Home / NEW - Air Force Installation and Mission Support Center… / Document

2612 Resilient Facility Prototype Statement of Objectives

Updated

A PDF document (334 KB) attached to NEW - Air Force Installation and Mission Support Center (AFIMSC) Streamlining Procurement for Effective Execution & Delivery (SPEED) Commercial Solutions Opening (CSO), from the Department of the Air Force. Due Aug 29, 2030, 5:00 AM (UTC-5).

File name: 2612_Resilient_Facility Prototype_SOO.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

CUI

DEPARTMENT OF THE AIR FORCE

HEADQUARTERS PACIFIC AIR FORCES (PACAF) & SAF/IE

STATEMENT OF OBJECTIVES (SOO)

RESILIENT EXPEDITIONARY PERMANENT FACILITY

PROTOTYPE DEMONSTRATION

PROGRAM IDENTIFIER: PACAF-ACE-FAC-2026-01

ACQUISITION AUTHORITY: 10 U.S.C. § 4022(i) (Facility and Installation Prototyping Pilot)

PROGRAM RECORD

ACQUISITION & MANAGEMENT DATA

Sponsoring Agency

Department of the Air Force / SAF/IE & HQ

PACAF/A4

Executing Organization

Air Force Installation Contracting Center (AFICC)
/ 647th CONS

Supported Organization

647th Logistics Readiness Squadron (LRS) /
PACAF Civil Engineers

Period of Performance

9 to 12 Months from Prototype Award

Primary Prototype Location

Joint Base Pearl Harbor-Hickam (JBPHH), HI (or
screened PACAF spoke site)

Statutory Pilot Program

Project #1 of 2 authorized Air Force installations
under 10 U.S.C. § 4022(i)

1.0 PURPOSE & OPERATIONAL BACKGROUND

1.1 Purpose

The purpose of this prototype project is to demonstrate and evaluate a rapidly deployable and reconfigurable permanent facility technology capable of supporting Pacific Air Forces (PACAF) operational requirements within a compressed 9 to 12-month prototype period.

1.2 Operational Background

Under the Agile Combat Employment (ACE) operational scheme of maneuver, the Department of the Air Force (DAF) requires rapidly deployable, austere-capable infrastructure across the First and Second Island Chains. Conventional permanent Pre-Engineered Metal Buildings (PEMBs) require lengthy construction timelines (24–36 months), massive concrete civil works, and are non-relocatable once erected. Conversely, commercial expeditionary tents lack the structural rigidity, wind resistance, and atmospheric sealing

CUI

CUI

DEPARTMENT OF THE AIR FORCE

HEADQUARTERS PACIFIC AIR FORCES (PACAF) & SAF/IE

STATEMENT OF OBJECTIVES (SOO)

necessary to withstand typhoons and extreme marine salt-fog corrosion, frequently causing rapid deterioration of Prepositioned War Reserve Materiel (WRM) and weapon systems. This prototype effort evaluates whether modern rapid-manufacturing structural systems can bridge this gap by combining the structural permanence, environmental durability, and building-system integration of a permanent facility with the erection velocity, and modular adaptability of an expeditionary shelter.

2.0 SCOPE OF WORK & DEMONSTRATION BOUNDARIES

2.1 Demonstration Scope

The Participant shall design, engineer, fabricate, stage, transport, erect, commission, operationally demonstrate, and evaluate a prototype facility system in a representative Pacific littoral environment.

The beginning of the document. Download the full file to read on.

Other documents in this bid