C002
GENERAL DEMOLITION PLAN NOTES
C
C002A
EXISTING
WINDOW
O
A.
PRIOR TO CUTTING WALLS PERFORM A GPR WALL SCAN.
ADJUST THE LAYOUT AS NEEDED FOR INSTALLATION OF A
COMPLETE SYSTEM.
A
A
B.
C
O
SEE TYPICAL FIRE PROOF FLOOR PENETRATION DETAIL ON
SHEET AE400 MODIFY AS NEEDED AT EACH CHASE FLOOR
PENETRATION. INSTALL NEW U.L. APPROVED 3 HOUR RATED
FIRE SLEEVES ON ALL NEW AND EXISTING PIPE PENETRATION.
INSTALL FIRE LABELS AT PIPE AS WELL AS ON THE VISIBLE
CHASE WALL.
A010
A106
C
A108
A209A
DOWN
O
A105
D
D
AE200
C
PLAN NOTES
O
A213
C
O
1. SUPPLY NEW BOTTLE FILL STATION SEE DETAIL 4 /AE400
A214
A113
2. RETURN DRYWALL ON PLASTER ON CLAY TILE OR METAL
FRAMING WALL BACK TO ORIGINAL CONDITIONS.
B
A009
B
C003A
C001
BASEMENT FLOOR PLAN
AE100
1/4" - 1'-0"
C
A008
AE100
AE201
AE202
FIRST FLOOR PLAN
AE100
1/4" - 1'-0"
4.EXTENT SW PROMAR 200 PAINTING OF EXISTING PAINTED
WALL SURFACES PREPARE, PRIME AND TWO COLOR
COATS CORNER TO CORNER MATCH EXISTING COLOR.
5. DOORS FRAMES REMOVE ANY HOLES AND DEFECTS
FOLLOW AN APPROVED LEAD SAFE PROGRAM. PREPARE,
PRIME AND APPLY TWO COLOR COATS OF URETHANE
BASED EXTERIOR ENAMEL PAINT.
SECOND FLOOR PLAN
1/4" - 1'-0"
6.EXISTING PAINTED DOORS, REMOVE HARDWARE REPAIR
ANY DEFECTS FOLLOW AN APPROVED LEAD SAFE
PROGRAM, SAND AND PREPARE DOORS FOR TWO COATS
OF URETHANE EXTERIOR ENAMEL MATCH EXISTING
FINISH.
EXISTING
WINDOW
O
7. EPOXY COAT FLOOR 12" WIDER THAN STATION, EXTEND
EPOXY GRAY FLOOR 60" FROM FACE OF STATION AND
EXTEND PAINT TO WALL BEHIND STATION. APPLY
SAFETY YELLOW 4" WIDE STRIPE AND 45 DEGREE HATCH
PATTERN FULL WIDTH OF STATION AND EXTEND OUT 48"
IN FRONT OF STATION.
C302B
C
DOWN
DOWN
C
C
O
C500
C404
C302A
8. PANEL 9N1 SEE ELECTRICAL DESIGN
C502
C402
WEST POINT ENGINEERS ENGINEERING DISCLAIMER:
DURING ON-SITE FIELD INVESTIGATION WEST POINT ENGINEERS (WPE) OBSERVED
POTENTIAL DEFICIENCIES IN THE WALL SECTIONS AND DOOR FRAMES WITHIN THE PROJECT
AREA. THE VA HAS BEEN NOTIFIED BY WPE OF THESE EXISTING CONDITIONS. THE
DEPARTMENT OF VETERANS AFFAIRS HAS ELECTED TO PROCEED WITH THE CONTRACTED
SCOPE OF WORK, INCLUDING WALL PENETRATIONS FOR ASBESTOS ABATEMENT NECESSARY
FOR THE REPLACEMENT AND INSTALLATION OF THE NEW SANITARY PIPE AND BOTTLE FILL
STATIONS, WITHOUT COMPREHENSIVE REMEDIATION OF IDENTIFIED DEFICIENCIES.
CONTRACTOR SHALL NOTIFY THE VA COR IF CONDITIONS ARE UNSUITABLE FOR
CONSTRUCTION AT THE PRE-CONSTRUCTION MEETING REQUIRED BY THE VA TIL
SPECIFICATIONS.
D
AE100
AE203
AE204
AE205
THIRD FLOOR PLAN
AE100
1/4" - 1'-0"
FOURTH FLOOR PLAN
1/4" - 1'-0"
D
FIFTH FLOOR PLAN
AE100
EXISTING
WINDOW
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment 1 - 668-24-108 Construction Statement of Work R2
- Attachment 2.1 668-24-108 Drawings
- Attachment 2.3 668-24-108 Drawings
- Attachment 3 668-24-108 Bid Set Specifications
- Attachment 4 668-24-108 PCRA
- Attachment 5 668-24-108 DESIGN NARRATIVE
- Attachment 8 - 668-24-108 - Past Performance Questionnaire
- Solicitation