Attachment 2: Performance Work Statement - Draft for Sources Sought - Estes Janitorial Service 1
Updated
A PDF document (135 KB) attached to Estes Janitorial Service, from the Departmental Offices. Due Nov 10, 2026, 3:00 PM (UTC-7).
File name: Attachment_2_-_Performance_Work_Statement_-_DRAFT_for_Sources_Sought_-_Estes_Janitorial_Service_1.pdf
The full file is for paid members, or buy this bid alone.
Preview
PERFORMANCE WORK STATEMENT
DRAFT – FOR MARKET RESEARCH ONLY
ESTES JANITORIAL SERVICE
ESTES AND MARYS LAKE POWERPLANTS
1.1.
SCOPE OF WORK.
The contractor shall furnish all labor, materials, transportation, supplies, equipment and supervision to satisfactorily perform janitorial services as specified. The contractor shall perform in accordance with the standards of the Performance Work Statement (PWS). The number of square feet of floor space is estimated and no claim shall be made against the Government for any excess or deficiency therein. There is a total of approximately 25,000 square feet. Throughout the life of this contract, the contractor is encouraged to continuously seek ways to incorporate innovative and emerging technologies that in the most economic and efficient manner improves mission performance.
1.1.1 SPECIFIC TASKS / SERVICES REQUIRED
1.1.1.1. GENERAL
The contractor shall provide experienced and qualified professional personnel to provide the services to include, but not limited to the tasks identified below. Throughout the life of the contract, the contractor is encouraged to continuously seek ways to incorporate innovative and emerging technologies that in the most economic and efficient manner improve mission performance.
The timely and accurate performance of these services must be recognized as a vital and mandatory requirement of the contract. Therefore, on-time performance of this work is required. Emergency personal time will be made available for unforeseen events such as personal illness, immediate family member illness, etc. If the contractor needs to use emergency personal time, then they must contact the CO or the QAE as soon as possible, but no later than sixty minutes after the start of their shift. Failure to notify the Government may result in remedies in accordance with FAR 52.212-4.
1.1.1.2. CONSTRAINTS
The contractor shall comply with the rules and regulations governing public buildings and grounds and the following constraints:
• All contractor personnel proposed to work on the premises shall curb the amount of airborne dust; therefore, no dry-sweeping is allowed. Only vacuuming with a HEPA vacuum, wet-mopping, or dry-mopping with the use of dust-collecting cleaning products, are permitted.
• All contractor personnel shall be safety-oriented and familiar with general safety and health guidelines.
1.1.1.3. TASK NO. 1 - ESTES POWERPLANT SERVICES
1.1.1.3.1 DAILY SERVICES. The contractor shall perform the following tasks on a daily basis
The beginning of the document. Download the full file to read on.