Attachment 18: Volume III Part 2 Checklist
Updated
A Word document (30 KB) attached to Operation & Maintenance (O&M) of T-ATS Vessels, from the Department of the Navy. Due Nov 16, 2026, 1:00 PM (UTC-6).
File name: 26R6006 Attach 18 - Volume III Part 2 Checklist.docx
The full file is for paid members, or buy this bid alone.
Preview
Volume III, Part 2 – Technical Trade-off Proposal Self-Attestation Checklist Instructions: This checklist must be completed, signed, and inserted at the beginning of Volume III, Part 2 (Technical Trade-off Proposal). The Offeror shall verify that all required narratives, matrices, and attachments are included and indicate the exact proposal location for each element. Field
Offeror Submission Details
Offeror Name
Solicitation Number
Included
Requirement Description & Specific Criteria
Solicitation Reference
Location in Proposal (Vol / Sec / Page)
A. Ship Operating Experience
☐
DP2 OSV & Towing Vessel Experience Narrative
L-8(C)(2)(a)(i)
☐
Forward Deployed FOS Ship Experience
L-8(C)(2)(a)(i)
☐
Open Ocean Towing Operations Narrative
L-8(C)(2)(a)(ii)
☐
Underwater Salvage & Construction Support Narrative
L-8(C)(2)(a)(iii)
☐
Subsea Crane Operations Narrative
L-8(C)(2)(a)(iv)
☐
Attachment 19
L-8(C)(2)(a)(v)
B. Ship Maintenance and Repair Experience
☐
Corporate Maintenance Experience Narrative
L-8(C)(2)(b)(i)
☐
Planned Maintenance Techniques Narrative
L-8(C)(2)(b)(ii)
☐
Major Availability Experience Narrative
L-8(C)(2)(b)(iii)
☐
Attachment 20
L-8(C)(2)(b)(iii)
C. Staffing Plan
☐
Organizational Structure
L-8(C)(2)(c)
☐
Proposed Minimum Staffing Matrix
L-8(C)(2)(c)
☐
Staffing Matrix Narrative
L-8(C)(2)(c)
☐
Shore Side Personnel Narrative & Allocations
L-8(C)(2)(c)
☐
Recruitment and Retention Plan
L-8(C)(2)(c)
☐
Performance Incentives & Management Controls
L-8(C)(2)(c)
D. Technical Management Approach
☐
Technical Management Approach Narrative
L-8(C)(2)(d)
E. Data Consistency & Formatting Compliance
☐
Attachment & Narrative Data Reconciliation: Verification that all metrics, vessel data, dates, and costs submitted across the narrative, Attachment 19, and Attachment 20 match identically without omission, discrepancy, or template modification. L-8(C)(2)
Certification Statement:By signing below, I certify on behalf of the Offeror that all items listed in this checklist have been fully completed, verified for accuracy, and incorporated into Volume III, Part 2 at the specific locations indicated above. I further verify that the data in narratives and Attachments 19 and 20 are reconciled and identical. Signatory Field
Details
Authorized Signature
Printed Name
Title / Role
Date
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment 1: Performance Work Statement
- Attachment 10: Technical Proposal Datasheets
- Attachment 12: CPARS-Oversight and Metrics
- Attachment 15: SF LLL
- Attachment 16: Volume I Checklist
- Attachment 17: Volume III Part 1 Checklist
- Attachment 19: Ship Operating Experience
- Attachment 20: Dry Docking Experience
- Attachment 3: T-ATS Security Classification (DD 254) Signed
- Attachment 4: Protection Indemnity
- Attachment 5: Hull Clauses
- Attachment 7: Past Perf Narrative