Galveston District FY27 Project Descriptions - SDtB

Work for the Sabine-Neches Waterway (SNWW) for maintenance dredging will require a hopper and pipeline/mechanical dredge(s). The dredge(s) must have the capability to dredge maintenance material up to a depth of -42 ft MLLW and to transport the dredged sediment to a designated Dredged Material Placement Area (DMPA).
Dredged material shall be placed in multiple DMPAs depending on the reach to be dredged and DMPA availability. Potential DMPAs include multiple upland placement areas along the SNWW channel, the Ocean Dredged Material Disposal Sites (ODMDS), and beneficial use site locations. The transport distance to the designated placement areas varies significantly, ranging from direct, local placement to a few miles for the upland placement areas and beneficial use sites, and up to 35 miles for ocean disposal.

Galveston District FY27 Project Descriptions - SDtB

Work for the Galveston Harbor & Channel will require a hopper dredge(s) to perform maintenance dredging up to a depth of -48 ft MLLW, with an additional requirement for increased advanced maintenance (new work) dredging to a depth of -51 ft MLLW within a limited portion of the project footprint. The dredge(s) must have the capability to perform this work and transport the dredged sediment up to 24 miles to the designated placement area. Dredged material shall be placed in the Galveston Ocean Dredged Material Disposal Site (ODMDS), with potential Beneficial Use placement on Galveston Island.

Galveston District FY27 Project Descriptions - SDtB

Work for the Houston Ship Channel for maintenance dredging will require a hopper and pipeline/mechanical dredge(s). The dredge(s) must have the capability to dredge maintenance material up to a depth of -54.5 ft MLLW and to transport the dredged sediment to a designated Dredged Material Placement Area (DMPA).
Dredged material shall be placed in multiple DMPAs depending on the reach to be dredged and DMPA availability. Potential DMPAs include multiple upland placement areas along the Houston Ship Channel and the Galveston Ocean Dredged Material Disposal Site (ODMDS). The transport distance to the designated placement areas varies significantly, ranging from direct, local placement to a few miles for the upland placement areas, and up to 38 miles for ocean disposal.

Galveston District FY27 Project Descriptions - SDtB

Work for the Texas City Ship Channel for maintenance dredging will require a pipeline or hopper

The beginning of the document. Download the full file to read on.