Attachment 3: Schedule of Items
Updated
A PDF document (80 KB) attached to GAOA Remove and Replace Roofing on Island Park Admin Site Housing Units, from the Forest Service. Due Oct 30, 2026, 5:00 PM (UTC-6).
File name: Attachment 3 - Schedule of Items.pdf
The full file is for paid members, or buy this bid alone.
Preview
Schedule of Items
Island Park Dwellings Reroofing (10 Units)
ITEM
DESCRIPTION
NUMBER
011900 Mobilization
070150.19 Selective Demolition of Existing Roofing (Metal Roofing) 074113-1 Self-Adhering Rubberized Asphalt Felt-40 Mil thick 074113-2 Flat Profile 1-3/4" Standing Seam Metal Roof Panels, 10" Wide, Standard Finish, 24 gauge 074113-3 Ridge Vents (Match Roof Panels)
074113-4 Vent Caps (Match Ridge Vent)
074293 Remove and Replace Soffit with Vented Aluminum Soffit 076200-1 Fascia (Match Soffit)
076200-2 Flashing & Trim (Match Roof Panels)
61000 5/8" Sheathing, Missing and Damaged
Total
METHOD OF
MEASUREMENT
UNIT
LSQ
DQ
AQ
AQ
AQ
AQ
AQ
AQ
AQ
Lump Sum
SF
SQ
SF
LF
EA
LF
SF
LF
AQ
SF
QUANTITY
25,582
25,582
2,144
1,072
2,144
6,598
UNIT
PRICE
TOTAL
The beginning of the document. Download the full file to read on.