Attachment 2.3 668-24-108 Drawings

Updated

A PDF document (23.7 MB) attached to Repair Sanitary Waste Piping at the Mann-Grandstaff VA Medical Center, from the Department of Veterans Affairs. Due Dec 2, 2026, 9:00 AM (UTC-8).

File name: Attachment 2.3 668-24-108 Drawings.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

NOTE: NOT ALL NOTES ARE USED ON EACH SHEET

A

GENERAL DEMOLITION PLAN NOTES

DEMOLITION PLAN NOTES

GENERAL NEW WORK PLAN NOTES

A)

1.

EXISTING - GLAZED BRICK WALL WITH INTEGRAL COVE

BASE.

A)

2.

EXISTING - PLASTER WALL OR CLAY BLOCK REMOVE AS

NEEDED TO FIT THE APPROVED BOTTLE FILL STATION AND

FRAMING. SEE DETAIL 4/AE400.

FILL ALL EXISTING CLAY TILE / BRICK OR BLOCK

CAVITIES NOT ASSIGNED TO REMAIN OPEN WITH

NEW MATCHING CMU GROUTED SOLID.

CONCRETE

DECK TYPE:

B)

2'- 8"

SEE DEMOLITION NOTES DETAIL 1/AE400

FLOOR TO DECK DEMOLITION IS REQUIRED

USE POINT OF CONTACT DUST COLLECTION TO A

HEPA APPROVED VACUUM FOR ALL DUST

PRODUCING TOOLS.

C)

SUSPENDED ACOUSTICAL CEILING

CEILING TYPE:

WEST POINT ENGINEERS ENGINEERING DISCLAIMER:

DURING ON-SITE FIELD INVESTIGATION WEST POINT ENGINEERS (WPE) OBSERVED

POTENTIAL DEFICIENCIES IN THE WALL SECTIONS AND DOOR FRAMES WITHIN THE PROJECT

AREA. THE VA HAS BEEN NOTIFIED BY WPE OF THESE EXISTING CONDITIONS. THE

DEPARTMENT OF VETERANS AFFAIRS HAS ELECTED TO PROCEED WITH THE CONTRACTED

SCOPE OF WORK, INCLUDING WALL PENETRATIONS FOR ASBESTOS ABATEMENT NECESSARY

FOR THE REPLACEMENT AND INSTALLATION OF THE NEW SANITARY PIPE AND BOTTLE FILL

STATIONS, WITHOUT COMPREHENSIVE REMEDIATION OF IDENTIFIED DEFICIENCIES.

CONTRACTOR SHALL NOTIFY THE VA COR IF CONDITIONS ARE UNSUITABLE FOR

CONSTRUCTION AT THE PRE-CONSTRUCTION MEETING REQUIRED BY THE VA TIL

SPECIFICATIONS.

DRYWALL

WALL TYPE:

8'- 0"

EGRESS

DOOR

STAIRWELL 1

WOOD

B

7'- 0"

STEEL

D)

E)

USE POINT OF CONTACT DUST COLLECTION TO A HEPA

APPROVED VACUUM FOR ALL DUST PRODUCING TOOLS.

4.

EXISTING - METAL BLANK OFF PLATE REMOVE AND FILL

WITH NEW CMU. SEE DETAIL 1/AE400.

FOLLOW APPROVED ACM ABATEMENT PRACTICES

SEE SHEET HA100.

5.

EXISTING - PLASTIC BUMPER RAIL. RETAIN AND CLEAN FOR

REUSE IF UNDAMAGED.
1.

SEE DETAIL SHEET 4/AE400

FOLLOW APPROVED LEAD BASED PAINT

MANAGEMENT / ABATEMENT PRACTICES WHEN IN

CONTACT WITH LEAD PAINT ON PLASTER WALLS,
DOORS AND FRAMES. SEE SHEET HA100.

6.

EXISTING - PLASTIC HAND RAIL. RETAIN AND CLEAN FOR

REUSE IF UNDAMAGED.

2.

FILL CHASE CAVITY SEE TYPICAL FIRE PROOF FLOOR

PENETRATION ON SHEET AE400.

EXISTING - PLASTIC WALL FINISH. RETAIN AND CLEAN FOR

REUSE IF UNDAMAGED.

3.

SEE PLUMBING PLANS FOR NEW PIPE INSULATION.

EXISTING - PLASTIC CORNER GUARD. RETAIN AND CLEAN

FOR REUSE IF UNDAMAGED.

4.

NEW 12GA FRAMING WITH UNISTRUT SUPPORTS. SEE

DETAIL 4/AE400

9.

EXISTING - STEEL CORNER GUARD COVERED IN PLASTIC TO

REMAIN. RETAIN AND CLEAN FOR REUSE IF UNDAMAGED.

5.

NOT USED

6.

10.

EXISTING - STEEL HAND RAIL. RETAIN AND CLEAN FOR

REUSE IF UNDAMAGED.