Amendment 5: FinalCD Addendum 02 SCADA wSeal 0005
Updated
A PDF document (5.8 MB) attached to GRCA 257282 - Replace Wastewater Plant at South Ri, from the National Park Service. Due Nov 18, 2026, 1:00 PM (UTC-7).
File name: B09_Amendment_05_GRCA257282_FinalCD_Addendum_02_SCADA_wSeal_0005.pdf
The full file is for paid members, or buy this bid alone.
Preview
National Park Service
Replace Wastewater Plant South Rim Village
GRCA-257282
100% Complete Construction Documents
Addendum 2
September 8, 2026
Jacobs Government Services Company
20.
.
2.
t
a
..
Si
gned .
e
D
77237
KATARZYNA
ROSINSKI
.
A
A
RI
S.
ZON
A, U.
Expires
Expires
12-31-2028
Greenwood Village, CO
l
)
vi
Ci
(
.
O
CE
onal
ssi
En
ofe
gi
Pr
C
I
F
I ATE N
RT
er
ne
Regi
ste
re
d
Prepared by:
Contract No. 140P2023D0006
Task Order No. 140P2023F0235
GRCA 257282 – 100% Complete CD: Addendum 02
1.
Addendum Contents
This addendum addresses comments from the SCADA review of the 100% Final Construction Documents for the Replace Wastewater Plant South Rim Village project, dated June 2025, which was completed by HDR. The comments form and responses to comments have been transmitted to NPS separately. The comments resulted in minor updates to drawings, specifications and standard details. Revised documents are listed below and attached. Revisions are captured in markup format showing additions in red, deletions in green and notes in blue. Revised documents are listed below and attached. Revised documents will ultimately be incorporated into conformed contract documents after project award.
1.1
Revisions to Drawings
New or
Updated
Sheet No.
DWG No.
Sheet Name
Description
Updated
01N0001
Instrument and Control
Legend Sheet
Updated
09N0002
Instrument and Control
Facility 10 Network Diagram
Updated
09N0003
Instrument and Control
Facility 20 Network Diagram
Updated
09N0004
Instrument and Control
Facility 80 Network Diagram
Updated
09N0005
Instrument and Control
Facility 32 Network Diagram
Updated
09N0006
Instrument and Control
Facility 32 MCC Network Diagram
Updated
09N0007
Instrument and Control
Facility 12 Network Diagram
Updated
09N0100
Instrument and Control
Facility 10 Server Rack Layout
Updated
09N0101
Instrument and Control
Facility 20 PLC Panel Layout
Updated
09N0102
Instrument and Control
Facility 32 PLC Panel Layout
Updated
09N0103
Instrument and Control
Facility 80 PLC Panel Layout
Updated
09N0104
Instrument and Control
Facility 12 Network Interface Panel
1.2
New or
Updated
Revisions to Standard Details
Standard
Detail No.
Name
Description
None
Jacobs Engineering Group Inc.
GRCA 257282 – 100% Complete CD: Addendum 02
1.3
Revisions to Specifications
New or
Updated
Specification
No.
Name
Description
Updated
01 11 00I
Summary of Work
Addes paragraph 1.15 System Integration Roles
Updated
01 81 33
Cyber Security
Requirements
Added paragraph 2.01 A requiring NPS provided
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment 6: Wage Determination
- Attachment 8: Solit PSP Vol I Exp REQD
- Attachment 9: Solit PSP Vol I PastPerf REQD
- Attachment 11: Solit PSP Vol II Equals
- Attachment 13: Solit PSP Vol II SubKPlan REQD RELEASED v2 Mar25
- GRCA Solicitation Form (SF 1442) and Clauses
- Sol
- Amendment 1: Access Road 100P CD Specifications 01
- Amendment 1: Amendment Form (SF 30) 01
- Sol Amendment 01
- Amendment 2: GRCA Precon SignIn 0002
- Amendment 2: GRCA SR WWTP PreBid Mtg presentation 0002