Section C - Description/Specifications/Statement of Work

GENERAL SPECIFICATIONS

ISLAND PARK HOUSING REROOFING

1.1

SCOPE OF CONTRACT

A.

This project includes removing and replacing metal roofs on 10 housing units at the Island Park Administrative Site.

B.

The work includes tearing off 1 layer of metal roofing and disposing of the existing roofing. Supply and install new Flat Profile 1-3/4” Standing Seam Metal Roof Panels, 24 gauge. Install new Flashing, Trim, and Ridge Vent to Match. Entire underlayment will be self-adhering rubberized 40 mil asphalt felt. Removal of old soffit and fascia and replacement with Aluminum vented soffit and fascia to match. Roofing replacement will be done on 3 Bunkhouses, 3 Duplexes, and 4 Single-Family Homes. Fully replace skip sheathing on Dwelling 1103. Remove and Replace Damaged Sheathing on all other units with 5/8” CDX Plywood or match existing.

C.

Quantities associated with these options are identified in the Schedule of Items.

1.2
A.

1.3
A.

PROJECT LOCATION

The project is located in the Ashton-Island Park Ranger District of the Caribou-Targhee National Forest, Fremont County, Idaho, in Section 27, T 13 N, R 43 E. It is located approximately 26 miles North of Ashton, Idaho. The project may be accessed from State Highway 20 and Forest Road 20137.

SITE INFORMATION AND LIMITATIONS

The following site conditions are considered incidental to the contract and the contractor will not be paid directly for any of the following items: 1.
2.

3.
4.

1.4

Construction sites will be open to Forest Service Employees during construction. All construction equipment shall be pressure washed before entering National Forest System lands. The removal of mud and debris from treads, tracks and undercarriage, with emphasis on axles, frame, cross-members, motor mounts, and underneath steps, running boards, and front bumper/brushguard assemblies will be required. The purpose is to reduce or eliminate the transportation of noxious weeds, which is required by Federal and State regulations.
Water is available at the site for construction purposes. Utilities are available at the site for construction purposes.
Toilet facilities are not available at the site. The Contractor shall provide temporary toilet facilities (porta-potty) at the site during all construction work.

TRAFFIC CONTROL AND CONSTRUCTION SIGNING

SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

000001-1

A.

1.5

No work that endangers, interferes, or conflicts with traffic or access to work sites shall

The beginning of the document. Download the full file to read on.

Other documents in this bid