WELCOME & AGENDA
• Background and SDtB Concept
• SDtB in SWG
• Unrestricted / Set Aside
•
•
•
•
Scope / Overview
Mod / Options
Project Schedule: Period of performance and environmental windows Phase 1 and 2 Evaluation Criteria
– Dashboard, pending SWG
• Data and Tools
• Corps Shoaling Analysis Tool (CSAT)
• SDtB Battle Rhythm
Disclaimer: The contents of this presentation are deliberative and subject to change.
BACKGROUND
ENTERPRISE DREDGING DELIVERY CENTER
The Enterprise Dredging Delivery Center (EDDC) Headquarters (HQUSACE) directed center, executed by the South Atlantic Division (SAD), created to implement a coordinated, enterprisewide approach to dredging. Its mission is to bring together dredging, engineering, cost, construction, and contracting expertise from across USACE to improve competition, predictability, and efficiency.
SCOPE DREDGE TO BUDGET CONCEPT
SDtB is a contracting approach where a dredging contract is awarded for a fixed price, and the contractor removes as much shoaling as possible within that budget, rather than bidding on a specified quantity.
This innovative approach is being piloted to provide greater cost certainty and flexibility. For example, the FY27 pilot combines 10 SWG projects into two contract groups, allowing for more efficient mobilization and execution across the region.
SDTB OVERVIEW
SDtB Unrestricted (1.0)
$134.7M Budget
Full and open competition for major deep-draft
navigation channels and ports along the Texas Coast.
Workplan Option: Flexibility to exercise Houston option (~$15M) subject to work plan budget.
Period of Performance: 1 May 2027 to 30 May 2028
SDtB Set-Aside (1.1)
$26.2M Budget
Small Business set aside for intracoastal waterways and secondary commercial channels along the Texas Coast.
Options: No options
Period of Performance: 1 May 2027 to 30 APR 2028
SDTB SCOPE
SDtB Unrestricted (1.0)
DEPTH
PROJECT
(Priority 1)
SDtB Set-Aside (1.1)
BUDGET
GALVESTON HARBOR AND
CHANNEL, TX
Up to a depth of
-48 ft MLLW
$28.5M
HOUSTON SHIP CHANNEL, TX
Up to a depth of
-54.5 ft MLLW
$54.6M
TEXAS CITY SHIP CHANNEL, TX
Up to a depth of
-48 ft MLLW
$9.9M
FREEPORT HARBOR, TX
Up to a depth of
-60 ft MLLW
$10.9M
MATAGORDA SHIP CHANNEL, TX
Up to a depth of
-40 ft MLLW
$2.1M
CORPUS CHRISTI SHIP CHANNEL, Up to a depth of
TX
-56 ft MLLW
$22.9M
Up to a depth of
-58 ft MLLW
$5.8M
BRAZOS ISLAND HARBOR, TX