Enterprise Dredge Delivery Center - Scope Dredge to
Budget Virtual Industry Day
October 16, 2026, 1:02PM

NOTICE AND DISCLAIMER:

This transcript has been edited to correct obvious spelling, grammatical, and transcription errors for improved legibility; however, the United States Army Corps of Engineers (USACE) does not guarantee the accuracy, completeness, or reliability of its contents.
This document is provided solely as a rough, informal record of the Industry Day discussions held on October 16, 2026, and must not be relied upon as an official or binding representation of the Government's requirements. All topics, procurement strategies, acquisition methodologies, evaluation criteria, timelines, etc. discussed during this event are preliminary as of the date of the Industry Day and subject to change as the procurement develops. The official solicitation, when published on the Government Point of Entry (SAM.gov), shall govern all aspects of this procurement.

TRANSCRIPT FOLLOWS:

Dylan Davis 0:06
They handle some of that, and this will be a good kickoff for that. So again, we've been talking with folks, trying to present information as we get it. I think many of you have heard the team here in the Corps met last week and really kind of put pen to paper.
Hopefully we're able to provide some good information for folks. We will walk through what we have today, and we certainly want to hear back from you. Any questions?
We'll talk a little bit about schedule at the end.
Dylan Davis 0:47
And then go from there.
So we're going to walk through this. Certainly, if you have questions along the way, let us know.
This is intended to be more of a dialogue as we walk through, and then, like I said, we'll also show some of the tools.
The dashboard has a lot of the detailed information on it as well. So, with that, we will go ahead and dive right in. Ros, do you have any opening comments? Nope, I don't have anything. OK, great.
We're going to do some background. I think most are tracking it, but we just want to make sure folks are tracking the latest on the concept. We'll talk about the new scope that we've done, which is based on additional looking at the projects and feedback that

we've received from industry, so you'll see how that scope has changed. We will then talk about some of the details of what this contract will look like. Any kind of mods, options, things like that. We'll talk a little bit on the schedule.

The beginning of the document. Download the full file to read on.