Attachment
Updated
A PDF document (232 KB) attached to Swan Lake Ranger District Janitorial Contract, Flathead National Forest, from the Forest Service. Due Nov 12, 2026, 1:00 PM (UTC-7).
File name: C04k-Attachment 11-QASP-1240LS26Q0044.pdf
The full file is for paid members, or buy this bid alone.
Preview
US Department of Agriculture (USDA)
Quality Assurance Surveillance Plan
1.1
1.2
1.2.1
1.2.2
1.3
2.1
2.1.1
2.1.2
2.2
2.2.1
2.2.2
3.1
3.2
3.2.1
3.2.2
3.2.3
4.1
4.2
Project Name
Swan Lake Ranger District Janitorial Contract
Solicitation / Contract Number
1240LS26Q0044
Section 1: Introduction
This Quality Assurance Surveillance Plan (QASP) is pursuant to the requirements listed in the Statement of Work (SOW) entitled Swan Lake Ranger District Janitorial Contract. This plan sets forth the procedures and guidelines that the USDA, US Forest Service will use in ensuring the required performance standards or services levels are achieved by the contractor.
1.1 Purpose
The purpose of the QASP is to describe the systematic methods used to measure performance and to identify the reports required and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards identified in the SOW. This QASP is designed to define roles and responsibilities, identify the performance objectives, define the methodologies used to monitor and evaluate the contractor’s performance, describe quality assurance reporting, and describe the analysis of quality assurance monitoring results.
1.2 QASP Relation to the Contract
1.2.1 QASP Revisions
The Contracting Officer Representative (COR) may make revisions or changes to the QASP procedures and surveillance methods or increase or decrease the degree of surveillance methods at any time during the contract performance period. Changes to the Metric must be incorporated into the SOW and QASP by a bilateral modification to contract that is issued by the Contracting Officer (CO). A copy of the QASP is provided to the contractor to enable the contractor to enhance its Quality Control (QC) program to perform in accordance with its Quality Control Plan (QCP).
1.2.2 Surveillance of Performance Progression
As the performance period progresses, the levels of surveillance may be altered for service areas where performance is either consistently excellent or unsatisfactory. If consistently good performance, then the amount of surveillance may be reduced. If observations reveal consistent deficiencies, increased surveillance may be implemented.
1.3 QASP Relation to the Quality Control Plan (QCP)
The QCP is a required element of contract and the Contractor shall adhere to its established quality control processes and procedures in managing and performing work as described in the contract. While the QCP represents the way in
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Attachment 1-Solicitation Terms and Conditions-Swan Lake Janitor
- Attachment 2-Statement of Work-Swan Lake Janitor
- Attachment 5-Past Performance Data Sheet-Swan Lake Janitor
- Attachment 6-Team Partner Consent Form-Swan Lake Janitor
- Attachment 9-Contractor Credentialing-Training Requirements-Swan Lake RD Janitor
- Attachment 4-Schedule of Items-Swan Lake Janitor-corrected
- Attachment 10: Template for Mandatory Training Procedures for Contractor Employees- -corrected