amount, either as benefits or in cash. The wage determination that applies is the one included in the solicitation, at the modification in force when bids open; a later modification only counts if it is published early enough before bid opening. Classifications missing here are added through a conformance request. The full text below has the footnotes, the paid holidays and any rate notes.
Other Davis-Bacon building, heavy and highway wage determinations in New York
- Monroe County, New York NY20260010
- 10 Counties in New York NY20260002
- Putnam County, New York NY20260025
- Livingston County, New York NY20260030
- Herkimer County, New York NY20260031
- Ontario County, New York NY20260032
- Orleans County, New York NY20260034
- Warren County, New York NY20260039
- Broome and Chenango Counties, New York NY20260004
- Tioga County, New York NY20260045
- Chemung and Schuyler Counties, New York NY20260005
All New York prevailing wage rates · Open federal bids in New York
Full text of NY20260007
Show the official text (120,535 characters)
General Decision Number: NY20260007 10/08/2026
State: New York
Construction Types: Building, Heavy and Highway
Counties: New York Counties of
Dutchess, Orange, Sullivan and Ulster
Excludes building construction in Sullivan County
Modification Number Publication Date
1 01/30/2026
2 05/18/2026
3 10/08/2026
ASBE0040-003 05/01/2025
Rates Fringes
HAZARDOUS MATERIAL HANDLER: DUTIES LIMITED TO
PREPARATION WETTING; STRIPPING; REMOVAL; SCRAPPING;
VACUUMING; BAGGING; AND DISPOSING OF ALL INSULATION
MATERIALS WHETHER THEY CONTAIN ASBESTOS OR NOT FROM
MECHANICAL SYSTEMS (SULLIVAN AND ULSTER COUNTIES)...$ 41.74 27.58
INSULATOR/ASBESTOS WORKER: (INCLUDES APPLICATION OF
ALL INSULATING MATERIALS, PROTECTIVE COVERINGS,
COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL
SYSTEMS) (SULLIVAN AND ULSTER COUNTIES).............$ 41.74 27.58
----------------------------------------------------------------
ASBE0091-002 06/02/2025
Rates Fringes
HAZARDOUS MATERIAL HANDLER: DUTIES LIMITED TO
PREPARATION, WETTING, STRIPPING, REMOVAL SCRAPPING,
VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION
MATERIALS; WHETHER THEY CONTAIN ASBESTOS OR NOT
FROM MECHANCIAL SYSTEMS (DUTCHESS AND ORANGE
COUNTIES)...........................................$ 46.62 49.30
INSULATOR/ASBESTOS WORKER: (INCLUDES APPLICATION OF
ALL INSULATING MATERIALS, PROTECTIVE COVERINGS,
COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL
SYSTEMS) (DUTCHESS AND ORANGE COUNTIES).............$ 46.62 49.30
----------------------------------------------------------------
BOIL0005-001 01/01/2025
Rates Fringes
BOILERMAKER (FOOTNOTE: ADDITIONAL FRINGE BENEFITS
INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S
DAY, THANKSGIVING DAY, MEMORIAL DAY, INDEPENDENCE
DAY, LABOR DAY AND GOOD FRIDAY, FRIDAY AFTER
THANKSGIVING, CHRISTMAS EVE DAY AND NEW YEAR'S EVE).$ 68.88 49.83
----------------------------------------------------------------
BRNY0005-001 06/01/2024
Rates Fringes
BRICKLAYER (BUILDING CONSTRUCTION): BRICKLAYERS,
CEMENT MASONS, PLASTERERS, STONE MASONS (DUTCHESS,
ORANGE (EXCLUDING THE TOWN OF TUXEDO) AND ULSTER
COUNTIES)...........................................$ 46.45 37.50
BRICKLAYER (BUILDING CONSTRUCTION): BRICKLAYERS,
CEMENT MASONS, PLASTERERS, STONE MASONS (ORANGE
COUNTY (TOWN OF TUXEDO))............................$ 47.44 38.00
BRICKLAYER (HEAVY CONSTRUCTION): BRICKLAYERS,
CEMENT MASONS, PLASTERERS, STONE MASONS (DUTCHESS,
ORANGE (EXCLUDING THE TOWN OF TUXEDO) AND ULSTER
COUNTIES)...........................................$ 46.45 37.50
BRICKLAYER (HEAVY CONSTRUCTION): BRICKLAYERS,
CEMENT MASONS, PLASTERERS, STONE MASONS (ORANGE
COUNTY (TOWN OF TUXEDO))............................$ 47.44 38.00
BRICKLAYER (HIGHWAY CONSTRUCTION): BRICKLAYERS,
CEMENT MASONS, PLASTERERS, STONE MASONS (DUTCHESS,
ORANGE (EXCLUDING THE TOWN OF TUXEDO), SULLIVAN AND
ULSTER COUNTIES)....................................$ 46.45 37.50
----------------------------------------------------------------
CARP0279-005 07/01/2025
Rates Fringes
CARPENTERS (BUILDING CONSTRUCTION): CARPENTERS,
MILLWRIGHTS, PILE DRIVERS...........................$ 44.72 31.23
CARPENTERS (HEAVY AND HIGHWAY CONSTRUCTION):
CARPENTERS, MILLWRIGHTS, PILE DRIVERS...............$ 44.72 31.23
----------------------------------------------------------------
CARP0740-002 07/01/2025
Rates Fringes
MILLWRIGHT (DUTCHESS AND ORANGE COUNTIES)...........$ 47.83 43.03
----------------------------------------------------------------
CARP1556-005 07/01/2024
Rates Fringes
DIVER (DUTCHESS AND ORANGE COUNTIES)................$ 75.46 55.84
DIVER TENDER (DUTCHESS AND ORANGE COUNTIES).........$ 55.00 55.84
DOCK BUILDER & PILEDRIVERMEN (DUTCHESS AND ORANGE
COUNTIES)...........................................$ 60.59 55.84
----------------------------------------------------------------
ELEC0363-001 04/01/2025
Rates Fringes
ELECTRICIAN (DUTCHESS (REMAINING TOWNSHIPS), ULSTER
AND SULLIVAN COUNTIES) (FOOTNOTE: ADDITIONAL FRINGE
BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW
YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, FOURTH
OF JULY, LABOR DAY, PRESIDENTIAL ELECTION DAY,
VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER
THANKSGIVING, CHRISTMAS DAY)........................$ 51.50 42.22
ELECTRICIAN (ORANGE AND DUTCHESS (TOWNSHIPS OF
FISHKILL, EAST FISHKILL AND BEACON) COUNTIES).
(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE
FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, FOURTH OF JULY,
LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S
DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING,
CHRISTMAS DAY)......................................$ 51.50 42.22
----------------------------------------------------------------
ELEC1249-002 05/05/2025
Rates Fringes
ELECTRICIAN (LINE CONSTRUCTION - LIGHTING AND
TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC
CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND
TRAFFIC MONITORING SYSTEMS, ROAD WEATHER
INFORMATION SYSTEMS): FLAGMAN (ADDITIONAL FRINGE
BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS:
MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD
FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION
DAY FOR THE PRESIDENT OF THE UNITED STATES AND
ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE,
PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO
DAYS AFTER THE HOLIDAY.)............................$ 32.51 29.93
ELECTRICIAN (LINE CONSTRUCTION - LIGHTING AND
TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC
CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND
TRAFFIC MONITORING SYSTEMS, ROAD WEATHER
INFORMATION SYSTEMS): GROUNDMAN (DIGGING MACHINE
OPERATOR). (ADDITIONAL FRINGE BENEFITS INCLUDE
THE FOLLOWING PAID HOLIDAYS: MEMORIAL DAY, NEW
YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY,
DECORATION DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY
FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION
DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED
THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS
AFTER THE HOLIDAY.).................................$ 48.77 31.31
ELECTRICIAN (LINE CONSTRUCTION - LIGHTING AND
TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC
CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND
TRAFFIC MONITORING SYSTEMS, ROAD WEATHER
INFORMATION SYSTEMS): GROUNDMAN (TRUCK DRIVER).
(ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING
PAID HOLIDAYS: MEMORIAL DAY, NEW YEAR'S DAY,
PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT
OF THE UNITED STATES AND ELECTION DAY FOR THE
GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE
WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE
HOLIDAY.)...........................................$ 43.35 30.73
ELECTRICIAN (LINE CONSTRUCTION - LIGHTING AND
TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC
CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND
TRAFFIC MONITORING SYSTEMS, ROAD WEATHER
INFORMATION SYSTEMS): GROUNDMAN TRUCK DRIVER
(TRACTOR TRAILER UNIT). (ADDITIONAL FRINGE
BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS:
MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD
FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION
DAY FOR THE PRESIDENT OF THE UNITED STATES AND
ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE,
PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO
DAYS AFTER THE HOLIDAY.)............................$ 43.35 30.73
ELECTRICIAN (LINE CONSTRUCTION - LIGHTING AND
TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC
CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND
TRAFFIC MONITORING SYSTEMS, ROAD WEATHER
INFORMATION SYSTEMS): LINEMAN AND TECHNICIAN.
(ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING
PAID HOLIDAYS: MEMORIAL DAY, NEW YEAR'S DAY,
PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT
OF THE UNITED STATES AND ELECTION DAY FOR THE
GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE
WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE
HOLIDAY.)...........................................$ 54.19 35.69
ELECTRICIAN (LINE CONSTRUCTION - LIGHTING AND
TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC
CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND
TRAFFIC MONITORING SYSTEMS, ROAD WEATHER
INFORMATION SYSTEMS): MECHANIC. (ADDITIONAL
FRINGE BENEFITS INCLUDE THE FOLLOWING PAID
HOLIDAYS: MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S
DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY,
LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND
ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES
AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK
STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE
OR TWO DAYS AFTER THE HOLIDAY.).....................$ 43.35 30.73
----------------------------------------------------------------
ELEC1249-004 05/05/2025
Rates Fringes
ELECTRICIAN (LINE CONSTRUCTION - OVERHEAD AND
UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND
ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK
INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE,
FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT
BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE
OF GROUND FAULT PROTECTION AND FIBER OPTIC
CAPABILITIES): LINEMAN AND TECHNICIAN. (FOOTNOTE:
ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING
PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY,
MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION
DAY FOR THE PRESIDENT OF THE UNITED STATES AND
ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE,
PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO
DAYS AFTER THE HOLIDAY.)............................$ 61.56 36.21
ELECTRICIAN (LINE CONSTRUCTION - OVERHEAD AND
UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND
ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK
INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE,
FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT
BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE
OF GROUND FAULT PROTECTION AND FIBER OPTIC
CAPABILITIES): FLAGMAN. (FOOTNOTE: ADDITIONAL
FRINGE BENEFITS INCLUDE THE FOLLOWING PAID
HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL
DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY
FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION
DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED
THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS
AFTER THE HOLIDAY.).................................$ 35.34 30.12
ELECTRICIAN (LINE CONSTRUCTION - OVERHEAD AND
UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND
ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK
INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE,
FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT
BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE
OF GROUND FAULT PROTECTION AND FIBER OPTIC
CAPABILITIES): GROUNDMAN DIGGING MACHINE OPERATOR .
(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE
FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT
OF THE UNITED STATES AND ELECTION DAY FOR THE
GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE
WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE
HOLIDAY.)...........................................$ 55.40 31.78
ELECTRICIAN (LINE CONSTRUCTION - OVERHEAD AND
UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND
ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK
INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE,
FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT
BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE
OF GROUND FAULT PROTECTION AND FIBER OPTIC
CAPABILITIES): GROUNDMAN TRUCK DRIVER. (FOOTNOTE:
ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING
PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY,
MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION
DAY FOR THE PRESIDENT OF THE UNITED STATES AND
ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE,
PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO
DAYS AFTER THE HOLIDAY.) ...........................$ 49.25 31.15
ELECTRICIAN (LINE CONSTRUCTION - OVERHEAD AND
UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND
ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK
INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE,
FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT
BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE
OF GROUND FAULT PROTECTION AND FIBER OPTIC
CAPABILITIES): GROUNDMAN TRUCK DRIVER (TRACTOR
TRAILER UNIT). (FOOTNOTE: ADDITIONAL FRINGE
BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW
YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD
FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING
DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE
PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR
THE GOVERNOR OF NEW YORK STATE, PROVIDED THE
EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER
THE HOLIDAY.).......................................$ 49.25 31.15
ELECTRICIAN (LINE CONSTRUCTION - OVERHEAD AND
UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND
ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK
INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE,
FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT
BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE
OF GROUND FAULT PROTECTION AND FIBER OPTIC
CAPABILITIES): MECHANIC. (FOOTNOTE: ADDITIONAL
FRINGE BENEFITS INCLUDE THE FOLLOWING PAID
HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL
DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY
FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION
DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED
THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS
AFTER THE HOLIDAY.).................................$ 49.25 31.15
ELECTRICIAN (LINE CONSTRUCTION - SUBSTATION): CABLE
SPLICER. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS
INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S
DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT
OF THE UNITED STATES AND ELECTION DAY FOR THE
GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE
WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE
HOLIDAY.) ..........................................$ 63.14 33.82
ELECTRICIAN (LINE CONSTRUCTION - SUBSTATION):
FLAGMAN. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS
INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S
DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT
OF THE UNITED STATES AND ELECTION DAY FOR THE
GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE
WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE
HOLIDAY.) ..........................................$ 35.34 30.12
ELECTRICIAN (LINE CONSTRUCTION - SUBSTATION):
GROUND MAN TRUCK DRIVER. (FOOTNOTE: ADDITIONAL
FRINGE BENEFITS INCLUDE THE FOLLOWING PAID
HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL
DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY
FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION
DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED
THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS
AFTER THE HOLIDAY.).................................$ 49.25 31.15
ELECTRICIAN (LINE CONSTRUCTION - SUBSTATION):
GROUNDMAN DIGGING MACHINE OPERATOR. (FOOTNOTE:
ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING
PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY,
MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION
DAY FOR THE PRESIDENT OF THE UNITED STATES AND
ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE,
PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO
DAYS AFTER THE HOLIDAY.)............................$ 55.40 31.78
ELECTRICIAN (LINE CONSTRUCTION - SUBSTATION):
GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT).
(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE
FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT
OF THE UNITED STATES AND ELECTION DAY FOR THE
GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE
WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE
HOLIDAY.) ..........................................$ 49.25 31.15
ELECTRICIAN (LINE CONSTRUCTION - SUBSTATION):
LINEMAN & TECHNICIAN. (FOOTNOTE: ADDITIONAL FRINGE
BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW
YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD
FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING
DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE
PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR
THE GOVERNOR OF NEW YORK STATE, PROVIDED THE
EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER
THE HOLIDAY.) ......................................$ 61.56 36.21
ELECTRICIAN (LINE CONSTRUCTION - SUBSTATION):
MECHANIC. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS
INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S
DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT
OF THE UNITED STATES AND ELECTION DAY FOR THE
GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE
WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE
HOLIDAY.) ..........................................$ 49.25 31.15
ELECTRICIAN (LINE CONSTRUCTION - SWITCHING
STRUCTURES; RAILROAD CATENARY INSTALLATION AND
MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR
GAS FILLED TRANSMISSION CONDUIT AND CABLE
INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC
GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR
THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND
FIBER OPTIC CAPABILITIES), PIPETYPE CABLE
INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND
MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE
INSTALLATION): GROUNDMAN TRUCK DRIVER
(TRACTOR-TRAILER UNIT). (FOOTNOTE: ADDITIONAL
FRINGE BENEFITS INCLUDE THE FOLLOWING PAID
HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL
DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY
FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION
DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED
THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS
AFTER THE HOLIDAY.) ................................$ 49.25 31.15
ELECTRICIAN (LINE CONSTRUCTION - SWITCHING
STRUCTURES; RAILROAD CATENARY INSTALLATION AND
MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR
GAS FILLED TRANSMISSION CONDUIT AND CABLE
INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC
GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR
THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND
FIBER OPTIC CAPABILITIES), PIPETYPE CABLE
INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND
MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE
INSTALLATION): CABLE SPLICER. (FOOTNOTE: ADDITIONAL
FRINGE BENEFITS INCLUDE THE FOLLOWING PAID
HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL
DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY
FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION
DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED
THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS
AFTER THE HOLIDAY.) ...............................$ 64.59 42.92
ELECTRICIAN (LINE CONSTRUCTION - SWITCHING
STRUCTURES; RAILROAD CATENARY INSTALLATION AND
MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR
GAS FILLED TRANSMISSION CONDUIT AND CABLE
INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC
GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR
THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND
FIBER OPTIC CAPABILITIES), PIPETYPE CABLE
INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND
MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE
INSTALLATION): FLAGMAN. (FOOTNOTE: ADDITIONAL
FRINGE BENEFITS INCLUDE THE FOLLOWING PAID
HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL
DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY
FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION
DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED
THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS
AFTER THE HOLIDAY.) ...............................$ 35.34 30.12
ELECTRICIAN (LINE CONSTRUCTION - SWITCHING
STRUCTURES; RAILROAD CATENARY INSTALLATION AND
MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR
GAS FILLED TRANSMISSION CONDUIT AND CABLE
INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC
GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR
THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND
FIBER OPTIC CAPABILITIES), PIPETYPE CABLE
INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND
MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE
INSTALLATION): GROUNDMAN DIGGING MACHINE OPERATOR.
(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE
FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT
OF THE UNITED STATES AND ELECTION DAY FOR THE
GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE
WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE
HOLIDAY.) .........................................$ 55.40 31.78
ELECTRICIAN (LINE CONSTRUCTION - SWITCHING
STRUCTURES; RAILROAD CATENARY INSTALLATION AND
MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR
GAS FILLED TRANSMISSION CONDUIT AND CABLE
INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC
GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR
THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND
FIBER OPTIC CAPABILITIES), PIPETYPE CABLE
INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND
MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE
INSTALLATION): GROUNDMAN TRUCK DRIVER. (FOOTNOTE:
ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING
PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY,
MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION
DAY FOR THE PRESIDENT OF THE UNITED STATES AND
ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE,
PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO
DAYS AFTER THE HOLIDAY.) ..........................$ 49.25 31.15
ELECTRICIAN (LINE CONSTRUCTION - SWITCHING
STRUCTURES; RAILROAD CATENARY INSTALLATION AND
MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR
GAS FILLED TRANSMISSION CONDUIT AND CABLE
INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC
GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR
THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND
FIBER OPTIC CAPABILITIES), PIPETYPE CABLE
INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND
MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE
INSTALLATION): LINEMAN & TECHNICIAN. (FOOTNOTE:
ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING
PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY,
MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION
DAY FOR THE PRESIDENT OF THE UNITED STATES AND
ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE,
PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO
DAYS AFTER THE HOLIDAY.) ..........................$ 61.56 36.21
ELECTRICIAN (LINE CONSTRUCTION - SWITCHING
STRUCTURES; RAILROAD CATENARY INSTALLATION AND
MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR
GAS FILLED TRANSMISSION CONDUIT AND CABLE
INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC
GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR
THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND
FIBER OPTIC CAPABILITIES), PIPETYPE CABLE
INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND
MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE
INSTALLATION): MECHANIC. (FOOTNOTE: ADDITIONAL
FRINGE BENEFITS INCLUDE THE FOLLOWING PAID
HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL
DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY
FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION
DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED
THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS
AFTER THE HOLIDAY.) ................................$ 49.25 31.15
----------------------------------------------------------------
ELEC1249-005 05/05/2025
Rates Fringes
ELECTRICIAN (LIGHTING AND TRAFFIC SIGNAL LINEMAN
INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY
FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING
SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS):
FLAGMAN. (FOOTNOTE: ADDITIONAL FRINGE BENEFITS
INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S
DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S
DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR
THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY
FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED
THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER
THE HOLIDAY) (SULLIVAN COUNTY)......................$ 35.34 30.12
ELECTRICIAN (LIGHTING AND TRAFFIC SIGNAL LINEMAN
INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY
FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING
SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS):
GROUNDMAN (DIGGING MACHINE OPERATOR) (FOOTNOTE:
ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING
PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY,
DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF
THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR
OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE
WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY)
(SULLIVAN COUNTY)...................................$ 55.40 31.78
ELECTRICIAN (LIGHTING AND TRAFFIC SIGNAL LINEMAN
INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY
FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING
SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS):
GROUNDMAN (TRUCK DRIVER) (FOOTNOTE: ADDITIONAL
FRINGE BENEFITS INCLUDE THE FOLLOWING PAID
HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY,
DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF
THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR
OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE
WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY)
(SULLIVAN COUNTY)...................................$ 49.25 31.15
ELECTRICIAN (LIGHTING AND TRAFFIC SIGNAL LINEMAN
INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY
FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING
SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS):
GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT)
(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE
FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY,
DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF
THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR
OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE
WORKS THE DAY BEFORE OR THE DAY AFTER THE HOLIDAY)
(SULLIVAN COUNTY)...................................$ 49.25 31.15
ELECTRICIAN (LIGHTING AND TRAFFIC SIGNAL LINEMAN
INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY
FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING
SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS):
LINEMAN & TECHNICIAN (FOOTNOTE: ADDITIONAL FRINGE
BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS
PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY,
ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES
AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF
NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY
BEFORE OR THE DAY AFTER THE HOLIDAY) (SULLIVAN
COUNTY).............................................$ 61.56 36.21
ELECTRICIAN (LIGHTING AND TRAFFIC SIGNAL LINEMAN
INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY
FOR THE TRAFFIC SIGNAL SYSTEM, TRAFFIC MONITORING
SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS):
MECHANIC (FOOTNOTE: ADDITIONAL FRINGE BENEFITS
INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S
DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S
DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR
THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY
FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED
THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY AFTER
THE HOLIDAY) (SULLIVAN COUNTY)......................$ 49.25 31.15
----------------------------------------------------------------
ELEC1249-008 01/01/2025
Rates Fringes
ELECTRICIAN (LINE CONSTRUCTION - TELEPHONE, CATV
FIBEROPTICS CABLE AND EQUIPMENT): CABLE SPLICER
(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE
FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY,
INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY,
THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS
DAY.)...............................................$ 40.81 6.99
ELECTRICIAN (LINE CONSTRUCTION - TELEPHONE, CATV
FIBEROPTICS CABLE AND EQUIPMENT): GROUNDMAN
(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE
FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY,
INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY,
THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS
DAY.)...............................................$ 20.53 6.39
ELECTRICIAN (LINE CONSTRUCTION - TELEPHONE, CATV
FIBEROPTICS CABLE AND EQUIPMENT): INSTALLER
REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT
OPERATOR (FOOTNOTE: ADDITIONAL FRINGE BENEFITS
INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S
DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY,
INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY,
THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS
DAY.)...............................................$ 38.73 6.93
----------------------------------------------------------------
ELEV0138-001 01/01/2026
Rates Fringes
ELEVATOR MECHANIC (ADDITIONAL FRINGE BENEFITS
INCLUDE THE FOLLOWING: A.VACATION: 6%/UNDER 5 YEARS
BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED.
8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR
ALL HOURS WORKED. AND B. PAID HOLIDAYS: NEW YEAR'S
DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY;
VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER
THANKSGIVING DAY; AND CHRISTMAS DAY.)...............$ 76.12 38.98
----------------------------------------------------------------
ENGI0137-001 03/04/2024
Rates Fringes
POWER EQUIPMENT OPERATOR GROUP 1A (BUILDING
CONSTRUCTION): CARRIER- TRAILER HORSE;
CONCRETE-PORTABLE HOIST; CRANE & HOIST
ENGINEER-STEEL (CONCRETE, MATERIAL, SUPERSTRUCTURE
SUB- STRUCTURE); DERRICK (STONE-STEEL); ELEVATOR &
CAGE; HOIST- SINGLE/DOUBLE OR TRIPLE DRUM;
HOIST-PORTABLE MOBILE UNIT; HOIST ENGINEER-CONCERT
(CRANE-DERRICK-MINE HOIST); HOIST ENGINEER-
MATERIAL; OVERHEAD CRANE; POWER HOUSE PLANT;
TELEPHIES (CABLEWAY); WHIRLY; MAINTENANCE ENGINEER;
LULL HILIFT OR SIMILAR; HYDRAULIC CRANE 25 TON AND
OVER; CHERRY PICKER 25 TONS AND OVER; BACKHOE
OLIVER 88; FORDSON; DYNAHOE; DUAL PURPOSE AND
SIMILAR MACHINES; BARBER GREEN LOADER-EUCLID LOADER
OR SIMILAR TYPE; CONWAY OR SIMILAR MUCKING MACKING
MACHINES; DRAGLINE; GRADALL; SHOVEL; BACKHOE ETC.
(CRAWLER OR TRUCK); FRONT END LOADERS; HYDRAULIC
BOOM; JERSEY SPREADER; LIFT SLAB CONSOLE;
LETOURNEQU OR TOUNAPULL (SCRAPERS OVER 20 YDS
STRUCK); MUCKING MACHINES; PAVEMENT BREAKER (AIR
RAM); PAVER (CONCRETE); ROAD BORING MACHINE; ROAD
MIX MACHINES; ROSS CARRIER AND SIMILAR MACHINES;
POST HOLE DIGGER; SHOVEL (TUNNELS); SIDE BOOM;
SPREADER (ASPHALT); SCOOPMOBILE-TRACTOR-SHOVEL OVER
1 1/2 YDS. TRENCHING MACHINES VERMEER CONCRETE SAW
TRENCHER AND SIMILAR; TRACTOR TYPE DEMOLITION
EQUIPMENT; WINCH TRUCK (A FRAME); HYDRAULIC CRANE
OVER 10 TON UP TO 25 TON); CHERRY PICKER OVER 10
TON UP TO 25 TON) (NOTES: HAZMAT, 20% ABOVE REGULAR
RATE. PUMPING OPERATION PREMIUM, $0.50. CRANE
OPERATORS (100-149 FT), $2.00. CRANE OPERATORS (149
FT+), $3.00. LOADER OPERATORS (OVER 5 CU. YD.),
$0.50. SHOVEL OPERATORS (OVER 4 CU. YD.), $1.00)
(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE
FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, PLUS LINCOLN'S BIRTRHDAY,
WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY,
NOVEMBER ELECTION DAY, VETERAN'S DAY.) (DUTCHESS
COUNTY (POUGHKEEPSIE AND SOUTH THEREOF))............$ 59.04 31.32
POWER EQUIPMENT OPERATOR GROUP 1B (BUILDING
CONSTRUCTION): COMPRESSOR (STEEL ERECTION); PULSE
METER AND PUSH BUTTON BUZZ BOX; ELEVATOR; MECHANIC
(OUTSIDE) ALL TYPES; WELDER; SCRAPERS 20 YDS STRUCK
AND UNDER; MACHINE PULLING SHEEP'S FOOT ROLLER;
VIBRATORY ROLLERS; ROLLER 4 TONS AND OVER. (NOTES:
HAZMAT, 20% ABOVE REGULAR RATE. PUMPING OPERATION
PREMIUM, $0.50. CRANE OPERATORS (100-149 FT),
$2.00. CRANE OPERATORS (149 FT+), $3.00. LOADER
OPERATORS (OVER 5 CU. YD.), $0.50. SHOVEL OPERATORS
(OVER 4 CU. YD.), $1.00) (FOOTNOTE: ADDITIONAL
FRINGE BENEFITS INCLUDE THE FOLLOWING PAID
HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, PLUS LINCOLN'S BIRTRHDAY,
WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY,
NOVEMBER ELECTION DAY, VETERAN'S DAY.) (DUTCHESS
COUNTY (POUGHKEEPSIE AND SOUTH THEREOF))............$ 54.41 31.32
POWER EQUIPMENT OPERATOR GROUP 2A (BUILDING
CONSTRUCTION): COMPACTOR SELF-PROPELLED; GRADER;
BULLDOZE D7 AND SIMILAR TRACTORS WITH A DRAW BAR
HORSEPOWER OF 100 OR OVER; BULLDOZER D6 AND UNDER;
WELDER; SCRAPER 20 YDS STRUCK AND UNDER; MACHINE
PULLING SHEEP'S FOOT ROLLER; VIBRATORY ROLLERS.
(NOTES: HAZMAT, 20% ABOVE REGULAR RATE. PUMPING
OPERATION PREMIUM, $0.50. CRANE OPERATORS (100-149
FT), $2.00. CRANE OPERATORS (149 FT+), $3.00.
LOADER OPERATORS (OVER 5 CU. YD.), $0.50. SHOVEL
OPERATORS (OVER 4 CU. YD.), $1.00) (FOOTNOTE:
ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING
PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, PLUS LINCOLN'S BIRTRHDAY,
WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY,
NOVEMBER ELECTION DAY, VETERAN'S DAY.) (DUTCHESS
COUNTY (POUGHKEEPSIE AND SOUTH THEREOF))............$ 56.97 31.32
POWER EQUIPMENT OPERATOR GROUP 3A (BUILDING
CONSTRUCTION): ASPHALT PLANT; BOILER (HIGH
PRESSURE); CONCRETE MIXING PLANTS; CONCRETE PUMP;
FIREMEN; FORKLIFT; FORKLIFT (ELECTRIC); JOY DRILL
OR SIMILAR TRACTOR DRILLING MACHINE; LOADER - 1 1/2
YARDS AND UNDER; LOCOMOTIVE (ALL SIZES); MIXER
CONCRETE - 21E AND OVER; PORTABLE ASPHALT PLANT;
PORTABLE BATCH PLANT; PORTABLE CRUSHER; QUARRY
MASTER; STONE CRUSHER; WELL DRILLING MACHINE AND
WELL POINT SYSTEM; CHERRY PICKER UNDER 10 TONS;
HYDRAULIC CRANE UNDER 10 TONS; CONCERT BUFFY; ONE
YARD AN UP RIDE ON DUMPER (BENFORD OR SIMILAR).
(NOTES: HAZMAT, 20% ABOVE REGULAR RATE. PUMPING
OPERATION PREMIUM, $0.50. CRANE OPERATORS (100-149
FT), $2.00. CRANE OPERATORS (149 FT+), $3.00.
LOADER OPERATORS (OVER 5 CU. YD.), $0.50. SHOVEL
OPERATORS (OVER 4 CU. YD.), $1.00) (FOOTNOTE:
ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING
PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, PLUS LINCOLN'S BIRTRHDAY,
WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY,
NOVEMBER ELECTION DAY, VETERAN'S DAY.) (DUTCHESS
COUNTY (POUGHKEEPSIE AND SOUTH THEREOF))............$ 54.88 31.32
POWER EQUIPMENT OPERATOR GROUP 3B (BUILDING
CONSTRUCTION): COMPRESSOR OVER 125 CU. FEET;
CONVEYOR BELT MACHINE REGARDLESS OF SIZE; LIGHTING
UNIT (PORTABLE & GENERATOR); WELDING MACHINE (STEEL
ERECTION AND EXCAVATION); AND COMPRESSOR PLANT;
STUD MACHINE; LADDER HOIST. (NOTES: HAZMAT, 20%
ABOVE REGULAR RATE. PUMPING OPERATION PREMIUM,
$0.50. CRANE OPERATORS (100-149 FT), $2.00. CRANE
OPERATORS (149 FT+), $3.00. LOADER OPERATORS (OVER
5 CU. YD.), $0.50. SHOVEL OPERATORS (OVER 4 CU.
YD.), $1.00) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS
INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S
DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S
BIRTRHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY,
COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S
DAY.) (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH
THEREOF))...........................................$ 52.25 31.32
POWER EQUIPMENT OPERATOR GROUP 4A (BUILDING
CONSTRUCTION): AIR TRACTOR DRILL; BATCH PLANT;
BENDING MACHINE; CONCRETE BREAKER; CONCRETE
SPREADER; CURB CUTTER MACHINE; FARM TRACTOR (ALL
TYPES); FINISHING MACHINE-CONCRETE; HEPAVAC CLEAN
AIR MACHINE (ALL SIMILAR TYPES: REMOVAL OF ASBESTOS
ETC.); MATERIAL HOPPER-SAND-STONE-CEMENT;
MIXER-CONCRETE-UNDER 21E; MULCHING GRASS SPREADER;
PUMP-GYPSUM, ETC., PUMP-PLASTER-GROUT
-FIREPROOFING; SHOP MECHANIC (NOT EMPLOYED ON JOB
SITE); ROLLER UNDER 4 TON; SPREADING AND FINE
GRADING MACHINE; STEEL CUTTING MACHINE; SYPHON
PUMP-AIR-STEAM; TAR JOINT MACHINE; TURBO JET BURNER
OR SIMILAR EQUIPMENT; VIBRATOR (1 TO 5); FINE
GRADING MACHINE; ROOF HOIST (TUGGER HOIST);
TELEVISION CAMERAS-WATER- SEWER-GAS-ETC. (NOTES:
HAZMAT, 20% ABOVE REGULAR RATE. PUMPING OPERATION
PREMIUM, $0.50. CRANE OPERATORS (100-149 FT),
$2.00. CRANE OPERATORS (149 FT+), $3.00. LOADER
OPERATORS (OVER 5 CU. YD.), $0.50. SHOVEL OPERATORS
(OVER 4 CU. YD.), $1.00) (FOOTNOTE: ADDITIONAL
FRINGE BENEFITS INCLUDE THE FOLLOWING PAID
HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, PLUS LINCOLN'S BIRTRHDAY,
WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY,
NOVEMBER ELECTION DAY, VETERAN'S DAY.) (DUTCHESS
COUNTY (POUGHKEEPSIE AND SOUTH THEREOF))............$ 54.33 31.32
POWER EQUIPMENT OPERATOR GROUP 4B (BUILDING
CONSTRUCTION): COMPRESSOR TO 125 FEET; DUST; DUST
COLLECTOR; HEATER ALL TYPES; PUMP; PUMP STATION
(WATER AND SEWER); STEAM JENNY; SWEEPER; CHIPPER;
MULCHER. (NOTES: HAZMAT, 20% ABOVE REGULAR RATE.
PUMPING OPERATION PREMIUM, $0.50. CRANE OPERATORS
(100-149 FT), $2.00. CRANE OPERATORS (149 FT+),
$3.00. LOADER OPERATORS (OVER 5 CU. YD.), $0.50.
SHOVEL OPERATORS (OVER 4 CU. YD.), $1.00)
(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE
FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, PLUS LINCOLN'S BIRTRHDAY,
WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY,
NOVEMBER ELECTION DAY, VETERAN'S DAY.) (DUTCHESS
COUNTY (POUGHKEEPSIE AND SOUTH THEREOF))............$ 45.94 31.32
POWER EQUIPMENT OPERATOR GROUP 5 (BUILDING
CONSTRUCTION): MOTORIZED ROLLER (WALK BEHIND)
(NOTES: HAZMAT, 20% ABOVE REGULAR RATE. PUMPING
OPERATION PREMIUM, $0.50. CRANE OPERATORS (100-149
FT), $2.00. CRANE OPERATORS (149 FT+), $3.00.
LOADER OPERATORS (OVER 5 CU. YD.), $0.50. SHOVEL
OPERATORS (OVER 4 CU. YD.), $1.00) (FOOTNOTE:
ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING
PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY, PLUS LINCOLN'S BIRTRHDAY,
WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY,
NOVEMBER ELECTION DAY, VETERAN'S DAY.) (DUTCHESS
COUNTY (POUGHKEEPSIE AND SOUTH THEREOF))............$ 49.53 31.32
POWER EQUIPMENT OPERATOR GROUP 5A (BUILDING
CONSTRUCTION): MASTER MECHANIC (NOTES: HAZMAT, 20%
ABOVE REGULAR RATE. PUMPING OPERATION PREMIUM,
$0.50. CRANE OPERATORS (100-149 FT), $2.00. CRANE
OPERATORS (149 FT+), $3.00. LOADER OPERATORS (OVER
5 CU. YD.), $0.50. SHOVEL OPERATORS (OVER 4 CU.
YD.), $1.00) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS
INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S
DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S
BIRTRHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY,
COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S
DAY.) (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH
THEREOF))...........................................$ 61.95 31.32
POWER EQUIPMENT OPERATOR GROUP 5B (BUILDING
CONSTRUCTION): UTILITY MAN (NOTES: HAZMAT, 20%
ABOVE REGULAR RATE. PUMPING OPERATION PREMIUM,
$0.50. CRANE OPERATORS (100-149 FT), $2.00. CRANE
OPERATORS (149 FT+), $3.00. LOADER OPERATORS (OVER
5 CU. YD.), $0.50. SHOVEL OPERATORS (OVER 4 CU.
YD.), $1.00) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS
INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S
DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S
BIRTRHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY,
COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S
DAY.) (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH
THEREOF))...........................................$ 47.00 31.32
POWER EQUIPMENT OPERATOR GROUP 6 (BUILDING
CONSTRUCTION): WAREHOUSE MAN (NOTES: HAZMAT, 20%
ABOVE REGULAR RATE. PUMPING OPERATION PREMIUM,
$0.50. CRANE OPERATORS (100-149 FT), $2.00. CRANE
OPERATORS (149 FT+), $3.00. LOADER OPERATORS (OVER
5 CU. YD.), $0.50. SHOVEL OPERATORS (OVER 4 CU.
YD.), $1.00) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS
INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S
DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S
BIRTRHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY,
COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S
DAY.) (DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH
THEREOF))...........................................$ 49.26 31.32
----------------------------------------------------------------
ENGI0137-007 03/04/2024
Rates Fringes
POWER EQUIPMENT OPERATOR GROUP 1 (HEAVY & HIGHWAY):
BOOM TRUCK; CHERRY PICKER; CLAMSHELL; CRANE,
(CRAWLER, TRUCK); DRAGLINE; ROUGH TERRAIN CRANE
(NOTES: LOADER OPERATOR (OVER 5 CU YDS), $0.50.
SHOVAL OPERATORS (OVER 4 CU YD), $1.00. HAZMAT
PREMIUM OVER REGULAR RATE, 20%. CRANES: 100 FT-
149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149
FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.)
(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE
FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S
BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE
DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY;
NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND
CHRISTMAS DAY) (POUGHKEEPSIE AND SOUTH THEREOF).....$ 68.63 35.25
POWER EQUIPMENT OPERATOR GROUP 1-A (HEAVY &
HIGHWAY): AUGER; AUTO GRADER; DYNAHOE AND DUAL
PURPOSE AND SIMILAR MACHINES; BOAT CAPTAIN; BORING
MACHINE (ALL TYPES); BULL DOZER-ALL SIZES; CENTRAL
MIX PLANT OPERATOR; CHIPPER-ALL TYPES; CLOSE
CIRCUIT T.V.; COMPACTOR WITH BLADE; CONCRETE
PORTABLE HOIST; C.M.I. OR SIMILAR; CONWAY OR
SIMILAR MUCKING MACHINES; GRADALL, SHOVEL BACKHOE,
ETC. GRADER; DERRICK, (STONE- STEEL; ELEVATOR &
CAGE, MATERIALS OR PASSENGERS; FRONT END LOADERS
OVER 1 1/2 YDS.; HOIST SINGLE, DOUBLE, TRIPLE DRUM,
HOIST PORTABLE MOBILE UNIT; HOIST ENGINEER-CONCRETE
(CRANE-DERRICK-MINE HOIST); HOIST
ENGINEER-MATERIAL, HYDRAULIC BOOM; LETOURNEAU OR
TOURNAPULL (SCRAPERS OVER 20 YDS. STRUCK); LOG
SKIDDER; MOVABLE CONCRETE BARRIER TRANSFER &
TRANSPORT VEHICLE; MUCKING MACHINES; OVERHEAD
CRANE; PAVER (CONCCRETE); PULSEMETER; PUSH BUTTON
(BUZZ BOX) ELEVATOR; ROAD MIX MACHINES; ROBOT
HAMMER (BROCK OR SIMILAR), ROSS CARRIER AND SIMILAR
MACHINES; SHOVELS (TUNNELS); SIDE BOOM; SLIP FORM
MACHINE; SPREADER (ASPHALT);
SCOOPMOBILE-TRACTOR-SHOVEL OVER 1 1/2 YARDS;
TRENCHING MACHINES; TELEPHIES- VERMEER CONCRETE SAW
TRENCHER AND/OR SIMILAR; TRACTOR-TYPE DEMOLITION
EQUIPMENT, WHIRLY (NOTES: LOADER OPERATOR (OVER 5
CU YDS), $0.50. SHOVAL OPERATORS (OVER 4 CU YD),
$1.00. HAZMAT PREMIUM OVER REGULAR RATE, 20%.
CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN
GROUP 1 RATE. 149 FT AND OVER RECEIVE $3.00 MORE
THAN GROUP 1 RATE.) (FOOTNOTE: ADDITIONAL FRINGE
BENEFITS INLCLUDE THE FOLLOWING PAID HOLIDAYS: NEW
YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY;
MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS
DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY;
THANKSGIVING DAY; AND CHRISTMAS DAY) (POUGHKEEPSIE
AND SOUTH THEREOF)..................................$ 60.42 35.25
POWER EQUIPMENT OPERATOR GROUP 1-B (HEAVY &
HIGHWAY): ROAD PAVER, ASPHALT (NOTES: LOADER
OPERATOR (OVER 5 CU YDS), $0.50. SHOVAL OPERATORS
(OVER 4 CU YD), $1.00. HAZMAT PREMIUM OVER
REGULAR RATE, 20%. CRANES: 100 FT- 149 FT:
RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 FT AND
OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.)
(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE
FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S
BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE
DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY;
NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND
CHRISTMAS DAY) (POUGHKEEPSIE AND SOUTH THEREOF).....$ 63.70 35.25
POWER EQUIPMENT OPERATOR GROUP 2-A (HEAVY &
HIGHWAY): BALLAST REGULATORS; COMPACTOR
SELF-PROPELLED; COW TRACKS; FUSION MACHINE; RAIL
ANCHOR MACHINES; ROLLER 4 TON AND OVER; SCRAPERS -
20 YARDS STRUCK; SWITCH TAMPERS; VIBRATORY ROLLER,
ETC. (NOTES: LOADER OPERATOR (OVER 5 CU YDS),
$0.50. SHOVAL OPERATORS (OVER 4 CU YD), $1.00.
HAZMAT PREMIUM OVER REGULAR RATE, 20%. CRANES:
100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1
RATE. 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP
1 RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS
INLCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S
DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY;
INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS
DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND
CHRISTMAS DAY) (POUGHKEEPSIE AND SOUTH THEREOF).....$ 57.84 35.25
POWER EQUIPMENT OPERATOR GROUP 2-B (HEAVY &
HIGHWAY): MECHANIC (OUTSIDE) ALL TYPES (NOTES:
LOADER OPERATOR (OVER 5 CU YDS), $0.50. SHOVAL
OPERATORS (OVER 4 CU YD), $1.00. HAZMAT PREMIUM
OVER REGULAR RATE, 20%. CRANES: 100 FT- 149 FT:
RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 FT AND
OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.)
(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE
FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S
BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE
DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY;
NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND
CHRISTMAS DAY) (POUGHKEEPSIE AND SOUTH THEREOF).....$ 59.67 35.25
POWER EQUIPMENT OPERATOR GROUP 3 (HEAVY & HIGHWAY):
A: AIR TRACTOR DRILL; ASPHALT PLANT; BATCH PLANT;
BOILER (HIGH PRESSURE; CONCRETE BREAKER; CONCRETE
PUMP CONCRETE SPREADER; CURB CUTTER MACHINE; FARM
TRACTOR (ALL TYPES); FINISHING MACHINE (CONCRETE);
FINE GRADING MACHINE; FIREMAN; FORKLIFT; FORKLIFT
(ELECTRIC); JOY DRILL OR SIMILAR TRACTOR DRILLING
MACHINE; LOADER - 1 1/2 YARDS AND UNDER; LOCOMOTIVE
(ALL SIZES), MAINTENANCE ENGINEER; MACHINE PULLING
SHEEPS FOOT ROLLER; MATERIAL HOPPER; MIXER CONCRETE
- 21-E AND OVER; MULCHING GRASS SPREADER; PORTABLE
ASPHALT PLANT, PORTABLE BATCH PLANT, PORTABLE
CRUSHER; POWERHOUSE PLANT; QUARRY MASTER; ROLLER
UNDER 4 TON; SPREADING AND FINE GRADING MACHINE;
STEEL CUTTING MACHINE; STONE CRUSHER; SWEEPER;
TURBOJET BURNER OR SIMILAR; WELL DRILLING MACHINE ;
WINCH TRUCK ""A"" FRAME. JOHN HENRY DRILL OR SIMILAR.
(NOTES: LOADER OPERATOR (OVER 5 CU YDS), $0.50.
SHOVAL OPERATORS (OVER 4 CU YD), $1.00. HAZMAT
PREMIUM OVER REGULAR RATE, 20%. CRANES: 100 FT-
149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149
FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.)
(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE
FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S
BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE
DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY;
NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND
CHRISTMAS DAY) (POUGHKEEPSIE AND SOUTH THEREOF).....$ 56.81 35.25
POWER EQUIPMENT OPERATOR GROUP 4-A (HEAVY &
HIGHWAY): SERVICE MEN (FUEL OR GREASE TRUCK).
(NOTES: LOADER OPERATOR (OVER 5 CU YDS), $0.50.
SHOVAL OPERATORS (OVER 4 CU YD), $1.00. HAZMAT
PREMIUM OVER REGULAR RATE, 20%. CRANES: 100 FT-
149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149
FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.)
(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE
FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S
BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE
DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY;
NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND
CHRISTMAS DAY) (POUGHKEEPSIE AND SOUTH THEREOF).....$ 51.57 35.25
POWER EQUIPMENT OPERATOR GROUP 4-B (HEAVY &
HIGHWAY): OILER; COMPRESSOR - COMPRESSOR PLANT;
PAINT COMPRESSOR-STEEL ERECTION; CONVEYOR BELT
MACHINE; LIGHTING UNIT (PORTABLE & GENERATOR);
OILER; PUMPS - PUMP STATION-WATER-SEWER- GYPSUM-
PLASTER, ETC.; ROLLER-MOTORIZED (WALK-BEHIND);
WELDING MACHINE (STEEL ERECTION EXCAVATION); WELL
POINT SYSTEM; BENDING MACHINE; DUST COLLECTOR;
MIXER - CONCRETE UNDER 21-E; HEATER ALL TYPES;
STEAM JENNY; SYPHON PUMP-AIR-STEAM; TAR JOINT
MACHINE; VIBRATOR (1 TO 5); COMPRESSOR TRUCK
MOUNTED (2-6) (NOTES: LOADER OPERATOR (OVER 5 CU
YDS), $0.50. SHOVAL OPERATORS (OVER 4 CU YD),
$1.00. HAZMAT PREMIUM OVER REGULAR RATE, 20%.
CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN
GROUP 1 RATE. 149 FT AND OVER RECEIVE $3.00 MORE
THAN GROUP 1 RATE.) (FOOTNOTE: ADDITIONAL FRINGE
BENEFITS INLCLUDE THE FOLLOWING PAID HOLIDAYS: NEW
YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY;
MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS
DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY;
THANKSGIVING DAY; AND CHRISTMAS DAY) (POUGHKEEPSIE
AND SOUTH THEREOF)..................................$ 44.19 35.25
POWER EQUIPMENT OPERATOR GROUP 5 (HEAVY &
HIGHWAY):OILER (NOTES: LOADER OPERATOR (OVER 5 CU
YDS), $0.50. SHOVAL OPERATORS (OVER 4 CU YD),
$1.00. HAZMAT PREMIUM OVER REGULAR RATE, 20%.
CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN
GROUP 1 RATE. 149 FT AND OVER RECEIVE $3.00 MORE
THAN GROUP 1 RATE.) (FOOTNOTE: ADDITIONAL FRINGE
BENEFITS INLCLUDE THE FOLLOWING PAID HOLIDAYS: NEW
YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY;
MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS
DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY;
THANKSGIVING DAY; AND CHRISTMAS DAY) (POUGHKEEPSIE
AND SOUTH THEREOF)..................................$ 64.02 35.25
POWER EQUIPMENT OPERATOR GROUP 5-A-1 (HEAVY &
HIGHWAY): MASTER MECHANIC (NOTES: LOADER OPERATOR
(OVER 5 CU YDS), $0.50. SHOVAL OPERATORS (OVER 4
CU YD), $1.00. HAZMAT PREMIUM OVER REGULAR RATE,
20%. CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE
THAN GROUP 1 RATE. 149 FT AND OVER RECEIVE $3.00
MORE THAN GROUP 1 RATE.) (FOOTNOTE: ADDITIONAL
FRINGE BENEFITS INLCLUDE THE FOLLOWING PAID
HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD
FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY;
VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY;
THANKSGIVING DAY; AND CHRISTMAS DAY) (POUGHKEEPSIE
AND SOUTH THEREOF)..................................$ 64.02 35.25
POWER EQUIPMENT OPERATOR GROUP 5-A-2 (HEAVY &
HIGHWAY): ENGINEER - ALL TOWER CRANES, ALL CLIMBING
CRANES AND ALL CRANES OF 100 TON CAPACITY OR
GREATER (3900 MANITOWAC OR SIMILAR) IRRESPECTIVE OF
MANUFACTURER AND REGARDLESS OF HOW THE SAME IS
RIGGED (EXCEPT FOR PILE RIGS). (NOTES: LOADER
OPERATOR (OVER 5 CU YDS), $0.50. SHOVAL OPERATORS
(OVER 4 CU YD), $1.00. HAZMAT PREMIUM OVER
REGULAR RATE, 20%. CRANES: 100 FT- 149 FT:
RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 FT AND
OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.)
(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE
FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S
BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE
DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY;
NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND
CHRISTMAS DAY) (POUGHKEEPSIE AND SOUTH THEREOF).....$ 77.82 35.25
POWER EQUIPMENT OPERATOR GROUP 5-A-3 (HEAVY &
HIGHWAY): ENGINEER-- PILE DRIVER (NOTES: LOADER
OPERATOR (OVER 5 CU YDS), $0.50. SHOVAL OPERATORS
(OVER 4 CU YD), $1.00. HAZMAT PREMIUM OVER
REGULAR RATE, 20%. CRANES: 100 FT- 149 FT:
RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149 FT AND
OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.)
(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE
FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S
BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE
DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY;
NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND
CHRISTMAS DAY) (POUGHKEEPSIE AND SOUTH THEREOF).....$ 75.13 35.25
POWER EQUIPMENT OPERATOR GROUP 5-A-4 (HEAVY &
HIGHWAY): HOIST ENGINEER- STEEL -SUB STRUCTURE
(NOTES: LOADER OPERATOR (OVER 5 CU YDS), $0.50.
SHOVAL OPERATORS (OVER 4 CU YD), $1.00. HAZMAT
PREMIUM OVER REGULAR RATE, 20%. CRANES: 100 FT-
149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE. 149
FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE.)
(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INLCLUDE THE
FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S
BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE
DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY;
NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND
CHRISTMAS DAY) (POUGHKEEPSIE AND SOUTH THEREOF).....$ 70.41 35.25
POWER EQUIPMENT OPERATOR GROUP 5-A-5 (HEAVY &
HIGHWAY): JERSEY-SPREADER, PAVEMENT BREAKER (AIR
RAM); POST HOLE DIGGER (NOTES: LOADER OPERATOR
(OVER 5 CU YDS), $0.50. SHOVAL OPERATORS (OVER 4
CU YD), $1.00. HAZMAT PREMIUM OVER REGULAR RATE,
20%. CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE
THAN GROUP 1 RATE. 149 FT AND OVER RECEIVE $3.00
MORE THAN GROUP 1 RATE.) (FOOTNOTE: ADDITIONAL
FRINGE BENEFITS INLCLUDE THE FOLLOWING PAID
HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD
FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY;
VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY;
THANKSGIVING DAY; AND CHRISTMAS DAY) (POUGHKEEPSIE
AND SOUTH THEREOF)..................................$ 59.19 35.25
----------------------------------------------------------------
ENGI0158-006 07/01/2025
Rates Fringes
POWER EQUIPMENT OPERATORS GROUP A (BUILDING
CONSTRUCTION): SHOVEL, ALL EXCAVATOR (EXCEPT
TRACTOR MOUNTED RUBBER TIRED JOHN DEERE 510 OR
SMALLER), GRADALLS, POWER ROAD GRADER, ALL CMI
EQUIPMENT, FRONT-END RUBBER TIRE LOADER,
TRACTOR-MOUNTED DRILL (QUARRY MASTER), MUCKING
MACHINE, CONCRETE CENTRAL MIX PLANT, CONCRETE PUMP,
BELCRETE SYSTEM, AUTOMATED ASPHALT CONCRETE PLANT
AND TRACTOR ROAD PAVER, BOOM TRUCK (5 TONS AND
UNDER). (NOTE: HAZARDOUS WORK - ANYTIME OPERATING
ENGINEERS ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50
PER HOUR OVER REGULAR RATE.) (FOOTNOTE: ADDITIONAL
FRINGE BENEFITS INCLUDE THE FOLLOWING PAID
HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY) (NORTHERN PART OF DUTCHESS (TO THE
NORTHEN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE) .$ 54.93 33.20
POWER EQUIPMENT OPERATORS GROUP A(1) (BUILDLING
CONSTRUCTION): CRANE, HYDRAULIC CRANES, TOWER
CRANE, LOCOMOTIVE CRANE, PILEDRIVER, CABLEWAY,
DERRICKS, WHIRLIES, DRAGLINE, BOOM TRUCK (OVER 5
TONS) (GROUP A(1) CRANE PREMIUMS: OVER 150', ADD
$1.00. OVER 200', ADD $2.00.) (NOTE: HAZARDOUS
WORK - ANYTIME OPERATING ENGINEERS ARE INVOLVED
WITH LEVEL C OR ABOVE, $2.50 PER HOUR OVER REGULAR
RATE.) (FOOTNOTE: ADDITIONAL FRINGE BENEFITS
INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S
DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY) (NORTHERN PART OF
DUTCHESS (TO THE NORTHEN BOUNDARY LINE OF THE CITY
OF POUGHKEEPSIE) ...................................$ 55.42 33.20
POWER EQUIPMENT OPERATORS GROUP B (BUILDING
CONSTRUCTION) BACKHOE, (TRACTOR MOUNTED RUBBER
TIRED EQUIVALENT TO JOHN DEERE 510 OR LESS),
BULLDOZER, PUSHCAT, TRACTOR, TRAXCAVATOR, SCRAPER,
LETOURNEAU GRADER, FORM FINE GRADER, ROAD ROLLER,
BLACKTOP ROLLER, BLACKTOP SPREADER, POWER BROOMS,
SWEEPERS, TRENCHING MACHINE, BARBER GREEN LOADER,
SIDE BOOMS, HYDROHAMMER, CONCRETE SPREADER,
CONCRETE FINISHING MACHINE, ONE DRUM HOIST, POWER
HOSTING (SINGLE DRUM), HOIST - TWO DRUM OR MORE,
THREE DRUM ENGINE, POWER HOISTING (TWO DRUM AND
OVER), TWO DRUM AND SWINGING ENGINE, THREE DRUM
SWINGING ENGINE, HOD HOIST, A-L FRAME WINCHES, CORD
AND WELL DRILLERS (ONE DRUM), POST HOLE DIGGER,
MODEL CHB VIBRO-TAMP OR SIMILAR MACHINE, BATCH BIN
AND PLANT OPERATOR, DINKEY LOCOMOTIVE, SKID STEER
LOADER, TRACK EXCAVATOR 5/8 CU. YD. OR SMALLER.
(NOTE: HAZARDOUS WORK - ANYTIME OPERATING ENGINEERS
ARE INVOLVED WITH LEVEL C OR ABOVE, $2.50 PER HOUR
OVER REGULAR RATE.) (FOOTNOTE: ADDITIONAL FRINGE
BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY, CHRISTMAS DAY) (NORTHERN
PART OF DUTCHESS (TO THE NORTHEN BOUNDARY LINE OF
THE CITY OF POUGHKEEPSIE) ..........................$ 53.91 33.20
POWER EQUIPMENT OPERATORS GROUP C (BUILDLING
CONSTRUCTION): FORK LIFT, HIGH LIFT, LULL, OILER,
FIREMAN AND HEAVY- DUTY GREASER, BOILERS, AND STEAM
GENERATORS, PUMP, VIBRATOR, MOTOR MIXER, AIR
COMPRESSOR, DUST COLLECTOR, WELDING MACHINE, WELL
POINT, MECHANICAL HEATER, GENERATORS, TEMPORARY
LIGHT PLANTS, CONCRETE PUMPS, ELECTRIC SUBMERSIBLE
PUMP 4"" AND OVER, MURPHY TYPE DIESEL GENERATOR,
CONVEYOR, ELEVATORS, CONCRETE MIXER AND BELCRETE
POWER PACK (BELCRETE SYSTEM), SEEDING, AND MULCHING
MACHINES, PUMPS. (NOTE: HAZARDOUS WORK - ANYTIME
OPERATING ENGINEERS ARE INVOLVED WITH LEVEL C OR
ABOVE, $2.50 PER HOUR OVER REGULAR RATE.)
(FOOTNOTE: ADDITIONAL FRINGE BENEFITS INCLUDE THE
FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL
DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
CHRISTMAS DAY) (NORTHERN PART OF DUTCHESS (TO THE
NORTHEN BOUNDARY LINE OF THE CITY OF POUGHKEEPSIE) .$ 51.01 33.20
------------------------------Source: the U.S. Department of Labor's register of wage determinations, read every week. Federal Bid Alerts is independent; check the wage determination in your solicitation before you bid.