Home / Prevailing wage rates / New York / NY20260025

Putnam County, New York Davis-Bacon Wage Rates: Building, Heavy and Highway

Updated

Federal prevailing wage rates (Davis-Bacon) for building, heavy and highway construction in Putnam County, New York: 34 classifications, base rates from $3.00 to $75.46 an hour plus fringe benefits. General decision NY20260025, modification 2, published May 18, 2026.

TypeDavis-Bacon (construction)
NumberNY20260025
Modification2
PublishedMay 18, 2026
StateNew York
AreaNew York Counties of Putnam
Construction typeBuilding, Heavy and Highway
Get new federal construction bids in New York by email
Only new notices that match, once a day. Federal bids in New York that match your words.

Wage rates and fringe benefits (34)

ClassificationBase rateFringeTotalNew York median
Pointer, Cleaner and Caulker$41.96$33.38$75.34
Marble Mason$63.92$40.20$104.12
Terrazzo Worker/Setter$64.62$37.63$102.25
Terrazzo Finisher$49.59$34.25$83.84
Tile Finisher$49.59$34.25$83.84
Marble Finisher$49.99$37.54$87.53
Bricklayer (Marble Polishers)$52.32$36.25$88.57$41.79 (+$10.53)
Tile Layer$64.40$37.13$101.53
Carpenters: (Heavy & Highway)$50.12$31.73$81.85$40.33 (+$9.79)
Carpenters (Building)$50.12$31.73$81.85$40.33 (+$9.79)
Millwright$60.83$58.03$118.86$39.88 (+$20.95)
Dock Builder & Piledrivermen$60.59$55.84$116.43
Diver Tender$55.00$55.84$110.84
Diver$75.46$55.84$131.30
Carpenter (Soft Floor Layers)$44.69$38.17$82.86$40.33 (+$4.36)
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Substation: )$49.25$31.15$80.40$49.25
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & TECHNICIAN (Substation: )$61.56$36.21$97.77$61.56
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation: )$49.25$31.15$80.40$49.25
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING MACHINE OPERATOR (Substation: )$55.40$31.78$87.18$55.40
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Substation: )$35.34$30.12$65.46$35.34
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER (Substation: )$63.14$33.82$96.96$63.14
Crane Operators (149 Ft +)$3.00see text$3.00
Crane Operators (149 Ft +)$3.00see text$3.00
Crane Operators (149 Ft +)$3.00see text$3.00
Crane Operators (149 Ft +)$3.00see text$3.00
Crane Operators (149 Ft +)$3.00see text$3.00
Laborer (Building)$44.05$32.40$76.45
Painter (Spray, Scaffold, Sandblasting)$47.75$44.11$91.86$44.75 (+$3.00)
Painter (Painters, Paperhanger, Drywall Finishers & Lead Abatement Worker)$44.75$44.11$88.86$44.75
Painter (Glaziers)$49.20$57.20$106.40$44.75 (+$4.45)
Plumber and Steamfitter (Zone 1)$65.07$45.35$110.42$42.68 (+$22.39)
Roofer$50.25$32.62$82.87$34.10 (+$16.15)
Sprinkler Fitter$57.20$32.66$89.86$47.85 (+$9.35)
Sheet Metal Worker$55.29$47.43$102.72$41.25 (+$14.04)

The median is the middle rate for the same work across New York's building, heavy and highway wage determinations in force today, shown when at least three have it.

How to use these rates

On a federal or federally funded construction contract over $2,000, every laborer and mechanic on site must be paid at least the base rate for the work they do, plus the fringe benefit amount, either as benefits or in cash. The wage determination that applies is the one included in the solicitation, at the modification in force when bids open; a later modification only counts if it is published early enough before bid opening. Classifications missing here are added through a conformance request. The full text below has the footnotes, the paid holidays and any rate notes.

Other Davis-Bacon building, heavy and highway wage determinations in New York

All New York prevailing wage rates · Open federal bids in New York

Full text of NY20260025

Show the official text (83,707 characters)
General Decision Number: NY20260025 05/18/2026


State: New York


Construction Types: Building, Heavy and Highway


Counties: New York Counties of 
Putnam




Building Construction Projects

Heavy Construction Projects

Highway Construction Projects


Modification Number     Publication Date
          1                01/30/2026
          2                05/18/2026


 ASBE0091-001 06/02/2025
                                                     Rates                  Fringes
INSULATOR/ASBESTOS WORKER (INCLUDES APPLICATION OF 
ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, 
COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL 
SYSTEMS)............................................$ 46.62                  49.30
HAZARDOUS MATERIAL HANDLER (DUTIES LIMITED TO 
PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPING, 
VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION 
MATERIALS WHETHER THEY CONTAIN ASBESTOS OR NOT FROM 
MECHANICAL SYSTEMS).................................$ 46.62                  49.30
----------------------------------------------------------------

 BOIL0005-001 01/01/2025
                                                     Rates                  Fringes
BOILERMAKER  FOOTNOTE:  A. PAID HOLIDAYS:  NEW 
YEAR'S DAY, THANKSGIVING DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY AND GOOD FRIDAY, FRIDAY 
AFTER THANKSGIVING, CHRISTMAS EVE DAY AND NEW 
YEAR'S EVE..........................................$ 68.88                  49.83
----------------------------------------------------------------

 BRNY0001-003 06/01/2018
                                                     Rates                  Fringes
POINTER, CLEANER AND CAULKER........................$ 41.96                  33.38
----------------------------------------------------------------

 BRNY0004-001 07/01/2024
                                                     Rates                  Fringes
MARBLE MASON........................................$ 63.92                  40.20
----------------------------------------------------------------

 BRNY0005-004 06/01/2023
                                                     Rates                  Fringes
BRICKLAYER, CEMENT MASON, PLASTERER & STONEMASON: 
BRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE 
MASONS (BUILDING CONSTRUCTION)......................$ 46.39                  37.45
----------------------------------------------------------------

 BRNY0007-001 12/02/2024
                                                     Rates                  Fringes
TERRAZZO WORKER/SETTER..............................$ 64.62                  37.63
TERRAZZO FINISHER...................................$ 49.59                  34.25
----------------------------------------------------------------

 BRNY0007-002 12/02/2024
                                                     Rates                  Fringes
TILE FINISHER.......................................$ 49.59                  34.25
----------------------------------------------------------------

 BRNY0020-001 07/01/2024
                                                     Rates                  Fringes
MARBLE FINISHER.....................................$ 49.99                  37.54
----------------------------------------------------------------

 BRNY0024-001 06/03/2024
                                                     Rates                  Fringes
BRICKLAYER (MARBLE POLISHERS).......................$ 52.32                  36.25
----------------------------------------------------------------

 BRNY0052-001 06/03/2024
                                                     Rates                  Fringes
TILE LAYER..........................................$ 64.40                  37.13
----------------------------------------------------------------

 CARP0279-002 07/01/2025
                                                     Rates                  Fringes
CARPENTERS: (HEAVY & HIGHWAY).......................$ 50.12                  31.73
CARPENTERS (BUILDING)...............................$ 50.12                  31.73
----------------------------------------------------------------

 CARP0740-001 07/01/2025
                                                     Rates                  Fringes
MILLWRIGHT..........................................$ 60.83                  58.03
----------------------------------------------------------------

 CARP1556-006 07/01/2024
                                                     Rates                  Fringes
DOCK BUILDER & PILEDRIVERMEN........................$ 60.59                  55.84
----------------------------------------------------------------

 CARP1556-007 07/01/2024
                                                     Rates                  Fringes
DIVER TENDER........................................$ 55.00                  55.84
DIVER...............................................$ 75.46                  55.84
----------------------------------------------------------------

 CARP2287-002 07/01/2025
                                                     Rates                  Fringes
CARPENTER (SOFT FLOOR LAYERS).......................$ 44.69                  38.17
----------------------------------------------------------------

 ELEC0363-003 04/01/2025
                                                     Rates                  Fringes
ELECTRICIAN (PUTNAM COUNTY)    FOOTNOTE:   A. PAID 
HOLIDAYS:  NEW YEAR'S DAY, PRESIDENT'S DAY, 
MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, 
PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, 
THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS 
DAY.................................................$ 51.50                  42.22
----------------------------------------------------------------

 ELEC1249-002 05/05/2025
                                                     Rates                  Fringes
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND 
TRAFFIC MONITORING SYSTEMS, ROAD WEATHER 
INFORMATION SYSTEMS: MECHANIC.   PAID HOLIDAYS:  A. 
MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD 
FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION 
DAY FOR THE PRESIDENT OF THE UNITED STATES AND 
ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, 
PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO 
DAYS AFTER THE HOLIDAY..............................$ 43.35                  30.73
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND 
TRAFFIC MONITORING SYSTEMS, ROAD WEATHER 
INFORMATION SYSTEMS: LINEMAN AND TECHNICIAN.   PAID 
HOLIDAYS:  A. MEMORIAL DAY, NEW YEAR'S DAY, 
PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT 
OF THE UNITED STATES AND ELECTION DAY FOR THE 
GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE 
WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE 
HOLIDAY.............................................$ 54.19                  35.69
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND 
TRAFFIC MONITORING SYSTEMS, ROAD WEATHER 
INFORMATION SYSTEMS: GROUNDMAN TRUCK DRIVER 
(TRACTOR TRAILER UNIT).   PAID HOLIDAYS:  A. 
MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD 
FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION 
DAY FOR THE PRESIDENT OF THE UNITED STATES AND 
ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, 
PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO 
DAYS AFTER THE HOLIDAY..............................$ 43.35                  30.73
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND 
TRAFFIC MONITORING SYSTEMS, ROAD WEATHER 
INFORMATION SYSTEMS: GROUNDMAN (TRUCK DRIVER). PAID 
HOLIDAYS:  A. MEMORIAL DAY, NEW YEAR'S DAY, 
PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT 
OF THE UNITED STATES AND ELECTION DAY FOR THE 
GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE 
WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE 
HOLIDAY.............................................$ 43.35                  30.73
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND 
TRAFFIC MONITORING SYSTEMS, ROAD WEATHER 
INFORMATION SYSTEMS: GROUNDMAN (DIGGING MACHINE 
OPERATOR).   PAID HOLIDAYS:  A. MEMORIAL DAY, NEW 
YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, 
DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, 
THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY 
FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION 
DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED 
THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS 
AFTER THE HOLIDAY...................................$ 48.77                  31.31
ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC 
SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE 
NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND 
TRAFFIC MONITORING SYSTEMS, ROAD WEATHER 
INFORMATION SYSTEMS: FLAGMAN.   PAID HOLIDAYS:  A. 
MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD 
FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION 
DAY FOR THE PRESIDENT OF THE UNITED STATES AND 
ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, 
PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO 
DAYS AFTER THE HOLIDAY..............................$ 32.51                  29.93
----------------------------------------------------------------

 ELEC1249-004 05/05/2025
                                                     Rates                  Fringes
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Switching 
structures; railroad catenary installation and 
maintenance, third rail type underground fluid or 
gas filled transmission conduit and cable 
installations (including any and all fiber optic 
ground product by any other name manufactured for 
the dual purpose of ground fault protection and 
fiber optic capabilities), pipetype cable 
installation and maintenance jobs or projects, and 
maintenance bonding of rails; Pipetype cable 
installation).......................................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC 
(Substation:).......................................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: MECHANIC (Overhead 
and underground distribution and maintenance work 
and all overhead and underground transmission line 
work including any and all fiber optic ground wire, 
fiber optic shield wire or any other like product 
by any other name manufactured for the dual purpose 
of ground fault protection and fiber optic 
capabilities :).....................................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & 
TECHNICIAN (Switching structures; railroad catenary 
installation and maintenance, third rail type 
underground fluid or gas filled transmission 
conduit and cable installations (including any and 
all fiber optic ground product by any other name 
manufactured for the dual purpose of ground fault 
protection and fiber optic capabilities), pipetype 
cable installation and maintenance jobs or 
projects, and maintenance bonding of rails; 
Pipetype cable ins..................................$ 61.56                  36.21
ELECTRICIAN, LINE CONSTRUCTION: LINEMAN & 
TECHNICIAN (Substation:)............................$ 61.56                  36.21
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK 
DRIVER (TRACTOR TRAILER UNIT) (Substation:).........$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK 
DRIVER (TRACTOR TRAILER UNIT) (Overhead and 
underground distribution and maintenance work and 
all overhead and underground transmission line work 
including any and all fiber optic ground wire, 
fiber optic shield wire or any other like product 
by any other name manufactured for the dual purpose 
of ground fault protection and fiber optic 
capabilities :).....................................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK 
DRIVER (Switching structures; railroad catenary 
installation and maintenance, third rail type 
underground fluid or gas filled transmission 
conduit and cable installations (including any and 
all fiber optic ground product by any other name 
manufactured for the dual purpose of ground fault 
protection and fiber optic capabilities), pipetype 
cable installation and maintenance jobs or 
projects, and maintenance bonding of rails; 
Pipetype cable installat............................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN TRUCK 
DRIVER (Overhead and underground distribution and 
maintenance work and all overhead and underground 
transmission line work including any and all fiber 
optic ground wire, fiber optic shield wire or any 
other like product by any other name manufactured 
for the dual purpose of ground fault protection and 
fiber optic capabilities :).........................$ 49.25                  31.15
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING 
MACHINE OPERATOR (Switching structures; railroad 
catenary installation and maintenance, third rail 
type underground fluid or gas filled transmission 
conduit and cable installations (including any and 
all fiber optic ground product by any other name 
manufactured for the dual purpose of ground fault 
protection and fiber optic capabilities), pipetype 
cable installation and maintenance jobs or 
projects, and maintenance bonding of rails; 
Pipetype cab........................................$ 55.40                  31.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING 
MACHINE OPERATOR (Substation:)......................$ 55.40                  31.78
ELECTRICIAN, LINE CONSTRUCTION: GROUNDMAN DIGGING 
MACHINE OPERATOR (Overhead and underground 
distribution and maintenance work and all overhead 
and underground transmission line work including 
any and all fiber optic ground wire, fiber optic 
shield wire or any other like product by any other 
name manufactured for the dual purpose of ground 
fault protection and fiber optic capabilities :)....$ 55.40                  31.78
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Switching 
structures; railroad catenary installation and 
maintenance, third rail type underground fluid or 
gas filled transmission conduit and cable 
installations (including any and all fiber optic 
ground product by any other name manufactured for 
the dual purpose of ground fault protection and 
fiber optic capabilities), pipetype cable 
installation and maintenance jobs or projects, and 
maintenance bonding of rails; Pipetype cable 
installation).......................................$ 35.34                  30.12
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN 
(Substation:).......................................$ 35.34                  30.12
ELECTRICIAN, LINE CONSTRUCTION: FLAGMAN (Overhead 
and underground distribution and maintenance work 
and all overhead and underground transmission line 
work including any and all fiber optic ground wire, 
fiber optic shield wire or any other like product 
by any other name manufactured for the dual purpose 
of ground fault protection and fiber optic 
capabilities :).....................................$ 35.34                  30.12
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER 
(Switching structures; railroad catenary 
installation and maintenance, third rail type 
underground fluid or gas filled transmission 
conduit and cable installations (including any and 
all fiber optic ground product by any other name 
manufactured for the dual purpose of ground fault 
protection and fiber optic capabilities), pipetype 
cable installation and maintenance jobs or 
projects, and maintenance bonding of rails; 
Pipetype cable installation)........................$ 64.59                  42.92
ELECTRICIAN, LINE CONSTRUCTION: CABLE SPLICER 
(Substation:).......................................$ 63.14                  33.82
ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; 
RAILROAD CATENARY INSTALLATION AND MAINTENANCE, 
THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED 
TRANSMISSION CONDUIT AND CABLE INSTALLATIONS 
(INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT 
BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE 
OF GROUND FAULT PROTECTION AND FIBER OPTIC 
CAPABILITIES), PIPETYPE CABLE INSTALLATION AND 
MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE 
BONDING OF RAILS; PIPETYPE CABLE INSTALLATION 
GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT)  
FOOTNOTE:    A. PAID HOLIDAYS: NEW YEAR'S DAY, 
PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, 
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, 
CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT 
OF THE UNITED STATES AND ELECTION DAY FOR THE 
GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE 
WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE 
HOLIDAY.............................................$ 49.25                  31.15
ELECTRICIAN LINE CONSTRUCTION SUBSTATION: GROUND 
MAN TRUCK DRIVER  FOOTNOTE:    A. PAID HOLIDAYS: 
NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD 
FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING 
DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE 
PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR 
THE GOVERNOR OF NEW YORK STATE, PROVIDED THE 
EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER 
THE HOLIDAY.........................................$ 49.25                  31.15
ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND 
UNDERGROUND DISTRIBUTION AND MAINTENANCE WORK AND 
ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK 
INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, 
FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT 
BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE 
OF GROUND FAULT PROTECTION AND FIBER OPTIC 
CAPABILITIES : LINEMAN AND TECHNICIAN  FOOTNOTE:    
A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, 
MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR 
DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION 
DAY FOR THE PRESIDENT OF THE UNITED STATES AND 
ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, 
PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO 
DAYS AFTER THE HOLIDAY..............................$ 61.56                  36.21
----------------------------------------------------------------

 ELEC1249-008 01/01/2025
                                                     Rates                  Fringes
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV 
FIBEROPTICS CABLE AND EQUIPMENT INSTALLER 
REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT 
OPERATOR  A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD 
FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR 
DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER 
THANKSGIVING, CHRISTMAS DAY.........................$ 38.73                  6.93
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV 
FIBEROPTICS CABLE AND EQUIPMENT GROUNDMAN  A. NEW 
YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, 
DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, 
VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER 
THANKSGIVING, CHRISTMAS DAY.........................$ 20.53                  6.39
ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV 
FIBEROPTICS CABLE AND EQUIPMENT CABLE SPLICER  A. 
NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, 
DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, 
VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER 
THANKSGIVING, CHRISTMAS DAY.........................$ 40.81                  6.99
----------------------------------------------------------------

 ELEV0138-001 01/01/2026
                                                     Rates                  Fringes
ELEVATOR MECHANIC    FOOTNOTE:    A.VACATION: 
6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR 
ALL HOURS WORKED.  8%/OVER 5 YEARS BASED ON REGULAR 
HOURLY RATE FOR ALL HOURS WORKED.     B. PAID 
HOLIDAYS:  NEW YEAR'S DAY; MEMORIAL DAY; 
INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; 
THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING 
DAY; AND CHRISTMAS DAY..............................$ 76.12                  38.98
----------------------------------------------------------------

 ENGI0137-003 03/04/2024
                                                     Rates                  Fringes
POWER EQUIPMENT OPERATORS: GROUP 6 (BUILDING 
CONSTRUCTION) WAREHOUSE MAN  NOTES:  HAZMAT:     
20% ABOVE REGULAR RATE                      PUMPING 
OPERATION PREMIUM       .50                         
        CRANE OPERATORS (100-149 FT)   2.00         
                       CRANE OPERATORS (149 FT +)   
  3.00                                 LOADER 
OPERATORS (OVER 5 CU Y)  .50                        
    SHOVEL OPERATORS (OVER 4 CU YD)1.00    
FOOTNOTE:        A.  NEW YEARS DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY THANKSGIVING DAY, 
CHRISTMAS DAY, PLUS LINCOLN'S BIRTHDAY, 
WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, 
NOVEMBER ELECTION DAY, VETERAN'S DAY................$ 49.26                  31.32
POWER EQUIPMENT OPERATORS: GROUP 5-B (BUILDING 
CONSTRUCTION) UTILITY MAN  NOTES:  HAZMAT:     20% 
ABOVE REGULAR RATE                      PUMPING 
OPERATION PREMIUM       .50                         
        CRANE OPERATORS (100-149 FT)   2.00         
                       CRANE OPERATORS (149 FT +)   
  3.00                                 LOADER 
OPERATORS (OVER 5 CU Y)  .50                        
    SHOVEL OPERATORS (OVER 4 CU YD)1.00    
FOOTNOTE:        A.  NEW YEARS DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY THANKSGIVING DAY, 
CHRISTMAS DAY, PLUS LINCOLN'S BIRTHDAY, 
WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, 
NOVEMBER ELECTION DAY, VETERAN'S DAY................$ 47.00                  31.32
POWER EQUIPMENT OPERATORS: GROUP 5-A (BUILDING 
CONSTRUCTION) MASTER MECHANIC  NOTES:  HAZMAT:     
20% ABOVE REGULAR RATE                      PUMPING 
OPERATION PREMIUM       .50                         
        CRANE OPERATORS (100-149 FT)   2.00         
                       CRANE OPERATORS (149 FT +)   
  3.00                                 LOADER 
OPERATORS (OVER 5 CU Y)  .50                        
    SHOVEL OPERATORS (OVER 4 CU YD)1.00    
FOOTNOTE:        A.  NEW YEARS DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY THANKSGIVING DAY, 
CHRISTMAS DAY, PLUS LINCOLN'S BIRTHDAY, 
WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, 
NOVEMBER ELECTION DAY, VETERAN'S DAY................$ 61.95                  31.32
POWER EQUIPMENT OPERATORS: GROUP 5 (BUILDING 
CONSTRUCTION) MOTORIZED ROLLER (WALK BEHIND)  
NOTES:  HAZMAT:     20% ABOVE REGULAR RATE          
            PUMPING OPERATION PREMIUM       .50     
                            CRANE OPERATORS 
(100-149 FT)   2.00                                
CRANE OPERATORS (149 FT +)     3.00                 
                LOADER OPERATORS (OVER 5 CU Y)  .50 
                           SHOVEL OPERATORS (OVER 4 
CU YD)1.00    FOOTNOTE:        A.  NEW YEARS DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY 
THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S 
BIRTHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, 
COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY..$ 49.53                  31.32
POWER EQUIPMENT OPERATORS: GROUP 4-B (BUILDING 
CONSTRUCTION) COMPRESSOR TO 125 FEET; DUST; DUST 
COLLECTOR; HEATER ALL TYPES; PUMP; PUMP STATION 
(WATER AND SEWER); STEAM JENNY; SWEEPER; CHIPPER; 
MULCHER.  NOTES:  HAZMAT:     20% ABOVE REGULAR 
RATE                      PUMPING OPERATION PREMIUM 
      .50                                 CRANE 
OPERATORS (100-149 FT)   2.00                       
         CRANE OPERATORS (149 FT +)     3.00        
                         LOADER OPERATORS (OVER 5 
CU Y)  .50                            SHOVEL 
OPERATORS (OVER 4 CU YD)1.00    FOOTNOTE:        A. 
 NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, 
LABOR DAY THANKSGIVING DAY, CHRISTMAS DAY, PLUS 
LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY, GOOD 
FRIDAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, 
VETERAN'S DAY.......................................$ 45.94                  31.32
POWER EQUIPMENT OPERATORS: GROUP 4-A (BUILDING 
CONSTRUCTION) AIR TRACTOR DRILL; BATCH PLANT; 
BENDING MACHINE; CONCRETE BREAKER; CONCRETE 
SPREADER; CURB CUTTER MACHINE; FARM TRACTOR (ALL 
TYPES); FINISHING MACHINE-CONCRETE; HEPAVAC CLEAN 
AIR MACHINE (ALL SIMILAR TYPES: REMOVAL OF ASBESTOS 
ETC.); MATERIAL HOPPER-SAND-STONE-CEMENT; 
MIXER-CONCRETE-UNDER 21E; MULCHING GRASS SPREADER; 
PUMP-GYPSUM, ETC., PUMP-PLASTER-GROUT 
-FIREPROOFING; SHOP MECHANIC (NOT EMPLOYED ON JOB 
SITE); ROLLER UNDER 4 TON; SPREADING AND FINE 
GRADING MACHINE; STEEL CUTTING MACHINE; SYPHON 
PUMP-AIR-STEAM; TAR JOINT MACHINE; TURBO JET BURNER 
OR SIMILAR EQUIPMENT; VIBRATOR (1 TO 5); FINE 
GRADING MACHINE; ROOF HOIST (TUGGER HOIST); 
TELEVISION CAMERAS-WATER- SEWER-GAS-ETC.  NOTES:  
HAZMAT:     20% ABOVE REGULAR RATE                  
    PUMPING OPERATION PREMIUM       .50             
                    CRANE OPERATORS (100-149 FT)   
2.00                                CRANE OPERATORS 
(149 FT +)     3.00                                 
LOADER OPERATORS (OVER 5 CU Y)  .50                 
           SHOVEL OPERATORS (OVER 4 CU YD)1.00    
FOOTNOTE:        A.  NEW YEARS DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY THANKSGIVING DAY, 
CHRISTMAS DAY, PLUS LINCOLN'S BIRTHDAY, 
WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, 
NOVEMBER ELECTION DAY, VETERAN'S DAY................$ 54.33                  31.32
POWER EQUIPMENT OPERATORS: GROUP 3-B (BUILDING 
CONSTRUCTION) COMPRESSOR OVER 125 CU. FEET; 
CONVEYOR BELT MACHINE REGARDLESS OF SIZE; LIGHTING 
UNIT (PORTABLE & GENERATOR); WELDING MACHINE (STEEL 
ERECTION AND EXCAVATION); AND COMPRESSOR PLANT; 
STUD MACHINE; LADDER HOIST.  NOTES:  HAZMAT:     
20% ABOVE REGULAR RATE                      PUMPING 
OPERATION PREMIUM       .50                         
        CRANE OPERATORS (100-149 FT)   2.00         
                       CRANE OPERATORS (149 FT +)   
  3.00                                 LOADER 
OPERATORS (OVER 5 CU Y)  .50                        
    SHOVEL OPERATORS (OVER 4 CU YD)1.00    
FOOTNOTE:        A.  NEW YEARS DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY THANKSGIVING DAY, 
CHRISTMAS DAY, PLUS LINCOLN'S BIRTHDAY, 
WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, 
NOVEMBER ELECTION DAY, VETERAN'S DAY................$ 52.25                  31.32
POWER EQUIPMENT OPERATORS: GROUP 3-A (BUILDING 
CONSTRUCTION) ASPHALT PLANT; BOILER (HIGH 
PRESSURE); CONCRETE MIXING PLANTS; CONCRETE PUMP; 
FIREMEN; FORKLIFT; FORKLIFT (ELECTRIC); JOY DRILL 
OR SIMILAR TRACTOR DRILLING MACHINE; LOADER - 1 1/2 
YARDS AND UNDER; LOCOMOTIVE (ALL SIZES); MIXER 
CONCRETE - 21E AND OVER; PORTABLE ASPHALT PLANT; 
PORTABLE BATCH PLANT; PORTABLE CRUSHER; QUARRY 
MASTER; STONE CRUSHER; WELL DRILLING MACHINE AND 
WELL POINT SYSTEM; CHERRY PICKER UNDER 10 TONS; 
HYDRAULIC CRANE UNDER 10 TONS; CONCERT BUFFY; ONE 
YARD AN UP RIDE ON DUMPER (BENFORD OR SIMILAR).  
NOTES:  HAZMAT:     20% ABOVE REGULAR RATE          
            PUMPING OPERATION PREMIUM       .50     
                            CRANE OPERATORS 
(100-149 FT)   2.00                                
CRANE OPERATORS (149 FT +)     3.00                 
                LOADER OPERATORS (OVER 5 CU Y)  .50 
                           SHOVEL OPERATORS (OVER 4 
CU YD)1.00    FOOTNOTE:        A.  NEW YEARS DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY 
THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S 
BIRTHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, 
COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY..$ 54.88                  31.32
POWER EQUIPMENT OPERATORS: GROUP 2-A (BUILDING 
CONSTRUCTION) COMPACTOR SELF-PROPELLED; GRADER; 
BULLDOZE D7 AND SIMILAR TRACTORS WITH A DRAW BAR 
HORSEPOWER OF 100 OR OVER; BULLDOZER D6 AND UNDER; 
WELDER; SCRAPER 20 YDS STRUCK AND UNDER; MACHINE 
PULLING SHEEP'S FOOT ROLLER; VIBRATORY ROLLERS.  
NOTES:  HAZMAT:     20% ABOVE REGULAR RATE          
            PUMPING OPERATION PREMIUM       .50     
                            CRANE OPERATORS 
(100-149 FT)   2.00                                
CRANE OPERATORS (149 FT +)     3.00                 
                LOADER OPERATORS (OVER 5 CU Y)  .50 
                           SHOVEL OPERATORS (OVER 4 
CU YD)1.00    FOOTNOTE:        A.  NEW YEARS DAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY 
THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S 
BIRTHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, 
COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY..$ 56.97                  31.32
POWER EQUIPMENT OPERATORS: GROUP 1-B (BUILDING 
CONSTRUCTION) COMPRESSOR (STEEL ERECTION); PULSE 
METER AND PUSH BUTTON BUZZ BOX; ELEVATOR; MECHANIC 
(OUTSIDE) ALL TYPES; WELDER; SCRAPERS 20 YDS STRUCK 
AND UNDER; MACHINE PULLING SHEEP'S FOOT ROLLER; 
VIBRATORY ROLLERS; ROLLER 4 TONS AND OVER.  NOTES:  
HAZMAT:     20% ABOVE REGULAR RATE                  
    PUMPING OPERATION PREMIUM       .50             
                    CRANE OPERATORS (100-149 FT)   
2.00                                CRANE OPERATORS 
(149 FT +)     3.00                                 
LOADER OPERATORS (OVER 5 CU Y)  .50                 
           SHOVEL OPERATORS (OVER 4 CU YD)1.00    
FOOTNOTE:        A.  NEW YEARS DAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY THANKSGIVING DAY, 
CHRISTMAS DAY, PLUS LINCOLN'S BIRTHDAY, 
WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, 
NOVEMBER ELECTION DAY, VETERAN'S DAY................$ 54.41                  31.32
POWER EQUIPMENT OPERATORS: GROUP 1-A (BUILDING 
CONSTRUCTION) CARRIER- TRAILER HORSE; 
CONCRET-PORTABLE HOIST; CRANE & HOIST 
ENGINEER-STEEL (CONCRETE, MATERIAL, SUPER STRUCTURE 
SUB- STRUCTURE); DERRICK (STONE-STEEL); ELEVATOR & 
CAGE; HOIST- SINGLE/DOUBLE OR TRIPLE DRUM; 
HOIST-PORTABLE MOBILE UNIT; HOIST ENGINEER-CONCERT 
(CRANE-DERRICK-MINE HOIST); HOIST ENGINEER- 
MATERIAL; OVERHEAD CRANE; POWER HOUSE PLANT; 
TELEPHIES (CABLEWAY); WHIRLY; MAINTENANCE ENGINEER; 
LULL HILIFT OR SIMILAR; HYDRAULIC CRANE 25 TON AND 
OVER; CHERRY PICKER 25 TONS AND OVER; BACKHOE 
OLIVER 88; FORDSON; DYNAHOE; DUAL PURPOSE AND 
SIMILAR MACHINES; BARBER GREEN LOADER-EUCLID LOADER 
OR SIMILAR TYPE; CONWAY OR SIMILAR MUCKING MACKING 
MACHINES; DRAGLINE; GRADALL; SHOVEL; BACKHOE ETC. 
(CRAWLER OR TRUCK); FRONT END LOADERS; HYDRAULIC 
BOOM; JERSEY SPREADER; LIFT SLAB CONSOLE; 
LETOURNEQU OR TOUNAPULL (SCRAPERS OVER 20 YDS 
STRUCK); MUCKING MACHINES; PAVEMENT BREAKER (AIR 
RAM); PAVER (CONCRETE); ROAD BORING MACHINE; ROAD 
MIX MACHINES; ROSS CARRIER AND SIMILAR MACHINES; 
POST HOLE DIGGER; SHOVEL (TUNNELS); SIDE BOOM; 
SPREADER (ASPHALT); SCOOPMOBILE-TRACTOR-SHOVEL OVER 
1 1/2 YDS. TRENCHING MACHINES VERMEER CONCRETE SAW 
TRENCHER AND SIMILAR; TRACTOR TYPE DEMOLITION 
EQUIPMENT; WINCH TRUCK (A FRAME); HYDRAULIC CRANE 
OVER 10 TON UP TO 25 TON); CHERRY PICKER OVER 10 
TON UP TO 25 TON)  NOTES:  HAZMAT:     20% ABOVE 
REGULAR RATE                      PUMPING OPERATION 
PREMIUM       .50                                 
CRANE OPERATORS (100-149 FT)   2.00                 
               CRANE OPERATORS (149 FT +)     3.00  
                               LOADER OPERATORS 
(OVER 5 CU Y)  .50                            
SHOVEL OPERATORS (OVER 4 CU YD)1.00    FOOTNOTE:    
    A.  NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE 
DAY, LABOR DAY THANKSGIVING DAY, CHRISTMAS DAY, 
PLUS LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY, 
GOOD FRIDAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, 
VETERAN'S DAY.......................................$ 59.04                  31.32
----------------------------------------------------------------

 ENGI0137-006 03/04/2024
                                                     Rates                  Fringes
POWER EQUIPMENT OPERATORS: GROUP 5-A-5 
JERSEY-SPREADER, PAVEMENT BREAKER (AIR RAM); POST 
HOLE DIGGER   (HEAVY & HIGHWAY)    NOTES:      
LOADER OPERATOR (OVER 5 CU YDS)             .50     
 SHOVAL OPERATORS (OVER 4 CU YD)            1.00   
HAZMAT PREMIUM OVER REGULAR RATE  20%    CRANES:   
100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 
RATE   149 FT AND OVER RECEIVE $3.00 MORE THAN 
GROUP 1 RATE  FOOTNOTE:    A. PAID HOLIDAYS:  NEW 
YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; 
MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS 
DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; 
THANKSGIVING DAY; AND CHRISTMAS DAY.................$ 59.19                  35.25
POWER EQUIPMENT OPERATORS: GROUP 5-A-4 HOIST 
ENGINEER- STEEL -SUB STRUCTURE  (HEAVY & HIGHWAY)   
 NOTES:      LOADER OPERATOR (OVER 5 CU YDS)        
     .50      SHOVAL OPERATORS (OVER 4 CU YD)       
     1.00   HAZMAT PREMIUM OVER REGULAR RATE  20%   
 CRANES:   100 FT- 149 FT: RECEIVE $2.00 MORE THAN 
GROUP 1 RATE   149 FT AND OVER RECEIVE $3.00 MORE 
THAN GROUP 1 RATE  FOOTNOTE:    A. PAID HOLIDAYS:  
NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; 
MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS 
DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; 
THANKSGIVING DAY; AND CHRISTMAS DAY.................$ 70.41                  35.25
POWER EQUIPMENT OPERATORS: GROUP 5-A-3 ENGINEER-- 
PILE DRIVER  (HEAVY & HIGHWAY)    NOTES:      
LOADER OPERATOR (OVER 5 CU YDS)             .50     
 SHOVAL OPERATORS (OVER 4 CU YD)            1.00   
HAZMAT PREMIUM OVER REGULAR RATE  20%    CRANES:   
100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 
RATE   149 FT AND OVER RECEIVE $3.00 MORE THAN 
GROUP 1 RATE  FOOTNOTE:    A. PAID HOLIDAYS:  NEW 
YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; 
MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS 
DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; 
THANKSGIVING DAY; AND CHRISTMAS DAY.................$ 75.13                  35.25
POWER EQUIPMENT OPERATORS: GROUP 5-A-2 ENGINEER - 
ALL TOWER CRANES, ALL CLIMBING CRANES AND ALL 
CRANES OF 100 TON CAPACITY OR GREATER (3900 
MANITOWAC OR SIMILAR) IRRESPECTIVE OF MANUFACTURER 
AND REGARDLESS OF HOW THE SAME IS RIGGED  (EXCEPT 
FOR PILE RIGS).  (HEAVY & HIGHWAY)    NOTES:      
LOADER OPERATOR (OVER 5 CU YDS)             .50     
 SHOVAL OPERATORS (OVER 4 CU YD)            1.00   
HAZMAT PREMIUM OVER REGULAR RATE  20%    CRANES:   
100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 
RATE   149 FT AND OVER RECEIVE $3.00 MORE THAN 
GROUP 1 RATE  FOOTNOTE:    A. PAID HOLIDAYS:  NEW 
YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; 
MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS 
DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; 
THANKSGIVING DAY; AND CHRISTMAS DAY.................$ 77.82                  35.25
POWER EQUIPMENT OPERATORS: GROUP 5-A-1 MASTER 
MECHANIC  (HEAVY & HIGHWAY)    NOTES:      LOADER 
OPERATOR (OVER 5 CU YDS)             .50      
SHOVAL OPERATORS (OVER 4 CU YD)            1.00   
HAZMAT PREMIUM OVER REGULAR RATE  20%    CRANES:   
100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 
RATE   149 FT AND OVER RECEIVE $3.00 MORE THAN 
GROUP 1 RATE  FOOTNOTE:    A. PAID HOLIDAYS:  NEW 
YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; 
MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS 
DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; 
THANKSGIVING DAY; AND CHRISTMAS DAY.................$ 64.02                  35.25
POWER EQUIPMENT OPERATORS: GROUP 5 OILER  (HEAVY & 
HIGHWAY)    NOTES:      LOADER OPERATOR (OVER 5 CU 
YDS)             .50      SHOVAL OPERATORS (OVER 4 
CU YD)            1.00   HAZMAT PREMIUM OVER 
REGULAR RATE  20%    CRANES:   100 FT- 149 FT: 
RECEIVE $2.00 MORE THAN GROUP 1 RATE   149 FT AND 
OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE  
FOOTNOTE:    A. PAID HOLIDAYS:  NEW YEAR'S DAY; 
LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; 
INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS 
DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND 
CHRISTMAS DAY.......................................$ 64.02                  35.25
POWER EQUIPMENT OPERATORS: GROUP 4-B OILER; 
COMPRESSOR - COMPRESSOR PLANT; PAINT 
COMPRESSOR-STEEL ERECTION; CONVEYOR BELT MACHINE; 
LIGHTING UNIT (PORTABLE & GENERATOR); OILER; PUMPS 
- PUMP STATION-WATER-SEWER- GYPSUM- PLASTER, ETC.; 
ROLLER-MOTORIZED (WALK-BEHIND); WELDING MACHINE 
(STEEL ERECTION EXCAVATION); WELL POINT SYSTEM; 
BENDING MACHINE; DUST COLLECTOR; MIXER - CONCRETE 
UNDER 21-E; HEATER ALL TYPES; STEAM JENNY; SYPHON 
PUMP-AIR-STEAM; TAR JOINT MACHINE; VIBRATOR (1 TO 
5); COMPRESSOR TRUCK MOUNTED (2-6)  (HEAVY & 
HIGHWAY)    NOTES:      LOADER OPERATOR (OVER 5 CU 
YDS)             .50      SHOVAL OPERATORS (OVER 4 
CU YD)            1.00   HAZMAT PREMIUM OVER 
REGULAR RATE  20%    CRANES:   100 FT- 149 FT: 
RECEIVE $2.00 MORE THAN GROUP 1 RATE   149 FT AND 
OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE  
FOOTNOTE:    A. PAID HOLIDAYS:  NEW YEAR'S DAY; 
LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; 
INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS 
DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND 
CHRISTMAS DAY.......................................$ 44.19                  35.25
POWER EQUIPMENT OPERATORS: GROUP 4-A SERVICE MEN 
(FUEL OR GREASE TRUCK).  (HEAVY & HIGHWAY)    
NOTES:      LOADER OPERATOR (OVER 5 CU YDS)         
    .50      SHOVAL OPERATORS (OVER 4 CU YD)        
    1.00   HAZMAT PREMIUM OVER REGULAR RATE  20%    
CRANES:   100 FT- 149 FT: RECEIVE $2.00 MORE THAN 
GROUP 1 RATE   149 FT AND OVER RECEIVE $3.00 MORE 
THAN GROUP 1 RATE  FOOTNOTE:    A. PAID HOLIDAYS:  
NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; 
MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS 
DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; 
THANKSGIVING DAY; AND CHRISTMAS DAY.................$ 51.57                  35.25
POWER EQUIPMENT OPERATORS: GROUP 3 A:  AIR TRACTOR 
DRILL; ASPHALT PLANT; BATCH PLANT; BOILER (HIGH 
PRESSURE; CONCRETE BREAKER; CONCRETE PUMP CONCRETE 
SPREADER; CURB CUTTER MACHINE; FARM TRACTOR (ALL 
TYPES); FINISHING MACHINE (CONCRETE); FINE GRADING 
MACHINE; FIREMAN; FORKLIFT; FORKLIFT (ELECTRIC); 
JOY DRILL OR SIMILAR TRACTOR DRILLING MACHINE; 
LOADER - 1 1/2 YARDS AND UNDER; LOCOMOTIVE (ALL 
SIZES), MAINTENANCE ENGINEER; MACHINE PULLING 
SHEEPS FOOT ROLLER; MATERIAL HOPPER; MIXER CONCRETE 
- 21-E AND OVER; MULCHING GRASS SPREADER; PORTABLE 
ASPHALT PLANT, PORTABLE BATCH PLANT, PORTABLE 
CRUSHER; POWERHOUSE PLANT; QUARRY MASTER; ROLLER 
UNDER 4 TON; SPREADING AND FINE GRADING MACHINE; 
STEEL CUTTING MACHINE; STONE CRUSHER; SWEEPER; 
TURBOJET BURNER OR SIMILAR; WELL DRILLING MACHINE ; 
WINCH TRUCK ""A"" FRAME. JOHN HENRY DRILL OR SIMILAR. 
 (HEAVY & HIGHWAY)    NOTES:      LOADER OPERATOR 
(OVER 5 CU YDS)             .50      SHOVAL 
OPERATORS (OVER 4 CU YD)            1.00   HAZMAT 
PREMIUM OVER REGULAR RATE  20%    CRANES:   100 FT- 
149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE   149 
FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE  
FOOTNOTE:    A. PAID HOLIDAYS:  NEW YEAR'S DAY; 
LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; 
INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS 
DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND 
CHRISTMAS DAY.......................................$ 56.81                  35.25
POWER EQUIPMENT OPERATORS: GROUP 2-B MECHANIC 
(OUTSIDE) ALL TYPES  (HEAVY & HIGHWAY)    NOTES:    
  LOADER OPERATOR (OVER 5 CU YDS)             .50   
   SHOVAL OPERATORS (OVER 4 CU YD)            1.00  
 HAZMAT PREMIUM OVER REGULAR RATE  20%    CRANES:   
100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 
RATE   149 FT AND OVER RECEIVE $3.00 MORE THAN 
GROUP 1 RATE  FOOTNOTE:    A. PAID HOLIDAYS:  NEW 
YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; 
MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS 
DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; 
THANKSGIVING DAY; AND CHRISTMAS DAY  ...............$ 59.67                  35.25
POWER EQUIPMENT OPERATORS: GROUP 2-A BALLAST 
REGULATORS; COMPACTOR SELF-PROPELLED; COW TRACKS; 
FUSION MACHINE; RAIL ANCHOR MACHINES; ROLLER 4 TON 
AND OVER; SCRAPERS - 20 YARDS STRUCK; SWITCH 
TAMPERS; VIBRATORY ROLLER, ETC.  (HEAVY & HIGHWAY)  
  NOTES:      LOADER OPERATOR (OVER 5 CU YDS)       
      .50      SHOVAL OPERATORS (OVER 4 CU YD)      
      1.00   HAZMAT PREMIUM OVER REGULAR RATE  20%  
  CRANES:   100 FT- 149 FT: RECEIVE $2.00 MORE THAN 
GROUP 1 RATE   149 FT AND OVER RECEIVE $3.00 MORE 
THAN GROUP 1 RATE  FOOTNOTE:    A. PAID HOLIDAYS:  
NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; 
MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS 
DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; 
THANKSGIVING DAY; AND CHRISTMAS DAY.................$ 57.84                  35.25
POWER EQUIPMENT OPERATORS: GROUP 1-B ROAD PAVER, 
ASPHALT  (HEAVY & HIGHWAY)    NOTES:      LOADER 
OPERATOR (OVER 5 CU YDS)             .50      
SHOVAL OPERATORS (OVER 4 CU YD)            1.00   
HAZMAT PREMIUM OVER REGULAR RATE  20%    CRANES:   
100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 
RATE   149 FT AND OVER RECEIVE $3.00 MORE THAN 
GROUP 1 RATE  FOOTNOTE:    A. PAID HOLIDAYS:  NEW 
YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; 
MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS 
DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; 
THANKSGIVING DAY; AND CHRISTMAS DAY.................$ 63.70                  35.25
POWER EQUIPMENT OPERATORS: GROUP 1-A AUGER; AUTO 
GRADER; DYNAHOE AND DUAL PURPOSE AND SIMILAR 
MACHINES; BOAT CAPTAIN; BORING MACHINE (ALL TYPES); 
BULL DOZER-ALL SIZES; CENTRAL MIX PLANT OPERATOR; 
CHIPPER-ALL TYPES; CLOSE CIRCUIT T.V.; COMPACTOR 
WITH BLADE; CONCRETE PORTABLE HOIST; C.M.I. OR 
SIMILAR; CONWAY OR SIMILAR MUCKING MACHINES; 
GRADALL, SHOVEL BACKHOE, ETC. GRADER; DERRICK, 
(STONE- STEEL; ELEVATOR & CAGE, MATERIALS OR 
PASSENGERS; FRONT END LOADERS OVER 1 1/2 YDS.; 
HOIST SINGLE, DOUBLE, TRIPLE DRUM, HOIST PORTABLE 
MOBILE UNIT; HOIST ENGINEER-CONCRETE 
(CRANE-DERRICK-MINE HOIST); HOIST 
ENGINEER-MATERIAL, HYDRAULIC BOOM; LETOURNEAU OR 
TOURNAPULL (SCRAPERS OVER 20 YDS. STRUCK); LOG 
SKIDDER; MOVABLE CONCRETE BARRIER TRANSFER & 
TRANSPORT VEHICLE; MUCKING MACHINES; OVERHEAD 
CRANE; PAVER (CONCCRETE); PULSEMETER; PUSH BUTTON 
(BUZZ BOX) ELEVATOR; ROAD MIX MACHINES; ROBOT 
HAMMER (BROCK OR SIMILAR), ROSS CARRIER AND SIMILAR 
MACHINES; SHOVELS (TUNNELS); SIDE BOOM; SLIP FORM 
MACHINE; SPREADER (ASPHALT); 
SCOOPMOBILE-TRACTOR-SHOVEL OVER 1 1/2 YARDS; 
TRENCHING MACHINES; TELEPHIES- VERMEER CONCRETE SAW 
TRENCHER AND/OR SIMILAR; TRACTOR-TYPE DEMOLITION 
EQUIPMENT, WHIRLY  (HEAVY & HIGHWAY)    NOTES:      
LOADER OPERATOR (OVER 5 CU YDS)             .50     
 SHOVAL OPERATORS (OVER 4 CU YD)            1.00   
HAZMAT PREMIUM OVER REGULAR RATE  20%    CRANES:   
100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 
RATE   149 FT AND OVER RECEIVE $3.00 MORE THAN 
GROUP 1 RATE  FOOTNOTE:    A. PAID HOLIDAYS:  NEW 
YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; 
MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS 
DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; 
THANKSGIVING DAY; AND CHRISTMAS DAY.................$ 60.42                  35.25
POWER EQUIPMENT OPERATORS: GROUP 1 BOOM TRUCK; 
CHERRY PICKER; CLAMSHELL; CRANE, (CRAWLER, TRUCK); 
DRAGLINE; ROUGH TERRAIN CRANE  (HEAVY & HIGHWAY)    
NOTES:      LOADER OPERATOR (OVER 5 CU YDS)         
    .50      SHOVAL OPERATORS (OVER 4 CU YD)        
    1.00   HAZMAT PREMIUM OVER REGULAR RATE  20%    
CRANES:   100 FT- 149 FT: RECEIVE $2.00 MORE THAN 
GROUP 1 RATE   149 FT AND OVER RECEIVE $3.00 MORE 
THAN GROUP 1 RATE  FOOTNOTE:    A. PAID HOLIDAYS:  
NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; 
MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS 
DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; 
THANKSGIVING DAY; AND CHRISTMAS DAY.................$ 68.63                  35.25
----------------------------------------------------------------

 IRON0417-001 07/01/2025
                                                     Rates                  Fringes
IRONWORKER   A) PAID HOLIDAYS: NEW YEAR'S DAY, 
MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, 
THANKSGIVING DAY, DAY AFTER THANKSGIVING (UNPAID), 
CHRISTMAS DAY.......................................$ 42.63                  53.70
----------------------------------------------------------------

 LABO0060-001 03/30/2025
                                                     Rates                  Fringes
LABORERS: HEAVY: GROUP 7 ASBESTOS AND TOXIC WASTE 
LABORER     FOOTNOTE:    A.  PAID HOLIDAYS: NEW 
YEAR'S DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S 
BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE 
DAY, LABOR DAY, COLUMBUS DAY, NOVEMBER ELECTION 
DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS 
DAY.................................................$ 51.64                  28.98
LABORERS: HEAVY: GROUP 6 FLAGPERSON  FOOTNOTE:    
A.  PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S 
BIRTHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS 
DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY, 
THANKSGIVING DAY AND CHRISTMAS DAY..................$ 42.96                  28.98
LABORERS: HEAVY: GROUP 5 COMMON LABORERS, SIGNAL 
PERSON AND PIT PERSON , TRUCK SPOTTERS, POWDER 
PERSON, LANDSCAPE AND NURSERY PERSON, DUMP PERSON.  
FOOTNOTE:    A.  PAID HOLIDAYS: NEW YEAR'S DAY, 
LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY, GOOD 
FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY, 
THANKSGIVING DAY AND CHRISTMAS DAY..................$ 49.56                  28.98
LABORERS: HEAVY: GROUP 4 GENERAL CONCRETE 
LABORERS-ANYTHING PERTAINING TO CONCRETE, AGGREGATE 
OR CONCRETE MATERIAL HANDLING, PUDDLERS, ASPHALT 
WORKER, ROCK SCALERS, VIBRATOR OPERATOR, BIT 
GRINDER, CONCRETE GRINDER, AIR TAMPERS AND ALL 
TAMPERS NOT COVERED BY ANY OTHER CLASSIFICATION, 
FORM PIN PULLER, PUMPS AND THEIR OPERATION, SERVICE 
OF AIR POWER, EPOXY AND WATERPROOFING WORKER, FINE 
GRADE PERSON BETWEEN FORMS, BARCO RAMMER, GUARD AND 
GUIDE RAIL AND LINK FENCE, STEEL KINGS.  FOOTNOTE:  
  A.  PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S 
BIRTHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, 
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS 
DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY, 
THANKSGIVING DAY AND CHRISTMAS DAY..................$ 49.93                  28.98
LABORERS: HEAVY: GROUP 3 ASPHALT CURB MACHINE 
OPERATOR, JEEPER OPERATOR, PAVEMENT BREAKER 
OPERATOR, POWER SAW OPERATOR, JACK HAMMER DRILLER.  
 ALL TYPES OF PHEUMATIC TOOLS GASOLINE DRILLER, 
CONCRETE SAW, GUNNITING, RAILROAD SPIKE PULLER AND 
SANDBLASTING, PIPE LAYER, DECK WINCHES ON SCOWS, 
POWER BUGGY OPERATOR, POWER WHEELBARROW OPERATOR.  
FOOTNOTE:    A.  PAID HOLIDAYS: NEW YEAR'S DAY, 
LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY, GOOD 
FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY, 
THANKSGIVING DAY AND CHRISTMAS DAY..................$ 50.29                  28.98
LABORERS: HEAVY: GROUP 2 BURNER, JUMBO DRILLER, JOY 
DRILLER, WAGON DRILLER, AIR TRACK DRILLER, 
HYDRAULIC DRILLER, CONCRETE FORM ALIGNER, CONCRETE 
FORM AND CURB FORM (STEEL), ASPHALT SCREEDMAN, 
ASPHALT RAKER.  FOOTNOTE:    A.  PAID HOLIDAYS: NEW 
YEAR'S DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S 
BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE 
DAY, LABOR DAY, COLUMBUS DAY, NOVEMBER ELECTION 
DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS 
DAY.................................................$ 50.71                  28.98
LABORERS: HEAVY: GROUP 1 BLASTERS.  FOOTNOTE:    A. 
 PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, 
WASHINGTON'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, NOVEMBER 
ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND 
CHRISTMAS DAY.......................................$ 52.11                  28.98
----------------------------------------------------------------

 LABO0235-001 05/01/2025
                                                     Rates                  Fringes
LABORER (BUILDING)..................................$ 44.05                  32.40
----------------------------------------------------------------

 LABO0235-004 05/01/2023
                                                     Rates                  Fringes
LABORERS: HIGHWAY: GROUP 3 ASPHALT RAKER, ASPHALT 
SCREEMAN, DRILLERS (ALL), LASER BEAM OPERATOR, FORM 
SETTER/ALIGNERS, BLASTERS, LEAD MAN, TUNNEL & 
CAISSON  FOOTNOTE:     A.  PAID HOLIDAYS:  NEW 
YEARS DAY, PRESIDENTS DAY, GOOD FRIDAY, MEMORIAL 
DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, 
VETERAN'S DAY, NOVEMBER ELECTION DAY, THANKSGIVING 
DAY AND CHRISTMAS DAY...............................$ 43.90                  27.80
LABORERS: HIGHWAY: GROUP 2 GENERAL LABORERS, 
DUMPMAN, PITMAN, CONCRETE MAN, SIGNAL MAN, 
PIPELAYER, RIP RAP, DRY STONE LAYER, JACK HAMMER, 
POWDERMAN, HIGHSCALERS POWER BUGGY OPERATOR, STEEL 
ROD CARRIER, VIBRATORY OPERATOR, OTHER MACHINE 
OPERATOR, WRECKING, VIBRATOR OPERATOR-COMPACTOR, 
GUNITE AND SAND BLASTING, WATER PUMP 2"" OR UNDER, 
NIPPER, CHUCKER, ASPHALT WORKER  FOOTNOTE:     A.  
PAID HOLIDAYS:  NEW YEARS DAY, PRESIDENTS DAY, GOOD 
FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, 
COLUMBUS DAY, VETERAN'S DAY, NOVEMBER ELECTION DAY, 
THANKSGIVING DAY AND CHRISTMAS DAY..................$ 42.80                  27.80
LABORERS: HIGHWAY: GROUP 1 FLAGPERSON, PLACING AND 
MAINTENANCE OF ALL FLARES, CONES, LIGHTS, SIGNS, 
BARRICADES, TRAFFIC PATTERNS, AND ALL REFLECTIVE 
TYPE MATERIALS FOR TRAFFIC CONTROL, CUSTODIAL WORK, 
TRAFFIC DIRECTORS, TEMPORARY HEAT OR LIGHT TENDERS  
FOOTNOTE:     A.  PAID HOLIDAYS:  NEW YEARS DAY, 
PRESIDENTS DAY, GOOD FRIDAY, MEMORIAL DAY, 
INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, 
VETERAN'S DAY, NOVEMBER ELECTION DAY, THANKSGIVING 
DAY AND CHRISTMAS DAY...............................$ 36.45                  27.80
----------------------------------------------------------------

 PAIN0009-003 05/01/2025
                                                     Rates                  Fringes
PAINTER (SPRAY, SCAFFOLD, SANDBLASTING).............$ 47.75                  44.11
PAINTER (PAINTERS, PAPERHANGER, DRYWALL FINISHERS & 
LEAD ABATEMENT WORKER)..............................$ 44.75                  44.11
PAINTER (GLAZIERS)..................................$ 49.20                  57.20
----------------------------------------------------------------

 PLUM0021-001 05/01/2025
                                                     Rates                  Fringes
PLUMBER AND STEAMFITTER (ZONE 1)....................$ 65.07                  45.35
----------------------------------------------------------------

 ROOF0008-002 05/01/2025
                                                     Rates                  Fringes
ROOFER..............................................$ 50.25                  32.62
----------------------------------------------------------------

 SFNY0669-002 01/01/2026
                                                     Rates                  Fringes
SPRINKLER FITTER....................................$ 57.20                  32.66
----------------------------------------------------------------

 SHEE0038-001 07/01/2025
                                                     Rates                  Fringes
SHEET METAL WORKER..................................$ 55.29                  47.43
----------------------------------------------------------------

 TEAM0456-001 07/01/2025
                                                     Rates                  Fringes
TRUCK DRIVERS: HEAVY & HIGHWAY CONSTRUCION- GROUP  
5 14 WHEELER.  HAZARDOUS/TOXIC WASTE - AN 
ADDITIONAL 20% OF THE BASIC HOURLY WAGE RATE SET 
FORTH IN THIS WAGE DETERMINATION.  A. PAID 
HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, 
PRESIDENT'S DAY, DECORATION DAY,  INDEPENDENCE DAY, 
LABOR DAY, NOVEMBER ELECTION DAY, THANKSGIVING DAY, 
DAY AFTER THANKSGIVING AND CHRISTMAS DAY, PROVIDED 
EMPLOYEE WORKS TWO OR MORE DAYS IN THE CALENDAR     
 WEEK IN WHICH THE HOLIDAY FALLS.  PAID VACATION: 4 
WEEKS PAID VACATION AFTER 20 YEARS OF SERVICE AND 
30 DAYS OF EMPLOYMENT IN CURRENT CONTRACT YEAR; 3 
WEEKS AFTER 10 YEARS OF SENIORITY SERVICE; 3 WEEKS 
AFTER 10 YEARS AND 60 DAYS OF EMPLOYMENT IN 
CONTRACT YEAR, 3 WEEKS AND 1 DAY AFTER 16 YEARS OF 
SENIORITY SERVICE, 3 WEEKS AND 2 DAYS AFTER 17 
YEARS OF SENIORITY SERVICE; 3 WEEKS AND 3 DAYS 
AFTER 18 YEARS OF SENIORITY SERVICE; 3 WEEKS AND 4 
DAYS AFTER 19 YEARS OF SENIORITY SERVICE; THE THIRD 
WEEK AND EVERY ADDITIONAL DAY SHALL BE GRANTED TO 
EMPLOYEE IN THE CALENDAR YEAR IN WHICH HE COMPLETES 
HIS TENTH OR OTHER YEARS OF SENIORITY SERVICE; 2 
WEEKS AFTER 130 DAYS OF EMPLOYMENT IN THE CALENDAR 
YEAR; 2 WEEKS AFTER 5 YEARS AND 90 DAYS SENIORITY 
SERVICE IN CALANDER YEAR; 1 WEEK AND 1 ADDITIONAL 
DAY FOR EACH ADDITIONAL 18 DAYS OF EMPLOYMENT NOT 
EXCEEDING 10 DAYS IN ANY ONE CALANDER YEAR AFTER 90 
DAYS OF EMPLOYMENT. CASUAL EMPLOYEES 1 DAY FOR 
EVERY 18 DAYS OF EMPLOYMENT. AN EMPLOYEE WHO DOES 
NOT QUALIFY FOR VACATION SHALL BE PAID PRO RATA ON 
A DAILY BASIS. HOLIDAY SHALL BE COUNTED AS DAYS 
WORKED FOR VACATION BENEFITS.  LEGAL SERVICES FUND: 
EMPLOYER SHALL CONTRIBUTE $.20 TO THE FUND ON THE 
SAME BASIS FOR ALL HOURS PAID TO EMPLOYEES IN THE 
FORM OF HOLIDAY PAY OR VACATION PAY.  IN ADDITION 
TO THE BENEFITS PAID FOR HEALTH-WELFARE AND PENSION 
FOR UP TO 40 HOURS WORKED AN ADDITIONAL $.25 IS 
PAID FOR EACH HOUR WORKED. THE EMPLOYER SHALL GRANT 
3 CALENDAR DAYS OFF WITHOUT LOSS OF PAY TO AN 
EMPLOYEE WHO HAS DEATH IN HIS/HER IMMEDIATE FAMILY, 
INCLUSIVE OF THE DAY OF THE FUNERAL.................$ 48.63                  38.93
TRUCK DRIVERS: GROUP 11 OFF ROAD EQUIPMENT (UNDER 
40 TONS) DJB  HAZARDOUS/TOXIC WASTE - AN ADDITIONAL 
20% OF THE BASIC HOURLY WAGE RATE SET FORTH IN THIS 
WAGE DETERMINATION.  A. PAID HOLIDAYS: NEW YEAR'S 
DAY, LINCOLN'S BIRTHDAY, PRESIDENT'S DAY, 
DECORATION DAY,  INDEPENDENCE DAY, LABOR DAY, 
NOVEMBER ELECTION DAY, THANKSGIVING DAY, DAY AFTER 
THANKSGIVING AND CHRISTMAS DAY, PROVIDED EMPLOYEE 
WORKS TWO OR MORE DAYS IN THE CALENDAR      WEEK IN 
WHICH THE HOLIDAY FALLS.  PAID VACATION: 4 WEEKS 
PAID VACATION AFTER 20 YEARS OF SERVICE AND 30 DAYS 
OF EMPLOYMENT IN CURRENT CONTRACT YEAR; 3 WEEKS 
AFTER 10 YEARS OF SENIORITY SERVICE; 3 WEEKS AFTER 
10 YEARS AND 60 DAYS OF EMPLOYMENT IN CONTRACT 
YEAR, 3 WEEKS AND 1 DAY AFTER 16 YEARS OF SENIORITY 
SERVICE, 3 WEEKS AND 2 DAYS AFTER 17 YEARS OF 
SENIORITY SERVICE; 3 WEEKS AND 3 DAYS AFTER 18 
YEARS OF SENIORITY SERVICE; 3 WEEKS AND 4 DAYS 
AFTER 19 YEARS OF SENIORITY SERVICE; THE THIRD WEEK 
AND EVERY ADDITIONAL DAY SHALL BE GRANTED TO 
EMPLOYEE IN THE CALENDAR YEAR IN WHICH HE COMPLETES 
HIS TENTH OR OTHER YEARS OF SENIORITY SERVICE; 2 
WEEKS AFTER 130 DAYS OF EMPLOYMENT IN THE CALENDAR 
YEAR; 2 WEEKS AFTER 5 YEARS AND 90 DAYS SENIORITY 
SERVICE IN CALANDER YEAR; 1 WEEK AND 1 ADDITIONAL 
DAY FOR EACH ADDITIONAL 18 DAYS OF EMPLOYMENT NOT 
EXCEEDING 10 DAYS IN ANY ONE CALANDER YEAR AFTER 90 
DAYS OF EMPLOYMENT. CASUAL EMPLOYEES 1 DAY FOR 
EVERY 18 DAYS OF EMPLOYMENT. AN EMPLOYEE WHO DOES 
NOT QUALIFY FOR VACATION SHALL BE PAID PRO RATA ON 
A DAILY BASIS. HOLIDAY SHALL BE COUNTED AS DAYS 
WORKED FOR VACATION BENEFITS.  LEGAL SERVICES FUND: 
EMPLOYER SHALL CONTRIBUTE $.20 TO THE FUND ON THE 
SAME BASIS FOR ALL HOURS PAID TO EMPLOYEES IN THE 
FORM OF HOLIDAY PAY OR VACATION PAY.  IN ADDITION 
TO THE BENEFITS PAID FOR HEALTH-WELFARE AND PENSION 
FOR UP TO 40 HOURS WORKED AN ADDITIONAL $.25 IS 
PAID FOR EACH HOUR WORKED. THE EMPLOYER SHALL GRANT 
3 CALENDAR DAYS OFF WITHOUT LOSS OF PAY TO AN 
EMPLOYEE WHO HAS DEATH IN HIS/HER IMMEDIATE FAMILY, 
INCLUSIVE OF THE DAY OF THE FUNERAL.................$ 50.26                  38.93
TRUCK DRIVERS: GROUP 10 OFF ROAD EQUIPMENT (OVER 40 
TONS) EUCLID, DJB  HAZARDOUS/TOXIC WASTE - AN 
ADDITIONAL 20% OF THE BASIC HOURLY WAGE RATE SET 
FORTH IN THIS WAGE DETERMINATION.  A. PAID 
HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, 
PRESIDENT'S DAY, DECORATION DAY,  INDEPENDENCE DAY, 
LABOR DAY, NOVEMBER ELECTION DAY, THANKSGIVING DAY, 
DAY AFTER THANKSGIVING AND CHRISTMAS DAY, PROVIDED 
EMPLOYEE WORKS TWO OR MORE DAYS IN THE CALENDAR     
 WEEK IN WHICH THE HOLIDAY FALLS.  PAID VACATION: 4 
WEEKS PAID VACATION AFTER 20 YEARS OF SERVICE AND 
30 DAYS OF EMPLOYMENT IN CURRENT CONTRACT YEAR; 3 
WEEKS AFTER 10 YEARS OF SENIORITY SERVICE; 3 WEEKS 
AFTER 10 YEARS AND 60 DAYS OF EMPLOYMENT IN 
CONTRACT YEAR, 3 WEEKS AND 1 DAY AFTER 16 YEARS OF 
SENIORITY SERVICE, 3 WEEKS AND 2 DAYS AFTER 17 
YEARS OF SENIORITY SERVICE; 3 WEEKS AND 3 DAYS 
AFTER 18 YEARS OF SENIORITY SERVICE; 3 WEEKS AND 4 
DAYS AFTER 19 YEARS OF SENIORITY SERVICE; THE THIRD 
WEEK AND EVERY ADDITIONAL DAY SHALL BE GRANTED TO 
EMPLOYEE IN THE CALENDAR YEAR IN WHICH HE COMPLETES 
HIS TENTH OR OTHER YEARS OF SENIORITY SERVICE; 2 
WEEKS AFTER 130 DAYS OF EMPLOYMENT IN THE CALENDAR 
YEAR; 2 WEEKS AFTER 5 YEARS AND 90 DAYS SENIORITY 
SERVICE IN CALANDER YEAR; 1 WEEK AND 1 ADDITIONAL 
DAY FOR EACH ADDITIONAL 18 DAYS OF EMPLOYMENT NOT 
EXCEEDING 10 DAYS IN ANY ONE CALANDER YEAR AFTER 90 
DAYS OF EMPLOYMENT. CASUAL EMPLOYEES 1 DAY FOR 
EVERY 18 DAYS OF EMPLOYMENT. AN EMPLOYEE WHO DOES 
NOT QUALIFY FOR VACATION SHALL BE PAID PRO RATA ON 
A DAILY BASIS. HOLIDAY SHALL BE COUNTED AS DAYS 
WORKED FOR VACATION BENEFITS.  LEGAL SERVICES FUND: 
EMPLOYER SHALL CONTRIBUTE $.20 TO THE FUND ON THE 
SAME BASIS FOR ALL HOURS PAID TO EMPLOYEES IN THE 
FORM OF HOLIDAY PAY OR VACATION PAY.  IN ADDITION 
TO THE BENEFITS PAID FOR HEALTH-WELFARE AND PENSION 
FOR UP TO 40 HOURS WORKED AN ADDITIONAL $.25 IS 
PAID FOR EACH HOUR WORKED. THE EMPLOYER SHALL GRANT 
3 CALENDAR DAYS OFF WITHOUT LOSS OF PAY TO AN 
EMPLOYEE WHO HAS DEATH IN HIS/HER IMMEDIATE FAMILY, 
INCLUSIVE OF THE DAY OF THE FUNERAL.................$ 50.51                  38.93
TRUCK DRIVERS: GROUP  9 OFF ROAD EQUIPMENT (UNDER 
40 TONS):  EUCLID  HAZARDOUS/TOXIC WASTE - AN 
ADDITIONAL 20% OF THE BASIC HOURLY WAGE RATE SET 
FORTH IN THIS WAGE DETERMINATION.  A. PAID 
HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, 
PRESIDENT'S DAY, DECORATION DAY,  INDEPENDENCE DAY, 
LABOR DAY, NOVEMBER ELECTION DAY, THANKSGIVING DAY, 
DAY AFTER THANKSGIVING AND CHRISTMAS DAY, PROVIDED 
EMPLOYEE WORKS TWO OR MORE DAYS IN THE CALENDAR     
 WEEK IN WHICH THE HOLIDAY FALLS.  PAID VACATION: 4 
WEEKS PAID VACATION AFTER 20 YEARS OF SERVICE AND 
30 DAYS OF EMPLOYMENT IN CURRENT CONTRACT YEAR; 3 
WEEKS AFTER 10 YEARS OF SENIORITY SERVICE; 3 WEEKS 
AFTER 10 YEARS AND 60 DAYS OF EMPLOYMENT IN 
CONTRACT YEAR, 3 WEEKS AND 1 DAY AFTER 16 YEARS OF 
SENIORITY SERVICE, 3 WEEKS AND 2 DAYS AFTER 17 
YEARS OF SENIORITY SERVICE; 3 WEEKS AND 3 DAYS 
AFTER 18 YEARS OF SENIORITY SERVICE; 3 WEEKS AND 4 
DAYS AFTER 19 YEARS OF SENIORITY SERVICE; THE THIRD 
WEEK AND EVERY ADDITIONAL DAY SHALL BE GRANTED TO 
EMPLOYEE IN THE CALENDAR YEAR IN WHICH HE COMPLETES 
HIS TENTH OR OTHER YEARS OF SENIORITY SERVICE; 2 
WEEKS AFTER 130 DAYS OF EMPLOYMENT IN THE CALENDAR 
YEAR; 2 WEEKS AFTER 5 YEARS AND 90 DAYS SENIORITY 
SERVICE IN CALANDER YEAR; 1 WEEK AND 1 ADDITIONAL 
DAY FOR EACH ADDITIONAL 18 DAYS OF EMPLOYMENT NOT 
EXCEEDING 10 DAYS IN ANY ONE CALANDER YEAR AFTER 90 
DAYS OF EMPLOYMENT. CASUAL EMPLOYEES 1 DAY FOR 
EVERY 18 DAYS OF EMPLOYMENT. AN EMPLOYEE WHO DOES 
NOT QUALIFY FOR VACATION SHALL BE PAID PRO RATA ON 
A DAILY BASIS. HOLIDAY SHALL BE COUNTED AS DAYS 
WORKED FOR VACATION BENEFITS.  LEGAL SERVICES FUND: 
EMPLOYER SHALL CONTRIBUTE $.20 TO THE FUND ON THE 
SAME BASIS FOR ALL HOURS PAID TO EMPLOYEES IN THE 
FORM OF HOLIDAY PAY OR VACATION PAY.  IN ADDITION 
TO THE BENEFITS PAID FOR HEALTH-WELFARE AND PENSION 
FOR UP TO 40 HOURS WORKED AN ADDITIONAL $.25 IS 
PAID FOR EACH HOUR WORKED. THE EMPLOYER SHALL GRANT 
3 CALENDAR DAYS OFF WITHOUT LOSS OF PAY TO AN 
EMPLOYEE WHO HAS DEATH IN HIS/HER IMMEDIATE FAMILY, 
INCLUSIVE OF THE DAY OF THE FUNERAL.................$ 49.88                  38.93
TRUCK DRIVERS: GROUP  8 RXS  HAZARDOUS/TOXIC WASTE 
- AN ADDITIONAL 20% OF THE BASIC HOURLY WAGE RATE 
SET FORTH IN THIS WAGE DETERMINATION.  A. PAID 
HOLIDAYS: NE

Source: the U.S. Department of Labor's register of wage determinations, read every week. Federal Bid Alerts is independent; check the wage determination in your solicitation before you bid.