Home / GRCA 318719 North Rim & Springs Rehabilitation Pro / Document

Attachment 2: North Rim CDs Volume 04

Updated

A PDF document (9.9 MB) attached to GRCA 318719 North Rim & Springs Rehabilitation Pro, from the Departmental Offices. Due Jan 8, 2027, 12:00 PM (UTC-7).

File name: B08_Attach_02_North_Rim_Final_CDs_Volume_04_20261012.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

UNESCO

GRAND CANYON NATIONAL PARK

WORLD HERITAGE SITE

REHABILITATE NORTH RIM

INFRASTRUCTURE

VOLUME 4 - PIPELINES - ROARING SPRINGS CAVE TO

ROARING SPRINGS PUMPHOUSE (RSPH)

8/7/2026 2:23:58 PM

Autodesk Docs://10350545_NPS_GRCA_N_Rim_Utility_2026/10350545_040_GENERAL.rvt

SHEET

VOLUME #

DESCRIPTION

VOLUME 0

VOLUME 1

VOLUME 2

VOLUME 3

VOLUME 4

VOLUME 5

VOLUME 6

VOLUME 7

VOLUME 8

VOLUME 9

VOLUME 10

VOLUME 11

VOLUME 12

GENERAL

PIPELINES - NORTH RIM

PIPELINES - NORTH RIM TO ROARING SPRINGS PUMPHOUSE (RSPH)

PIPELINES - NORTH RIM TO SUPAI TUNNEL

PIPELINES - ROARING SPRINGS CAVE TO ROARING SPRINGS PUMPHOUSE (RSPH)

ROARING SPRINGS PUMPHOUSE (RSPH)

NORTH RIM WATER TREATMENT PLANT

NOT USED

NORTH RIM WASTEWATER COLLECTION SYSTEM

POWER DISTRIBUTION - NORTH RIM

POWER DISTRIBUTION - NORTH RIM TO ROARING SPRINGS PUMPHOUSE (RSPH)

POWER DISTRIBUTION - ROARING SPRINGS PUMPHOUSE (RSPH) TO MANZANITA

POWER SYSTEM - COTTONWOOD CAMPGROUND

SUB SHEET

040G001
040C101
041X101
041C101
041C102
041C103
041C401
041C501
041C502
041C901
041E601

SUB AREA

GENERAL

GENERAL

RSPH PIPELINE REHABILITATION

RSPH PIPELINE REHABILITATION

RSPH PIPELINE REHABILITATION

RSPH PIPELINE REHABILITATION

RSPH PIPELINE REHABILITATION

RSPH PIPELINE REHABILITATION

RSPH PIPELINE REHABILITATION

RSPH PIPELINE REHABILITATION

RSPH PIPELINE REHABILITATION

TITLE OF SHEET

SHEET INDEX

SITE PLAN

DEMOLITION PLAN

GESC PLAN

SHEET MAP

PLAN AND PROFILE STA 401+00 TO STA 407+71

ENLARGED SITE PLAN RS CAVE

CIVIL DETAILS WATERLINE REPLACEMENT

CIVIL DETAILS POWER AND FO INSTALLATION

PHOTO DETAILS

CAVE ONE LINE AND PANELBOARD SCHEDULE

A/E FIRM

DESIGNED:

PRIME:

S. RACE

HDR ENGINEERING, INC.

DENVER, CO 80202

N. LYNCH

TECH. REVIEW:

M. LUSTER

GOUGH

B.

GOUGH/LUSTER

DATE:

AUG 2026

SUB SHEET NO.

G001

TITLE OF SHEET

DRAWING NO.

GENERAL

182752

SHEET INDEX

PMIS/PKG NO.

318719

SHEET

NORTH RIM - GRAND CANYON NATIONAL PARK

OF

HDR ENGINEERING, INC.

DENVER, CO 80202

GOUGH/LUSTER

NORTH RIM - GRAND CANYON NATIONAL PARK

HDR ENGINEERING, INC.

DENVER, CO 80202

GOUGH/LUSTER

NORTH RIM - GRAND CANYON NATIONAL PARK

SCL

HDR ENGINEERING, INC.

DENVER, CO 80202

GOUGH/LUSTER

NORTH RIM - GRAND CANYON NATIONAL PARK

HDR ENGINEERING, INC.

DENVER, CO 80202

GOUGH/LUSTER

NORTH RIM - GRAND CANYON NATIONAL PARK

PRIME:

HDR ENGINEERING, INC.

DENVER, CO 80202

GOUGH/LUSTER

AUG 2026

NORTH RIM - GRAND CANYON NATIONAL PARK

HDR ENGINEERING, INC.

DENVER, CO 80202

GOUGH/LUSTER

NORTH RIM - GRAND CANYON NATIONAL PARK

CATHODICALLY

PROTECTED PIPE

UNPROTECTED PIPE OR

CATHODICALLY

PROTECTED PIPE

C
A
I
T
F
E
TI
NO
R
.
CE

e
in

LAFRONZ

t
e

A

..
...
.

The beginning of the document. Download the full file to read on.

Other documents in this bid