Appendix I - SF1413-13d
Updated
A PDF document (578 KB) attached to RFP SC-27-723 Hazardous & Flammable Gas Cabinets and Install, from the Department of Energy. Due Jan 8, 2027, 4:00 PM (UTC-6).
File name: Appendix I - SF1413-13d.pdf
The full file is for paid members, or buy this bid alone.
Preview
OMB Control Number: 9000-0014
Expiration Date: 1/31/2021
Paperwork Reduction Act Statement - This information collection meets the requirements of 44 U.S.C. § 3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number. The OMB control number for this collection is 9000-0014. We estimate that it will take .05 hours to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: U.S. General Services Administration, Regulatory Secretariat Division (M1V1CB), 1800 F Street, NW, Washington, DC 20405.
STATEMENT AND ACKNOWLEDGMENT
PART I - STATEMENT OF PRIME CONTRACTOR
2. DATE SUBCONTRACT
AWARDED
1. PRIME CONTRACT NUMBER
DE-AC02-07CH11358
3. SUBCONTRACT NUMBER
SC-27-723
4. PRIME CONTRACTOR
5. SUBCONTRACTOR
a. NAME
a. NAME
Ames Laboratory
b. STREET ADDRESS
b. STREET ADDRESS
2408 Pammel Drive, 231 TASF
c. CITY
d. STATE e. ZIP CODE
Ames
6. The prime contract
does,
Overtime Compensation."
IA
c. CITY
d. STATE e. ZIP CODE
50011-1015
does not contain the clause entitled "Contract Work Hours and Safety Standards Act --
7. The prime contractor states that under the contract shown in Item 1, a subcontract was awarded on the date shown in Item 2 to the subcontractor identified in item 5 by the following firm:
a. NAME OF AWARDING FIRM
Ames Laboratory
b. DESCRIPTION OF WORK BY SUBCONTRACTOR
Hazardous & Flammable Gas Storage Cabinets procure and install in three Ames National Laboratory buildings. (Metals Development, Harley Wilhelm Hall and Spedding Hall)
8. PROJECT
SC-27-723
10a. NAME OF PERSON SIGNING
9. LOCATION
Ames Laboratory, Ames, IA/Iowa State University
11. BY (Signature)
12. DATE SIGNED
Andrew Saxton
10b. TITLE OF PERSON SIGNING
Sr. Contract Manager
PART II - ACKNOWLEDGMENT OF SUBCONTRACTOR
13. The subcontractor acknowledges that the following clauses of the contract shown in Item 1 are included in this subcontract: Construction Wage Rate Requirements
Contract Work Hours and Safety Standards Act - Overtime Compensation Apprentices and Trainees
(If included in prime contract see Block 6)
Compliance with Copeland Act Requirements
Payrolls and Basic Records
Subcontracts (Labor Standards)
Withholding of Funds
Contract Termination - Debarment
Disputes Concerning Labor Standards
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Appendix A - Terms and Conditions for FP Construction
- Appendix A1 - ESH Ts and Cs - Sept. 5, 2024
- Appendix C - Contractor Safety and Quality Assurance Information Questionnaire
- Appendix D - Construction requiring delivery of data
- Appendix E - Story County Wage Determination dated
- Appendix F - Hazardous Gas Cabinet Project Safety Requirements and Deliverables
- Appendix G - Affirmation and Certification of Subcontract Terms and Conditions
- Appendix H - Reps and Certs Supplemental
- Appendix J - Proposal Form
- Gas Cabinet Installation - Spedding Hall Drawings
- Gas Cabinet Installation - Metals Development Drawings
- Gas Cabinet Installation - Project Manual