U.S. Department of Justice
Federal Bureau of Prisons
Facilities Management
Washington, DC 20534
February 17, 2026
MEMORANDUM FOR SEAN O’BRIEN, CONSTRUCTION REPRESENTATIVE
PROJECT RESOURCES SECTION
KIMBERLY
HUDSON
Digitally signed by KIMBERLY
HUDSON
Date: 2026.02.17 19:06:31 -05'00'
FROM:
Kimberly Hudson, Chief
Construction and Environmental Review Section
SUBJECT:
Statement of Work Approval
Project 24Z5AU6, Replace Generators, Transformers, and Electrical Infrastructure, FCI Three Rivers
The Construction and Environmental Review Section, Facilities Management, has reviewed the Statement of Work (SOW), construction drawings and project specifications to be used for solicitation services for the subject project.
The SOW, drawings and specifications are approved. Please proceed with contract solicitation.
If you have any questions, please contact Jason McNeill, Mechanical Engineer, at email [email protected] or call at (202) 598-7179.
cc: Regional Facilities Administrator SCR
STATEMENT OF WORK
FCI Three Rivers - B&F PROJECT
Replace Generators 1 & 2, Infrastructure, Transformer
I. SPECIFICATIONS:
By FMB-CERS at 12:34 pm, Feb 17, 2026
A. INTRODUCTION
The Federal Bureau of Prisons (FBOP), Federal Correctional Institution (FCI) Three Rivers, located at Highway 72 West, Three Rivers, Texas 78071, intends to award a single contract to a qualified contractor. The contractor shall provide all equipment, labor, materials, and related services required to replace the facility’s two existing back-up generators, transformers and electrical infrastructure.
Bids for this project shall be complete and provide a fully operational installation in accordance with the requirements herein.
B. SCOPE OF WORK
The intent of this project is to replace existing two back-up generators and associated electrical infrastructure as noted in attached construction drawings and specifications.
FCI Three Rivers will remain operational during the entire project. The contractor shall submit a phasing plan for approval that minimizes electrical outages to the greatest extent possible, while providing the labor and resources necessary to accomplish work that requires those outages in the shortest timeframe possible. For all outages exceeding 24 hours, the contractor shall provide temporary means to supply affected facilities with electrical power during the construction process.
C. REFERENCE DOCUMENTS
Attached reference drawings/specifications are provided for work requirements and the Contractor’s benefit. Actual