SEQ CHAPTER \h \r 1A.GeneralRefer to submittal register or technical specifications for all submittals required.
When specifically requested by the Government representative, the Contractor shall provide copies of manufacturer's literature containing detailed specifications and performance data or shop drawings fully describing the items and written installation instructions and/or recommendations for review and approval prior to accomplishing equipment installation.
B.Submittal Register:
1.A submittal register, listing all items requiring submittals under this solicitation, is provided as an attachment to this document. The Contractor shall provide all required submittals to the Engineer within 21 days of award except for items noted otherwise on the submittal register.
2. The approval of submittals shall not relieve the contractor to comply with the terms and conditions of the contract drawings and specifications. The contractor shall be responsible to determine correct dimension, design, connection, detail and satisfactory construction of all work.
C. Project Schedule: Contractor shall provide as required by Federal Acquisition Regulation (FAR) clauses. *
Price Breakdown - Lump Sum Items: Contractor shall provide as required by FAR clauses. *
Subcontractor's List
Submit a list of subcontractors who will be working on the project.
F.Submittal of Progress Payment Certificate: Contractor shall provide as required by FAR clauses. *
G.Guarantees, Warranties And Certificates -Refer to Section 01770.
H.Operating And Maintenance Instruction -Refer to Section 01770
I.Delivery Tickets
1.The Contractor shall submit to the Government's on site representative, one legible copy of each delivery ticket for all material delivered to the construction site.
2.The delivery ticket shall show brand name, catalog number, and number of items received.
J. Waste Manifests
The Contractor shall submit copies of all waste manifests.
Manifests shall state type of waste (i.e., construction debris, hazardous asbestos, etc.), location of disposal, landfill designation, EPA registration of landfill, and EPA registration for transportation of any hazardous wastes.
* The applicable FAR clauses will be provided in full text to the resultant contractor at the pre-construction conference.
(END OF SECTION 01330)