Home / Reserve Basin Maintenance Dredging Contract for Sites at… / Document

Amendment 3: Request for Information Responses

Updated

A PDF document (133 KB) attached to Reserve Basin Maintenance Dredging Contract for Sites at the Phildelphia Navy Yard in the Public Works Department Pennsylvania Area of Responsibiliy, from the Department of the Navy. Due Jan 15, 2027, 2:00 PM (UTC-5).

File name: Amendment 0003 RFI Responses.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

N4008526B0002; AMEND0003

6.
Question
#

RFI RESPONSES:

Page

Reference
Section
Paragraph
V-101

Note 2

Question
Please provide survey data, in XYZ
format, for the survey conducted in
November 2023. Also confirm that
this survey is the most recent
conditional survey.
The solicitation states that “One of the
following two disposal sites are
proposed to be utilized..” and lists the
Weeks Marine Whites Rehandling
Basin and the Waste Management
Corporation Biles Island disposal
facility; but mentions that Areas RBA, RB-C AND RB-D can be disposed of at Whites Basin or Biles Island, and
that Area RB-A 7/8 must be disposed
of at Biles Island, which implies that
two sites must be utilized. The plans
contradict this, noting on page V-002
that all project material can be
disposed at Whites Basin, but only
dredge Area A (excluding borings 7
and 8) and the access channel can be
disposed at Biles Island. Please advise
which is correct.
Please provide permits showing
sediments are authorized for disposal
Whites Basin and Biles Island.

Please advise if there is a port security
barrier and if it will remain open 24
hours a day during dredging
operations.

There are numerous QC Specialists
listed in the matrix with missing data
for area of responsibility and
frequency required on site. Please
advise which is applicable.

Government Response
November 2023 is the most
current bathymetric survey
available. XYZ file to be
provided.

All Material from Area RB-A
7/8 shall be disposed at Biles
Island.

Permit provided with
Amendment 0003.
Reserve basin and access
channel will accessible 24/7.
The contractor shall be
responsible to coordinate
openings of the 26th Street
drawbridge with the bridge
operator.
Replace the entire
Specification SECTION 01 45

00 with the attached revised

SECTION 01 45 00 dated 0811-2026.
The QC Manager must be an
individual with a minimum of
[5] years combined experience
in the following positions:
Project Superintendent, QC
Manager, Project Manager,
Project Engineer or
Construction Manager on
similar size and type
construction Contracts which
included the major trades that

N4008526B0002; AMEND0003

Please advise if the Underwater QC
Team is applicable to this contract.
Please advise if the Fire Protection QC
Specialist is applicable to this
contract.
Regarding the 15 KV Power Line –

The beginning of the document. Download the full file to read on.

Other documents in this bid