Attachment 10 -09 91 00 - Painting
Updated
A PDF document (246 KB) attached to FY27 Multiple Award Task Order Contract, SEED PROJECT NO: 550-25-108, Renovate Bathrooms in B103 PRRTP & B64/7 at the VA Illiana Health Care System (VIHCS), Danville IL., from the Department of Veterans Affairs. Due Nov 23, 2026, 10:00 AM (UTC-6).
File name: Attachment 10 -09 91 00 - Painting.pdf
The full file is for paid members, or buy this bid alone.
Preview
VA Danville Renovate B103 PRRTP Bathrooms
VA Illiana Health Care System
1900 E. Main St., Danville, IL 61832
SECTION 09 91 00
PAINTING
Project # 550-25-108
01-01-21
PART 1 - GENERAL
DESCRIPTION
A. Work of this Section includes all labor, materials, equipment, and services necessary to complete the painting and finishing as shown on the construction documents and/or specified herein, including, but not limited to, the following:
1. Prime coats which may be applied in shop under other sections. 2. Prime painting unprimed surfaces to be painted under this Section. 3. Painting items furnished with a prime coat of paint, including touching up of or repairing of abraded, damaged or rusted prime coats applied by others.
4. Painting ferrous metal (except stainless steel) exposed to view. 5. Painting galvanized ferrous metals exposed to view.
6. Painting interior concrete block exposed to view.
7. Painting gypsum drywall exposed to view.
8. Painting of wood exposed to view, except items which are specified to be painted or finished under other Sections of these specifications. Back painting of all wood in contact with concrete, masonry or other moisture areas.
9. Painting pipes, pipe coverings, conduit, ducts, insulation, hangers, supports and other mechanical and electrical items and equipment exposed to view.
10. Painting surfaces above, behind or below grilles, gratings, diffusers, louvers lighting fixtures, and the like, which are exposed to view through these items.
11. Painting includes shellacs, stains, varnishes, coatings specified, and striping or markers and identity markings.
12. Incidental painting and touching up as required to produce proper finish for painted surfaces, including touching up of factory finished items.
13. Painting of any surface not specifically mentioned to be painted herein or on construction documents, but for which painting is obviously necessary to complete the job, or work which comes within the intent of these specifications, is to be included as though specified.
RELATED WORK
A. Section 01 35 26, SAFETY REQUIREMENTS: Activity Hazard Analysis.
09 91 00 - Painting - 1
VA Danville Renovate B103 PRRTP Bathrooms
Project # 550-25-108
VA Illiana Health Care System
01-01-21
1900 E. Main St., Danville, IL 61832
B. Section 02 83 33.13, LEAD-BASED PAINT REMOVAL AND DISPOSAL: Lead Paint
Removal.
C. Division 05 METALS: Shop prime painting of steel and ferrous metals. D. Division 08 OPENINGS: Shop prime painting of steel and ferrous metals.
The beginning of the document. Download the full file to read on.
Other documents in this bid
- SOL Attachment 3 Sub-contractor Info Consent
- SOL Attachment 4 Past Performance Client Questionnaire
- SOL Attachment 7 SEED PROJECT Wage Determination
- 0002 2026.10.20 full
- 0001 Attachment 1 SOL Attachment 1 SEED PROJECT Statement of Work Renovate Bathrooms B103 RRTP
- 0001 Attachment 4 SOL Attachment 4 Past Performance Client Questionnaire
- 0001 Attachment 5 SOL Attachment 5 SEED PROJECT Specifications
- 0001 Attachment 6 SOL Attachment 6 SEED PROJECT Drawings
- 0001 Attachment 7 SOL Attachment 7 SEED PROJECT Wage Determination
- 0001 Attachment 8 SOL Attachment 8 Contractor Safety and EMR
- 0001 Attachment 9 SOL Attachment 9 VAAR 852.219-75 Certification
- Bid document