Att - Geotechnical Report HAVO Rehabilitate Water Treatment System
Updated
A PDF document (14.2 MB) attached to HAVO 326181 Rehabilitate Rainshed&Water Treatment, from the National Park Service. Due Nov 6, 2026, 4:00 PM (UTC-10).
File name: B08_Att_(4)_2025_01_02_-_Geotechnical_Report_HAVO_Rehabilitate_Water_Treatment_System.pdf
The full file is for paid members, or buy this bid alone.
Preview
Geotechnical Engineering Report
Task Order 140P2024F0173 Rehabilitate Water Treatment System Hawaii Volcanoes National Park, Hawaii Island, HI
Prepared for:
Otak, Inc.
11241 Willows Rd NE, Suite 200
Redmond, WA 98052
Prepared by:
Masa Fujioka & Associates
98-021 Kamehameha Highway, Suite 337
Aiea, HI 96701
Version: FINAL
January 2, 2025
MFA Project No. 23732-003
2.1
3.1
5.1
6.1
Geotechnical Engineering Report
Task Order 140P2024F0173 Rehabilitate Water Treatment System MFA Project No. 23732-003
January 2, 2025
Page i
7.1
7.2.1
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Att HAVO 26-0908 Project Specifications
- Att Solit PSP Vol II SubKPlan
- Att Hazardous Material Survey HAVO Rainshed Enviroquest
- Att - Geotechnical Data Report - HAVO Rainsheds Shear Wave Velocity Survey
- Att HAER Drawings HAVO Rainshed
- Att HAER HAVO Water Collection System report
- Att HAVO Construction Phasing Memo
- Att Redwood Water Tanks Trip Rpt and Prelim Treat Recs 2018
- Sol
- Att HAVO - Site Walk Requirements 0001
- Sol Amendment 0001
- Sol Amendment 0002