Attachment 15: Specifications Revised
Updated
A PDF document (1.3 MB) attached to GAOA Facilities, Barracks Inyo NF, from the Forest Service. Due Nov 18, 2026, 12:00 PM (UTC-8).
File name: Attachment 15 Specifications Revised 10 Nov 26.pdf
The full file is for paid members, or buy this bid alone.
Preview
Inyo National Forest
Forestwide Facilities Improvement
Project
Technical Specifications
November 2026
Inyo National Forest
SPECIFICATIONS LIST
DIVISION 01 - GENERAL REQUIREMENTS
01 00 40 - Project Coordination
01 10 00 - Summary of Work
01 30 00 - Administrative Requirements
01 42 16 - Definitions and Reference Standards
01 50 00 - Temporary Facilities and Controls
01 60 00 - Product Requirements
01 78 00 – Closeout Procedures and Submittals
01 90 00 - Mobilization
DIVISION 02 - EXISTING CONDITIONS
02 05 00 - Common Work Results for Existing Conditions
02 41 00 - Demolition
02 42 00 - Removal and Salvage of Construction Materials 02 80 00 – Discovery Protocol for Hazardous Materials
02 81 00 - Transportation and Disposal of Hazardous Materials
02 82 00 - Asbestos Remediation
02 83 00 - Lead Remediation
02 84 00 - Mold Remediation
02 85 00 - Hazardous Material Abatement
DIVISION 03 - CONCRETE
03 10 00 - Concrete Forming and Accessories
03 20 00 - Reinforcing Steel
03 30 00 - Cast-In-Place Concrete
03 35 00 - Concrete Finishing
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 - Rough Carpentry
06 40 00 - Architectural Woodwork
06 70 00 - Plastic Fabrications
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 27 00 - Air Barriers
07 30 00 - Roofing
07 40 00 - Siding
07 54 00 - Low-Slope Roofing
07 62 00 - Sheet Metal Flashing and Trim
07 70 00 - Roof Accessories
07 80 00 - Fire Protection (Historic Shake Roof)
DIVISION 08 - OPENINGS
08 10 00 - Doors
08 11 00 - Metal Doors and Frames
08 14 00 - Interior Wood Doors
08 40 00 - Entrance Doors, Storm and Screen Doors
08 50 00 - Windows
08 70 00 - Hardware
Inyo National Forest
08 90 00 - Louvers and Vents
DIVISION 09 - FINISHES
09 21 00 - Gypsum Board Assemblies
09 51 00 - Acoustical Ceilings
09 60 00 - Flooring
09 90 00 - Painting and Coating
DIVISION 10 - SPECIALTIES
10 28 00 - Toilet, Bath and Laundry Accessories
10 29 00 - Pest Control
DIVISION 22 - PLUMBING
22 40 00 - Plumbing Fixtures
22 11 00 - Facility Water Distribution
22 13 00 - Sanitary Sewer Systems
22 70 00 - Sewerage and Drainage Piping
DIVISION 23 - HEATING, VENTING, AND AIR CONDITIONING (HVAC)
23 00 00 - HVAC General Requirements
23 70 00 - Mechanical Ventilation
23 80 00 – Heating Systems
DIVISION 26 - ELECTRICAL
26 00 00 - General Electrical Requirements
26 05 00 - Common Work Results for Electrical
26 09 00 - Controls
26 50 00 - Lighting
26 60 00 - Electrical Service for Trailer Pads
DIVISION 31 - EARTHWORK
31 00 00 - Earthwork
31 20 00 - Earth Moving
DIVISION 32 - EXTERIOR IMPROVEMENTS
The beginning of the document. Download the full file to read on.