GRCA 257282, Replace South Rim Wastewater Treatment Plant
140P2026R0101 /
Amendment 05/
09.17.2026
Question No.
Sheet or
Reference
Question
Response
Ref. 25S1020 Process Tanks Structural Lower Level Plan; What size are the (2) The columns are W12x45. Callout provided by markupon drawing 25S1020 (attached to Addendum 3). columns 10’-0’ North of Line 1?
New connection detail and callouts provided for the beam to column web connection. Markups provided on drawings 25S1040 and Ref. 1/25S5001 Moment Connection; The perpendicular beam connections to the 25S5001 (attached to Addendum 3).
column web are called out as 0512-020. These beams are not erectable due to the presence of the 3/8” stiffeners above and below the beam connection. Please advise. Ref. 1/87S1030 “Armor Angles”; What size are the angles? Size and spacing of the Use SST L3x3x¼. Markup provided for drawing 87S1030 (attached to Addendum 3). headed studs?
Steel roof trusses and monorails shall be shop primed with System No. 4 Exposed Metal – Highly Corrosive. All other structural steel Ref. 09 90 00 Painting and Coatings; We assume all structural steel is to be shop shall be shop primed with System No. 5 Exposed Metal – Mildly Corrosive. Refer to Addendum 3. primed with System No. 5 Exposed Metal – Mildly Corrosive other than the steel roof trusses which are to be shop primed with System No. 4 Exposed Metal – Highly Corrosive. Please confirm.
Do to large file size, CAD files will be provided after award. Are CAD (electronic) files available for the Water Treatment Plant site grading plans ( original ground topography, final grade, top of pavement etc.)? Are CAD (electronic files) available for the Access Road? Are CAD (electronic) files available for underground pipe and utilities? If so, please provide. The PDF file of the specifications is "protected" making it difficult to use. Please Yes. Refer to the zip file called "GRCA_Final_Individual_Specs". provide an un-protected version for contractor use.
This question will be answered in an upcoming amendment. Regarding the Contractor Laydown Area, please provide location of Contractor Laydown Area (8-acre site). Confirm if the site has crushed aggregate surfacing, fences and gates already installed by others. Is temporary power, water, SS available on the site?
01 50 00 Temp Facilities states Potable water service is available for use. Where is the water source located? What is the rate of water that can be provided?
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment 6: Wage Determination
- Attachment 8: Solit PSP Vol I Exp REQD
- Attachment 9: Solit PSP Vol I PastPerf REQD
- Attachment 11: Solit PSP Vol II Equals
- Attachment 13: Solit PSP Vol II SubKPlan REQD RELEASED v2 Mar25
- GRCA Solicitation Form (SF 1442) and Clauses
- Sol
- Amendment 1: Access Road 100P CD Specifications 01
- Amendment 1: Amendment Form (SF 30) 01
- Sol Amendment 01
- Amendment 2: GRCA Precon SignIn 0002
- Amendment 2: GRCA SR WWTP PreBid Mtg presentation 0002