ATTACHMENT K-1

Exhibit (1) Ship Operating Experience – The offeror shall complete this table per L-7.B.1.a.ii. Insert additional rows as applicable. Sample data has been provided as guidance. Ship Name
Ship Type
Ship Owner
Relationship of Contractor to Ship
Dates Operated (From MM/YYYY To MM/YYYY)
Gross Tonnage
Propulsion Type
Propulsion HP
LOA
Beam
If Forward Deployed (From MM/YYYY To MM/YYYY / ROS or FOS / Location) M/V Noah Zark
Container
Theolmyti Inc.
Operator
06/2009-01/2015; 02/2016-02/2021
15,000
Slow Speed Diesel
25,000
650’
85’
10/2009-10/2014 / FOS / Alaska
M/V Kent Goh Strait
Oil Tanker
Dinoco
Maintenance Manager
04/2012-09/2017
30,000
Slow Speed Diesel
28,500
705’
125’
04/2012-09/2017 / FOS / Vietnam

Note: The columns for “Dates Operated” and “If Forward Deployed” shall show total duration of experience by completing the beginning and end time on each row, otherwise the information will not be considered complete.

ATTACHMENT K-2

Exhibit (2) – Dry Dock Repair Experience: The offeror shall complete this table per L-7.B.1.b.iii. Insert additional rows as applicable. Sample data has been provided as guidance. Ship Name
Dates of Availability

(From MM/DD/YYYY To MM/DD/YYYY)

Gross Tonage/HP
Availability Location
Final Cost
Final Duration
Reason for Dry Docking the Ship
M/V Noah Zark
01/01/2000 – 02/29/2000
9,000/ 20,000
Dubai
$6.6M

59 days

Regulatory Surveys Due
M/V Noah Zark
01/01/2005 – 03/31/2005
4,500/ 10,000
Singapore
$4.2M

90 days

Regulatory Surveys Due
M/V Kent Goa Strait
01/31/2003 – 04/30/2003
4,500/ 10,000
Portugal
$5.2M

90 days

Repair U/W hull plating damaged by grounding.

Note: The column for “Dates of Availability” shall show total duration of experience by completing the beginning and end time on each row, otherwise the information will not be considered complete.

Key Shore-Side Billet
Proposed Individual (First and Last Name)
Current Job Title
Current Employee?
Proposed Percent Dedication to this Contract
Proposed Total Percent Dedication to Other Duties
Minimum Key Billet Requirements
Port Engineer (Example)
Jim Nasium
Engineering Superintendent
Yes
100%
0%
X
Assistant Operations Manager/POC for Operations (Example) Rick O’Shay
Scheduler
Yes
40%
60%

ATTACHMENT K-3

Exhibit (3) – Technical Approach, Key Shore Side Personnel: The offeror shall complete this table for individuals proposed as Key Shore Side Personnel as part of L-7.B.1.a.iii. Insert additional rows as applicable. Sample data has been provided as guidance.