NOTE: NOT ALL NOTES ARE USED ON EACH SHEET
A
GENERAL DEMOLITION PLAN NOTES
DEMOLITION PLAN NOTES
GENERAL NEW WORK PLAN NOTES
A)
1.
EXISTING - GLAZED BRICK WALL WITH INTEGRAL COVE
BASE.
A)
2.
EXISTING - PLASTER WALL OR CLAY BLOCK REMOVE AS
NEEDED TO FIT THE APPROVED BOTTLE FILL STATION AND
FRAMING. SEE DETAIL 4/AE400.
FILL ALL EXISTING CLAY TILE / BRICK OR BLOCK
CAVITIES NOT ASSIGNED TO REMAIN OPEN WITH
NEW MATCHING CMU GROUTED SOLID.
CONCRETE
DECK TYPE:
B)
2'- 8"
SEE DEMOLITION NOTES DETAIL 1/AE400
FLOOR TO DECK DEMOLITION IS REQUIRED
USE POINT OF CONTACT DUST COLLECTION TO A
HEPA APPROVED VACUUM FOR ALL DUST
PRODUCING TOOLS.
C)
SUSPENDED ACOUSTICAL CEILING
CEILING TYPE:
WEST POINT ENGINEERS ENGINEERING DISCLAIMER:
DURING ON-SITE FIELD INVESTIGATION WEST POINT ENGINEERS (WPE) OBSERVED
POTENTIAL DEFICIENCIES IN THE WALL SECTIONS AND DOOR FRAMES WITHIN THE PROJECT
AREA. THE VA HAS BEEN NOTIFIED BY WPE OF THESE EXISTING CONDITIONS. THE
DEPARTMENT OF VETERANS AFFAIRS HAS ELECTED TO PROCEED WITH THE CONTRACTED
SCOPE OF WORK, INCLUDING WALL PENETRATIONS FOR ASBESTOS ABATEMENT NECESSARY
FOR THE REPLACEMENT AND INSTALLATION OF THE NEW SANITARY PIPE AND BOTTLE FILL
STATIONS, WITHOUT COMPREHENSIVE REMEDIATION OF IDENTIFIED DEFICIENCIES.
CONTRACTOR SHALL NOTIFY THE VA COR IF CONDITIONS ARE UNSUITABLE FOR
CONSTRUCTION AT THE PRE-CONSTRUCTION MEETING REQUIRED BY THE VA TIL
SPECIFICATIONS.
DRYWALL
WALL TYPE:
8'- 0"
EGRESS
DOOR
STAIRWELL 1
WOOD
B
7'- 0"
STEEL
D)
E)
USE POINT OF CONTACT DUST COLLECTION TO A HEPA
APPROVED VACUUM FOR ALL DUST PRODUCING TOOLS.
4.
EXISTING - METAL BLANK OFF PLATE REMOVE AND FILL
WITH NEW CMU. SEE DETAIL 1/AE400.
FOLLOW APPROVED ACM ABATEMENT PRACTICES
SEE SHEET HA100.
5.
EXISTING - PLASTIC BUMPER RAIL. RETAIN AND CLEAN FOR
REUSE IF UNDAMAGED.
1.
SEE DETAIL SHEET 4/AE400
FOLLOW APPROVED LEAD BASED PAINT
MANAGEMENT / ABATEMENT PRACTICES WHEN IN
CONTACT WITH LEAD PAINT ON PLASTER WALLS,
DOORS AND FRAMES. SEE SHEET HA100.
6.
EXISTING - PLASTIC HAND RAIL. RETAIN AND CLEAN FOR
REUSE IF UNDAMAGED.
2.
FILL CHASE CAVITY SEE TYPICAL FIRE PROOF FLOOR
PENETRATION ON SHEET AE400.
EXISTING - PLASTIC WALL FINISH. RETAIN AND CLEAN FOR
REUSE IF UNDAMAGED.
3.
SEE PLUMBING PLANS FOR NEW PIPE INSULATION.
EXISTING - PLASTIC CORNER GUARD. RETAIN AND CLEAN
FOR REUSE IF UNDAMAGED.
4.
NEW 12GA FRAMING WITH UNISTRUT SUPPORTS. SEE
DETAIL 4/AE400
9.
EXISTING - STEEL CORNER GUARD COVERED IN PLASTIC TO
REMAIN. RETAIN AND CLEAN FOR REUSE IF UNDAMAGED.
5.
NOT USED
6.
10.
EXISTING - STEEL HAND RAIL. RETAIN AND CLEAN FOR
REUSE IF UNDAMAGED.
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment 1 - 668-24-108 Construction Statement of Work R2
- Attachment 2.1 668-24-108 Drawings
- Attachment 2.2 668-24-108 Drawings
- Attachment 3 668-24-108 Bid Set Specifications
- Attachment 4 668-24-108 PCRA
- Attachment 5 668-24-108 DESIGN NARRATIVE
- Attachment 8 - 668-24-108 - Past Performance Questionnaire
- Solicitation