GRCA 257282, Replace South Rim Wastewater Treatment Plant

140P2026R0101 /
Amendment 03/
09.02.2026
Question No.

Sheet or
Reference

Question

Response

Ref. 25S1020 Process Tanks Structural Lower Level Plan; What size are the (2) columns 10’- The columns are W12x45. Callout provided by 0’ North of Line 1?
markupon drawing 25S1020 (attached to Addendum
3).

Ref. 1/25S5001 Moment Connection; The perpendicular beam connections to the column New connection detail and callouts provided for the
web are called out as 0512-020. These beams are not erectable due to the presence of the 3/8” beam to column web connection. Markups provided on stiffeners above and below the beam connection. Please advise. drawings 25S1040 and 25S5001 (attached to
Addendum 3).

Ref. 1/87S1030 “Armor Angles”; What size are the angles? Size and spacing of the headed studs?

Use SST L3x3x¼. Markup provided for drawing
87S1030 (attached to Addendum 3).

Ref. 09 90 00 Painting and Coatings; We assume all structural steel is to be shop primed with Steel roof trusses and monorails shall be shop primed System No. 5 Exposed Metal – Mildly Corrosive other than the steel roof trusses which are to with System No. 4 Exposed Metal – Highly Corrosive. be shop primed with System No. 4 Exposed Metal – Highly Corrosive. Please confirm. All other structural steel shall be shop primed with