Home / Vertical Transportation Equipment (VTE) / Document

Atch 3 NCIC Base Access

Updated

A PDF document (2.2 MB) attached to Vertical Transportation Equipment (VTE), from the Department of the Air Force. Due Nov 12, 2026, 11:11 AM (UTC-7).

File name: Atch 3 NCIC Base Access 8May26_27Q0006.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Solicitation: FA480127Q0006

Contract #:

Base Access/Contractor Background Checks Inquiry (December 2015) 1. Base access waiver request and instructions documents (Appeal Process/Instruction): If an individual contractor was denied installation access as a result of an unfavorable background check and cross referenced with the attached matrix, the individual and contractor are advised that the individual in question, has received an unfavorable background check and that the information in the check cannot be released outside of Law Enforcement agencies. They are then advised how to obtain information concerning their record and the appeal process and provided written step-by-step instructions on how to do same.
The process is as follows; if past criminal history is unknown: The individual must send a written request to the Federal Bureau of Investigations, Criminal Justice Information Services Division and attach an $18.00 check. Additionally, they must submit a complete set of (rolled inked fingerprint impressions), with name, date, and place of birth which can be obtained from the local police departments. Once the individual receives the information pertaining to their background from the FBI, they must then submit a letter of memorandum explaining the negative information identified in the background check and justification as to why the decision to be denied access should be reconsidered. Furthermore, a character reference letter will be required by their immediate supervisor along with a letter from the sponsoring unit commander requesting the contractor employee be authorized access. 2. Procedures for contractors to submit access requests for pre-approval (prior to work): Contractors are able to proceed with contractor employee installation access paperwork when given the order to proceed at the final preconstruction meeting. The final preconstruction meeting occurs 14-30 days prior to the project start date. At that time, the contractor is provided all the paperwork and instructions required for their employees to be granted installation access. The background checks are then completed by Holloman AFB (HAFB) Security Forces (SF). The background checks are completed an average of 3 business days upon receipt but will not exceed 5 business days. Contractors will re-submit and vetting reaccomplished at least every 12 months for the duration of the specified contract. Contracting units (CONS/MICC) ensure contractors are aware of the 49 WG contractor vetting requirements and the

The beginning of the document. Download the full file to read on.

Other documents in this bid