Space Force T-Minus 10-Miler
Performance of Work Statement

AUDIO/VISUAL

The period of performance (POP) for this contract will include a Base year + the Government’s potential to add four (4) one-year options.
1. Prime contractor must be on site and involved in performance directly. At a minimum the prime contractor shall have one supervisor on site at all times when work is being performed.
2. Contractor shall provide and operate a high quality, highly reliable audio system for the start and finish line of the Space Force T-Minus 10-Miler. This system must be suitable for outdoor events and must be submitted for government review as part of the proposal and is subject to government review for approval of offer. Systems determined not to be suitable for the outdoor event and needs prescribed within this PWS shall result in proposal being declined. Dates for the event are listed below: Location: Cape Canaveral Space Station.

YEAR

Date of Event

Date of Set Up

Time to
Set up

Time to test
on Race Day

When to Tear
Down

2026

December 12

December 11

1000-1700

Start-Immediately
Following
___
Finish: 1045-1400

2027

December 11

December 10

1000-1700

2028

December 9

December 9

1000-1700

2029

December 8

December 7

1000-1700

2030

December 14

December 13

1000-1700

0500 test
0545 music
0650 start
0700 finish line
0730 ready
0500 test
0545 music
0650 start
0700 finish line test
0730 ready
0500 test
0545 music
0650 start
0700 finish line
0730 ready
0500 test
0545 music
0650 start
0700 finish line
0730 ready
0500 test
0545 music

Start-Immediately
Following
___
Finish: 1045-1400

Start-Immediately
Following
Finish: 1045-1400

Start-Immediately
Following
Finish: 1045-1400

Start-Immediately
Following

0650 start
0700 finish line
0730 ready

___
Finish: 1045-1400

3. Contractor is to set up audio after 1000 on prep day and be finished by 1700. All contractors need to be off base by 1700 prep day. They are to be in place by 0500 next morning to test all microphones and speakers prior to the start of the event. Music is to begin playing at 0545 and the event narrator will take over contractor equipment at the start location at 0650. Equipment must allow for a speaker to make a microphone and be able to speak to all persons present at the event through the respective speaker audio system. The National Anthem (Air Force Band) is to be cued up and ready to play at the start line by 0720 IF there is not a scheduled in-person singer. Simultaneously, the