Attachment 1 - 668-24-108 Construction Statement of Work R2
Updated
A Word document (46 KB) attached to Repair Sanitary Waste Piping at the Mann-Grandstaff VA Medical Center, from the Department of Veterans Affairs. Due Dec 2, 2026, 9:00 AM (UTC-8).
File name: Attachment 1 - 668-24-108 Construction SOW R2.docx
The full file is for paid members, or buy this bid alone.
Preview
STATEMENT OF WORK FOR CONSTRUCTION SERVICES
Mann-Grandstaff VA Medical Center (VAMC)
Spokane, WA
August 26, 2026
Contract Title. 668-24-108 Repair Sanitary Waste Piping Building 1
General.
The Mann-Grandstaff VA Medical Center, Spokane, WA requires labor, materials, and equipment for the replacement of drainage and vent piping serving drinking fountains located in Building 1 (Main Hospital). Scope of work is indicated below.
Scope.
This project will repair and replace the vertical piping riser that serves the Building 1 drinking fountain drains. Access to the multi-story drinking fountain piping chase will be through existing access panels, removal of existing drinking fountain and water coolers, and penetration of walls where new fixtures are to be mounted. The project will remove Asbestos Containing Materials (ACM) piping and fitting wrap insulation that interferes with demolishing piping and remediate friable ACM from accessible surfaces. Lead containing paint and glazed block will need to be remediated or removed. Replace soil piping, fittings, and branches to fixtures. Pipe replacement includes new piping, connections, and any other new components/details necessary to provide service to new ADA/ABAAS compliant bottle-fill semi-recessed water cooler fixtures. Provide new electrical circuits needed to power new refrigerated water cooler fixtures. Repair wall finishes as necessary to restore existing wall surfaces. Contractor shall provide all supervision, labor, tools and materials, installation, programming, startup, training, O&M documentation and one-year warranty of materials and installation. Contractor shall do a field verification to ensure all equipment, parts and materials are identified and verify all the existing conditions.
The contractor shall provide a qualified manufacturer’s representative to check complete installation for conformance to manufacturer’s recommendation, to place the system into service, to make all adjustments required for full conformance to design and specified requirements and to perform all demonstrations and testing. An operating test shall be run in the presence of the Contracting Officer’s Representative (COR). The contractor shall provide demonstrations and training to VA personnel. The contractor shall verify locations for space requirements.
Deliverables:
Inspection, testing documents and manuals and warranty documents per Specifications. Performance Monitoring
The COR will evaluate all work and testing performed. Items must be in a clean state and in proper working condition.
The beginning of the document. Download the full file to read on.