PART 1 – GENERAL

1.1 SUMMARY

Work includes selective demolition and removal of the existing exterior secondlevel deck handrailing and steel staircase. Work includes protection of adjacent structures, restoration of affected surfaces, disposal of removed materials, and required documentation.

1.2 REFERENCES

OSHA 29 CFR 1926 – Safety and Health Regulations for Construction. Local building codes, latest adopted edition.

1.3 SUBMITTALS

Written confirmation that all specified components have been removed. Photographs documenting deck and stair connection points after removal. Written report of concealed structural deterioration discovered during demolition, if any.

1.4 SITE PROTECTION AND CONDITIONS

Protect adjacent structures, siding, windows, doors, and landscaping from damage Maintain safe working conditions and provide temporary fall protection when railings or stairs are removed. Contractor shall provide all necessary labor, tools, equipment, and safety measures.

1.5 COORDINATION

Coordinate with Owner for access and safety during demolition operations. Verify existing conditions before beginning removal work.

PART 2 – PRODUCTS

2.1 MATERIALS

• Exteriorgrade wood filler for patching deck fastener holes • Corrosionresistant sealant for exposed metal fastener holes

2.2 EQUIPMENT

Mechanical lifting equipment suitable for safe removal of steel stair assembly. Grinding and sanding tools for smoothing edges and remaining attachment surfaces

PART 3 – EXECUTION

3.1 PREPARATION

Inspect existing deck and stair assembly prior to demolition. Install temporary fall protection prior to removing railings or stair components.

3.2 HANDRAILING REMOVAL

Remove all handrail components: posts, balusters, top and bottom rails, brackets, and fasteners. Cut or extract fasteners flush with deck framing.
Grind or sand any sharp or protruding edges created during removal. Do not cut or damage structural members during removal. Remove and dispose of handrailing materials per Section 3.6

3.3 STEEL STAIRCASE REMOVAL

Remove full stair assembly: stringers, treads, landing platform (if present), posts, and anchorage hardware. Use mechanical lifting equipment where needed for safe removal. Remove anchor bolts, lag screws, weld plates, and brackets. Grind or patch remaining weld tabs, plates, and attachments flush. Install temporary fall protection immediately following removal.

3.4 STRUCTURAL INTERFACE PROTECTION

Inspect rim joist, ledger, and adjacent framing for damage. Notify Owner if any concealed deterioration encountered.