Attachment 2: North Rim CDs Volume 03
Updated
A PDF document (4.9 MB) attached to GRCA 318719 North Rim & Springs Rehabilitation Pro, from the Departmental Offices. Due Jan 8, 2027, 12:00 PM (UTC-7).
File name: B08_Attach_02_North_Rim_Final_CDs_Volume_03_20261012.pdf
The full file is for paid members, or buy this bid alone.
Preview
GRAND CANYON NATIONAL PARK
UNESCO
WORLD HERITAGE SITE
REHABILITATE NORTH RIM
INFRASTRUCTURE
VOLUME 3 - PIPELINES - NORTH RIM TO SUPAI TUNNEL
8/7/2026 1:27:04 PM
Autodesk Docs://10350545_NPS_GRCA_N_Rim_Utility_2026/10350545_030_GENERAL.rvt
SHEET
VOLUME #
DESCRIPTION
VOLUME 0
VOLUME 1
VOLUME 2
VOLUME 3
VOLUME 4
VOLUME 5
VOLUME 6
VOLUME 7
VOLUME 8
VOLUME 9
VOLUME 10
VOLUME 11
VOLUME 12
GENERAL
PIPELINES - NORTH RIM
PIPELINES - NORTH RIM TO ROARING SPRINGS PUMPHOUSE (RSPH)
PIPELINES - NORTH RIM TO SUPAI TUNNEL
PIPELINES - ROARING SPRINGS CAVE TO ROARING SPRINGS PUMPHOUSE (RSPH)
ROARING SPRINGS PUMPHOUSE (RSPH)
NORTH RIM WATER TREATMENT PLANT
NOT USED
NORTH RIM WASTEWATER COLLECTION SYSTEM
POWER DISTRIBUTION - NORTH RIM
POWER DISTRIBUTION - NORTH RIM TO ROARING SPRINGS PUMPHOUSE (RSPH)
POWER DISTRIBUTION - ROARING SPRINGS PUMPHOUSE (RSPH) TO MANZANITA
POWER SYSTEM - COTTONWOOD CAMPGROUND
SUB SHEET
030G001
030C101
030D101
031X101
031C101
031C102
031C103
031C104
031C105
031C106
031C107
031C108
031C401
031C402
031C501
031C502
031C503
031C901
031S501
SUB AREA
GENERAL
GENERAL
GENERAL
FW PIPELINE
FW PIPELINE
FW PIPELINE
FW PIPELINE
FW PIPELINE
FW PIPELINE
FW PIPELINE
FW PIPELINE
FW PIPELINE
FW PIPELINE
FW PIPELINE
FW PIPELINE
FW PIPELINE
FW PIPELINE
FW PIPELINE
FW PIPELINE
TITLE OF SHEET
SHEET INDEX
SITE PLAN
SUPAI FW HYDRAULIC PROFILE AND VALVE SCHEDULE
SITE DEMOLITION PLAN
GESC PLAN
SHEET MAP
PLAN AND PROFILE STA 301+00 TO STA 301+50
PLAN AND PROFILE STA 301+50 TO STA 306+95
PLAN AND PROFILE STA 306+95 TO STA 312+04
PLAN AND PROFILE STA 312+04 TO STA 320+71
PLAN AND PROFILE STA 320+71 TO STA 329+00
PLAN AND PROFILE STA 329+00 TO STA 322+09
SUPAI REST AREA PRV ENLARGED PLAN
SUPAI REST AREA WATER FILLING STATIONS ENLARGED PLAN
WATER SPIGOT AND BOTTLE FILLING STATION DETAILS
AIR RELIEF VALVE VAULT ASSEMBLY PLAN AND SECTIONS
RESTHOUSE VAULT ASSEMBLY PLAN AND SECTIONS
PHOTO DETAILS
PIPELINE ANCHOR DETAILS
A/E FIRM
DESIGNED:
PRIME:
N. HUMPHREY
HDR ENGINEERING, INC.
DENVER, CO 80202
N. LYNCH
TECH. REVIEW:
M.
GOUGH
GOUGH/LUSTER
B.
LUSTER
DATE:
AUG 2026
SUB SHEET NO.
G001
TITLE OF SHEET
DRAWING NO.
GENERAL
182752
SHEET INDEX
PMIS/PKG NO.
318719
SHEET
NORTH RIM - GRAND CANYON NATIONAL PARK
OF
HDR ENGINEERING, INC.
DENVER, CO 80202
GOUGH/LUSTER
NORTH RIM - GRAND CANYON NATIONAL PARK
HDR ENGINEERING, INC.
DENVER, CO 80202
GOUGH/LUSTER
NORTH RIM - GRAND CANYON NATIONAL PARK
HDR ENGINEERING, INC.
DENVER, CO 80202
GOUGH/LUSTER
NORTH RIM - GRAND CANYON NATIONAL PARK
CF
SF
SF
CF
CF
SCL
SCL
SF
HDR ENGINEERING, INC.
DENVER, CO 80202
GOUGH/LUSTER
NORTH RIM - GRAND CANYON NATIONAL PARK
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Bid document
- Attachment 1: Specifications Rehabilitate North Rim Vol B (Div 02-23)
- Attachment 1: Specifications Rehabilitate North Rim Vol C (Div 26-46)
- Attachment 1: Specifications Rehabilitate North Rim Vol A (Div 01)
- Attachment 2: North Rim CDs Volume 00 Part1
- Attachment 2: North Rim CDs Volume 00 Part10
- Attachment 2: North Rim CDs Volume 00 Part11
- Attachment 2: North Rim CDs Volume 00 Part9
- Attachment 2: North Rim CDs Volume 02
- Attachment 2: North Rim CDs Volume 04
- Attachment 2: North Rim CDs Volume 05 Part1
- Attachment 2: North Rim CDs Volume 05 Part11