Gas Cabinet Installation - Spedding Hall Drawings
Updated
A PDF document (6.7 MB) attached to RFP SC-27-723 Hazardous & Flammable Gas Cabinets and Install, from the Department of Energy. Due Jan 8, 2027, 4:00 PM (UTC-6).
File name: SC-27-723 Gas Cabinet Installation - Spedding Hall DWGs.pdf
The full file is for paid members, or buy this bid alone.
Preview
General Notes
8.
T
EC
A0.0
A2.0
A2.1
PR
E
D
A2.2
A2.3
A2.4
A2.5
A2.6
A2.7
A2.8
A2.9
A2.10
515 292 6075 Phone
515 292 6370 Fax
[email protected]
A2.11
www.rmharchitects.com
I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT WAS
PREPARED BY ME OR UNDER MY DIRECT PERONSAL
SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL
ENGINEER UNDER THE LAWS OF THE STATE OF IOWA.
OFE S S I O N A L
CLINTON
ROGER
RABE
CLINTON ROGER RABE, PE
REG. NO. P19481
P19481
MY LICENSE RENEWAL DATE IS
DATE:
Project Number
25011
DECEMBER 31, 2026
PAGES OR SHEETS COVERED BY THIS SEAL:
I O WA
ALL MECHANICAL AND PLUMBING SHEETS
Print Record
ISSUE SET
PR
I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT WAS
PREPARED BY ME OR UNDER MY DIRECT PERONSAL
SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL
ENGINEER UNDER THE LAWS OF THE STATE OF IOWA.
OFE S S I O N A L
E
D
E
STANGE RD
WINLOCK RD
WOI RD
7.
IT
Date
11/16/2026
Revision Record
I
NG
TIMOTHY
A
HILTON
ER
NE
BISSELL RD
TASF
6.
E D A R CH
ER
NE
N UNIVERSITY BLVD
5.
Jeffrey S. Harris
License number: 3594
My license renewal date is: June 30, 2028
Pages or sheets covered by this seal:
1615 Golden Aspen Drive
Suite 110
Ames, Iowa 50010
I
NG
PAMMEL DR
PROJECT LOCATION
GENERAL SCHEDULING REQUIREMENTS
•
NORMAL HOURS OF OPERATION ARE 7:30 AM TO 4:30 PM,
MONDAY THROUGH FRIDAY.
•
NOTIFY OWNER NOT LESS THAN THE FOLLOWING IN ADVANCE
OF ACTIVITIES THAT WILL AFFECT OWNER'S OPERATIONS:
1.
NO LESS THAN TWO (2) MONTHS AHEAD OF
SCHEDULED ACTIVITY, PROVIDE ACCURACRY WITHIN
ONE (1) WEEK.
2.
NO LESS THAT TWO (2) WEEKS AHEAD OF SCHEDULED
ACTIVITY, PROVIDE ACCURACT WITHIN ONE (1) DAY.
•
FIRE SUPPRESSION SHUTDOWN
1.
ALLOWABLE SHUTDOWN DURING NORMAL WORKING
HOURS
2.
MAXIMUM CONTINUOUS DURATION = 8 HOURS
•
MECHANICAL EXHAUST SHUTDOWN
1.
ALLOWABLE SHUTDOWN DURING NORMAL WORKING
HOURS
2.
MAXIMUM CONTINUOUS DURATION = 4 HOURS
•
PENETRATION PERMIT
•
10-15 DAYS FOR APPROVAL
•
NON-CITIZEN WORKER REVIEW PROCESS
•
45 DAYS FOR REVIEW/APPROVAL
4.
NS
L IC
EN
S
CONTRACTOR TO PURCHASE PARKING PASSES AND
UTILIZE HIGHLIGHTED LOT
DR
MORRILL RD N
ER
S
LOT 29
OS
CE
KO
3.
3594
IOWA
LI
LOT 29
CONTRACTOR PARKING AREA
RI
2.
I hereby certify that the portion of this technical submission described below was prepared by me or under my direct
supervision and responsible charge. I am a duly licensed architect under the laws of the state of Iowa.
S. H
EY
AR
R
F
F
PROJECT SITE LOCATION
Prior to excavation and site planting on the job site, the contractor shall contact utility companies to locate underground utilities effecting the excavations and
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Appendix A - Terms and Conditions for FP Construction
- Appendix A1 - ESH Ts and Cs - Sept. 5, 2024
- Appendix C - Contractor Safety and Quality Assurance Information Questionnaire
- Appendix D - Construction requiring delivery of data
- Appendix E - Story County Wage Determination dated
- Appendix F - Hazardous Gas Cabinet Project Safety Requirements and Deliverables
- Appendix G - Affirmation and Certification of Subcontract Terms and Conditions
- Appendix H - Reps and Certs Supplemental
- Appendix I - SF1413-13d
- Appendix J - Proposal Form
- Gas Cabinet Installation - Metals Development Drawings
- Gas Cabinet Installation - Project Manual