Attachment 2b B300 BDOC Drawings
Updated
A PDF document (516 KB) attached to B422 Breakroom, B300 BDOC, from the Department of the Army. Due Dec 10, 2026, 1:00 PM (UTC-5).
File name: Attachment 02b_B300 BDOC_Drawings.pdf
The full file is for paid members, or buy this bid alone.
Preview
Renovate the B300 BDOC and Battlestaff
spaces including selective demolition, wall
repair, painting, resilient tile flooring
replacement, limited suspended ceiling
restoration, and associated electrical and
communications pathway modifications to
support revised room use and
Government-furnished equipment.
1. Contractor shall field verify existing
conditions and dimensions prior to construction.
2. Contractor shall coordinate required utility
interruptions and access requirements with the
Government prior to execution.
3. Contractor shall protect adjacent finishes,
equipment, and building systems from damage
during construction.
4. Patch and restore surfaces disturbed by the
work to match adjacent existing conditions
where applicable.
5. Communications cabling and final
terminations shall be by others unless noted
otherwise.
6. Government-furnished equipment shown or
referenced on the drawings shall be installed by
others unless noted otherwise..
N
VICINITY MAP
NTS
PROJECT
LOCATION
COVER SHEET
G101 COVER SHEET
A101 ARCHITECTURAL NOTES
E101 ELECTRICAL NOTES
MANSFIELD-LAHM AIR NATIONAL GUARD BASE
1947 HARRINGTON MEMORIAL ROAD
MANSFIELD, OH 44903
GENERAL NOTES
179TH CIVIL ENGINEERING SQUADRON
INDEX OF DRAWINGS
PROJECT
LOCATION
B300 BDOC RENOVATION
B300 BDOC RENOVATION
MANSFIELD LAHM ANG BASE
PROJ #: PBXP272019
N
DRAWN:
CMM
CHECKED:
XXX
SITE MAP
DATE:
10/29/26
NTS
SCALE:
NTS
G101
6.
7.
8.
9.
10.
11.
12.
13.
ARCHITECTURAL NOTES
5.
MANSFIELD-LAHM AIR NATIONAL GUARD BASE
1947 HARRINGTON MEMORIAL ROAD
MANSFIELD, OH 44903
3.
4.
Area of renovation.
Remove existing floor finish as required, prepare
substrate, furnish and install new resilient tile flooring and cove base in the BDOC.
Prepare and repaint walls throughout
Remove existing BDOC controller desk and associated
obsolete floor-fed utility components. Refer to E101.
Existing communications floor penetration to remain;
coordinate capping and protection with project
requirements.
Government-furnished controller desk footprint shown for reference; final installation by others.
Remove lower 48 inches of wall finish materials and
provide new gypsum wallboard, finishing, and preparation for paint as indicated.
Remove and dispose of existing projector screen and
associated mounting components.
Restore suspended ceiling grid/tile and provide limited replacement ACT as required to complete the work.
Remove and reinstall existing wall-mounted monitors and associated mounting hardware at revised mounting