Home / RFP SC-27-723 Hazardous & Flammable Gas Cabinets and Install / Document

Gas Cabinet Installation - Project Manual

Updated

A PDF document (1.6 MB) attached to RFP SC-27-723 Hazardous & Flammable Gas Cabinets and Install, from the Department of Energy. Due Jan 8, 2027, 4:00 PM (UTC-6).

File name: SC-27-723 Gas Cabinet Installation - Project Manual (2).pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Volume 1&2
Project Manual
General Construction & Mechanical/Electrical Construction Issued 11/16/2026
Project Title

SC-27-723 Ames National Laboratory
Hazardous & Flammable Gas Cabinet
Installation
2408 Pammel Dr, Ames, IA 50011

Owner

Architect

Mechanical &
Electrical Engineer

Ames National Laboratory
2408 Pammel Dr
Ames, IA 50011
(515) 294-3483
Roseland Mackey Harris Architects PC
1615 Golden Aspen Drive, Suite 110
Ames, Iowa 50010
(515) 292-6075
Resource Consulting Engineers LLC
301 Alexander Ave Suite C
Ames, IA 50010
(515) 292-2500

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 0107

SEALS PAGE

00 1000

PROCUREMENT AND CONTRACTING REQUIREMENTS

00 2000

SUPPLEMENTARY CONDITIONS

00 3000

SPECIAL CONDITIONS

00 4100

BID FORM

DIVISION 01 - GENERAL REQUIREMENTS

01 1000

PROJECT REQUIREMENTS

01 2000

PRICE AND PAYMENT PROCEDURES

01 2300

ALTERNATES

01 3300

SUBMITTAL PROCEDURES

01 4000

QUALITY REQUIREMENTS

01 5000

TEMPORARY FACILITIES AND CONTROLS

01 6000

PRODUCT REQUIREMENTS

01 7300

EXECUTION

01 7329

CUTTING AND PATCHING

01 7419

CONSTRUCTION WASTE MANAGEMENT

01 7700

CLOSEOUT PROCEDURES

01 7800

CLOSEOUT SUBMITTALS

01 7839

PROJECT RECORD DOCUMENTS

01 7900

START-UP, DEMONSTRATION AND TRAINING

DIVISION 02 - EXISTING CONDITIONS

02 4050

SELECTIVE DEMOLITION

DIVISION 04 - MASONRY

04 2000

UNIT MASONRY

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 1000

ROUGH CARPENTRY

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 8400

FIRESTOPPING

07 9200

JOINT SEALANTS

DIVISION 08 - OPENINGS

08 1113

HOLLOW METAL DOORS AND FRAMES

08 7100

DOOR HARDWARE

08 8813

FIRE-RATED GLAZING

DIVISION 09 - FINISHES

09 2116

GYPSUM BOARD ASSEMBLIES

09 5100

ACOUSTICAL CEILINGS

09 9123

INTERIOR PAINTING

SC-27-723 Ames National
Laboratory Hazardous &
Flammable Gas Cabinet
Installation

11/16/2026

DIVISION 11 - EQUIPMENT

11 5300

LABORATORY EQUIPMENT

SC-27-723 Ames National
Laboratory Hazardous &
Flammable Gas Cabinet
Installation

11/16/2026

SECTION 00 0110

SPECIFICATIONS

1.01 DIVISION 21 -- FIRE SUPPRESSION

A.

21 0500 - Common Work Results for Fire Suppression

B.

21 0523 - General-Duty Valves for Water-Based Fire-Suppression Piping

C.

21 0553 - Identification for Fire Suppression Piping and Equipment

D.

21 1300 - Fire-Suppression Sprinkler Systems

1.02 DIVISION 22 -- PLUMBING

A.

22 1005 - Plumbing Piping

1.03 DIVISION 23 -- HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)

A.

23 0593 - Testing, Adjusting, and Balancing for HVAC

B.

23 3100 - HVAC Ducts and Casings

C.

23 3300 - Air Duct Accessories

D.

23 3600 - Air Terminal Units

The beginning of the document. Download the full file to read on.

Other documents in this bid