National Park Service

Replace Wastewater Plant South Rim Village

GRCA-257282

100% Complete Construction Documents
Addendum 8

Prepared by:

Greenwood Village, CO

-.
0.
3-.2

t
a

e

Jacobs Government Services Company

..
Si
gned .

D

77237

KATARZYNA

ROSINSKI

l
)
vi
Ci
(

.
O

CE

onal
ssi
En
ofe
gi
Pr

CATE

FI
I
N
RT

er
ne

Regi
ste
re
d

October 30, 2026

.
A
A
RI
S.
ZON
A, U.

Task Order No. 140P2023F0235

Expires
Expires

Contract No. 140P2023D0006

12-31-2028

GRCA 257282 – 100% Complete CD: Addendum 08

1.

Addendum Contents

This addendum addresses questions from bidders on the 100% Final Construction Documents for the Replace Wastewater Plant South Rim Village project, dated June 2025, that were received by Jacobs on October 20, 2026. The questions and responses are attached. The questions resulted in minor updates to drawings. Revisions are captured in markup format showing additions in red, deletions in green and notes in blue. Revised documents are listed below and attached. Revised documents will ultimately be incorporated into conformed contract documents after project award.

1.1

Revisions to Drawings

New or
Updated

Sheet No.

DWG No.

Sheet Name

Description

Updated

01G0260

General Power Actuated Valve
Schedule

Revised valve size and deleted valve
FCV-2522

Updated

01G0261

General Self Regulated Valve
Schedule

Addition of ARC-2564A and ARV2564B

Updated

07Y2001

Yard Piping Plan Area 1

Removed process line cleanout

Updated

07Y2003

Yard Piping Plan Area 3

Revised locations of process line
cleanouts

Updated

07Y2004

Yard Piping Plan Area 4

Revised locations of process line
cleanouts

Updated

08E7101

Site Electrical Motor Control
Diagram

Revision to Permeate Pump and VFD
tag numbers to match P&IDs

Updated

09N3204

I&C Disinfection and UV Effluent
Booster Pumps P&ID

Revised UVI lines to PERM

Updated

09N8001

I&C Aerobic Digester Blowers
P&ID

Relocated drain/vent location

Updated

09N8002

I&C Digester System P&ID

Relocated drain/vent location

Updated

25D3004

Process Tanks Mechanical
Sections

Revision to valve types

Updated

32D1020

Process Building Mechanical
Lower Plan

Revision to Backpulse tank and
Permeate Pump tag numbers to match

P&IDs

Updated

32D3001

Process Building Mechanical
Sections

Revision to Backpulse tank and
Permeate Pump tag numbers to match

P&IDs

Updated

32D3002

Process Building Mechanical
Sections

Revision to Permeate Pump tag
number to match P&IDs

Jacobs Engineering Group Inc.