Home / B422 Breakroom, B300 BDOC / Document

Attachment 2a B300 BDOC Statement of Work

Updated

A PDF document (135 KB) attached to B422 Breakroom, B300 BDOC, from the Department of the Army. Due Dec 10, 2026, 1:00 PM (UTC-5).

File name: Attachment 02a_B300 BDOC_SOW.pdf

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

STATEMENT OF WORK

Project PBXP272019
B300 BDOC Renovation

MANSFIELD LAHM ANG BASE

MANSFIELD, OHIO

General Requirements

2-3

Project Description

3-5

1. General Requirements

1.1. The contractor shall provide all labor, supervision, materials, equipment, tools, transportation, and incidentals necessary to renovate the B300 BDOC and Battlestaff spaces, including selective demolition, wall repair, interior finish replacement, limited suspended ceiling modifications, and associated electrical and communications pathway work required to support the revised room layouts and new Government-furnished BDOC desks.
1.2. The location of the proposed work is within the main cantonment area of the Mansfield Lahm ANG Base, Mansfield, Ohio.
1.3. The contractor shall not exceed the scope of work without prior approval from the Contracting Officer.
1.4. The contractor shall protect all government property from damage. Any damages incurred in pursuance of this project shall be replaced and/or restored to original condition. 1.5. The contractor shall maintain a clean and safe job site at all times to prevent damage to other existing utilities, and surrounding facilities that may be affected; this is also intended to protect building occupants from potential health hazard associated with the proposed work. This shall include dust, debris, and waste created in performance of this project; along with tools, equipment, and vehicles located at the job site. The contractor shall comply with the provisions of the Occupational Safety and Health Act of 1972 and all provisions thereto. 1.6. The Contractor is responsible for properly laying out the work, and for lines and measurements for the work executed under the Contract Documents.
1.6.1. The Contractor, not the Government, is responsible to field verify all utilities within the project limits and/or as shown on the Drawings, before laying out the work. The Contractor is to report errors or inaccuracies in writing to the Contracting Officer's Representative before commencing work.
1.6.2. The Contracting Officer or his Representative will in no case assume the responsibility for any layout of the work or damages to existing utilities while performance of work is underway.
1.7. The Contractor shall field verify all dimensions. The dimensions provided by the Government are only approximations and they are not responsible for their precision or accuracy. This includes but is not limited to blueprints, drawings, schedules, and statements of work.

The beginning of the document. Download the full file to read on.

Other documents in this bid