Attachment 7: Closed Call AoI As-Built BIM Data Acquisition
Updated
A PDF document (149 KB) attached to NEW - Air Force Installation and Mission Support Center (AFIMSC) Streamlining Procurement for Effective Execution & Delivery (SPEED) Commercial Solutions Opening (CSO), from the Department of the Air Force. Due Aug 29, 2030, 5:00 AM (UTC-5).
File name: Attachment 7_Closed Call AoI_As-Built BIM Data Acquisition.pdf
The full file is for paid members, or buy this bid alone.
Preview
Closed Area of Interest (AoI) for SPEED CSO
1.0 INTRODUCTION
1.1
Issued By
Program Office: Air Force Civil Engineer Center (AFCEC) Contracting Office: 772nd Enterprise Sourcing Squadron
1.2
AoI Identifiers
AoI Title: As-Built Building Information Modeling (BIM) Data Acquisition CSO AoI Number: Closed – 26 – 07. POC: Mr. Charles Kelm AoI Release Date: 03/16/2026
AoI Close Date: 5:00 P.M. (CDT) on 16 April 2026
Responses: See FA890326SC001 for submission instructions in addition to paragraph 8.0 below.
1.3
Purpose
The Air Force Civil Engineer Center (AFCEC) seeks innovative solutions from our industry partners to provide a comprehensive and efficient method for obtaining Air Force as-built Building Information Modeling (BIM) data for the three (3) active-duty Air Force bases in the United States for this Spiral 1 and 2, Kirkland Air Force Base located in Albuquerque New Mexico, Joint Base San (JBSA) being the largest joint base in the Department of War, established by merging three primary locations in Texas: JBSA-Fort Sam Houston, JBSA-Lackland, and JBSA-Randolph., and Wright-Patterson Air Force Base located in Dayton, Ohio. This initiative is in support of the BIM program and Enterprise Information Technology as a Service (EITaaS) initiatives. The initiative will eventually expand to include all buildings and structures across all 57 U.S. bases for the next phase.
2.0 STRATEGIC BACKGROUND
The Air Force is undertaking a significant modernization of its installation infrastructure. A key component of this effort is the creation of high-accuracy, laser-scanned 3D models of existing facilities. As-built BIM data is critical for effective facility life-cycle management, including planning, design, construction, operations, and maintenance. The collected BIM data will be a cornerstone of AFCEC’s digital transformation, enabling enhanced decision-making and improved efficiency. It is imperative that this data is accurate, secure, and readily accessible to support our airmen and the mission.
3.0 PROBLEM STATEMENT
AFCEC requires a standardized and scalable solution to acquire, collect existing data, manage, and utilize as-built BIM data across the Air Force Engineering enterprise. This solution must address the entire data lifecycle, from initial capture to long-term storage and integration with existing Air Force systems. Key challenges that offerors must address include developing a contingency plan for when as-built drawings are unavailable or not in a digital format and outline how the solution will
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment 1: Closed Call AoI CE IT Portfolio Optimization
- Attachment 3: Closed Call AoI BOAR sUAS Framework
- Attachment 4: Closed Call AoI UDK
- Attachment 5: Closed Call AoI Data Science Capability and Framework
- SPEED CSO
- Attachment 2: Closed Call AoI AFCEC Business Systems Modernization
- Attachment 6: Closed Call AoI Data Repository and Dashboard
- Closed 2605 - Responses to Questions v2
- SPEED CSO Rev 1
- Attachment 8: Closed Call AoI BRAC Innovative Approaches Tech and Methodologies
- SPEED CSO Rev 2
- Attachment 10: Closed Call AoI RF Spectrum Monitoring System