Home / GAOA Facilities, Barracks Inyo NF / Document

Attachment 15: Specifications Revised

Updated

A PDF document (1.3 MB) attached to GAOA Facilities, Barracks Inyo NF, from the Forest Service. Due Nov 18, 2026, 12:00 PM (UTC-8).

File name: Attachment 15 Specifications Revised 10 Nov 26.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Inyo National Forest

Forestwide Facilities Improvement
Project

Technical Specifications
November 2026

Inyo National Forest

SPECIFICATIONS LIST

DIVISION 01 - GENERAL REQUIREMENTS

01 00 40 - Project Coordination

01 10 00 - Summary of Work

01 30 00 - Administrative Requirements

01 42 16 - Definitions and Reference Standards
01 50 00 - Temporary Facilities and Controls

01 60 00 - Product Requirements

01 78 00 – Closeout Procedures and Submittals

01 90 00 - Mobilization

DIVISION 02 - EXISTING CONDITIONS

02 05 00 - Common Work Results for Existing Conditions

02 41 00 - Demolition

02 42 00 - Removal and Salvage of Construction Materials 02 80 00 – Discovery Protocol for Hazardous Materials
02 81 00 - Transportation and Disposal of Hazardous Materials

02 82 00 - Asbestos Remediation

02 83 00 - Lead Remediation

02 84 00 - Mold Remediation

02 85 00 - Hazardous Material Abatement

DIVISION 03 - CONCRETE

03 10 00 - Concrete Forming and Accessories

03 20 00 - Reinforcing Steel

03 30 00 - Cast-In-Place Concrete

03 35 00 - Concrete Finishing

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 - Rough Carpentry

06 40 00 - Architectural Woodwork

06 70 00 - Plastic Fabrications

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 27 00 - Air Barriers

07 30 00 - Roofing

07 40 00 - Siding

07 54 00 - Low-Slope Roofing

07 62 00 - Sheet Metal Flashing and Trim

07 70 00 - Roof Accessories

07 80 00 - Fire Protection (Historic Shake Roof)

DIVISION 08 - OPENINGS

08 10 00 - Doors

08 11 00 - Metal Doors and Frames
08 14 00 - Interior Wood Doors
08 40 00 - Entrance Doors, Storm and Screen Doors

08 50 00 - Windows

08 70 00 - Hardware

Inyo National Forest
08 90 00 - Louvers and Vents

DIVISION 09 - FINISHES

09 21 00 - Gypsum Board Assemblies

09 51 00 - Acoustical Ceilings

09 60 00 - Flooring

09 90 00 - Painting and Coating

DIVISION 10 - SPECIALTIES

10 28 00 - Toilet, Bath and Laundry Accessories

10 29 00 - Pest Control

DIVISION 22 - PLUMBING

22 40 00 - Plumbing Fixtures

22 11 00 - Facility Water Distribution
22 13 00 - Sanitary Sewer Systems
22 70 00 - Sewerage and Drainage Piping

DIVISION 23 - HEATING, VENTING, AND AIR CONDITIONING (HVAC)

23 00 00 - HVAC General Requirements

23 70 00 - Mechanical Ventilation

23 80 00 – Heating Systems

DIVISION 26 - ELECTRICAL

26 00 00 - General Electrical Requirements
26 05 00 - Common Work Results for Electrical

26 09 00 - Controls

26 50 00 - Lighting

26 60 00 - Electrical Service for Trailer Pads

DIVISION 31 - EARTHWORK

31 00 00 - Earthwork

31 20 00 - Earth Moving

DIVISION 32 - EXTERIOR IMPROVEMENTS

The beginning of the document. Download the full file to read on.

Other documents in this bid