Attachment 4: Q-A 0001
Updated
A PDF document (121 KB) attached to Rehab Kiosk Restrooms, NPS-ORCA, from the Departmental Offices. Due Nov 20, 2026, 5:00 PM (UTC-8).
File name: B08_Att_04_140PP027Q0018_Q-A_0001.pdf
The full file is for paid members, or buy this bid alone.
Preview
SOLICITATION NO. 140PP027Q0018
REHABILITATE KIOSK RESTROOMS TO IMPROVE VISITOR ACCESS AND EXPERIENCE
OREGON CAVES NATIONAL MONUMENT & PRESERVE
JOSEPHINE COUNTY, OREGON
QUESTIONS AND ANSWERS RECEIVED TO DATE
1: We are a small business holding a California contractor license (CSLB B General Building) and will perform the work through Oregon CCB-licensed subcontractors. Does submitting the Oregon CCB licenses of our subcontractors satisfy the Oregon Contractor State License requirement in the quote instructions when the prime holds a California license, or must the prime hold an Oregon CCB license at quote time or by award? NPS Response: Regarding the quoter’s and any proposed subcontractor’s applicable Oregon Construction Contractors Board License, we will review any supplied information. Those who possess a current and valid State License applicable to the work they will be performing on this project will be more favorably evaluated.
2. The attached wage determination OR20260006 is the Residential construction type. Should the Building wage determination for Josephine County apply to this public restroom project? NPS Response: Because the project involves a building under four stories, the Building wage determination does not apply. If a specific trade or labor classification required for this work is not identified on the applicable wage determination, the successful contractor shall initiate a post-award conformance process (SF-1444) immediately following contract award. 3. Does FAR 52.219-14 / 13 CFR 125.6 apply, and is the work considered general construction (85%)?
NPS Response: No, FAR 52.219-14 is not applicable to this acquisition. 4. How many restrooms, water closets, lavatories and urinals are in the kiosk building, and are any as-built drawings available?
NPS Response: Existing: Two restrooms, three toilets, two sinks, one urinal. No existing asbuilt drawings are available. 5. Is there a hazardous materials (asbestos/lead) survey for the existing tile, mortar bed and paint?
NPS Response: NPS is providing a previously completed hazardous materials report indicating that no ACM was identified in the kiosk for the materials tested. This report does not include lead analysis. See B08_Att_05_ORCA Hazmat Report 2011.pdf. The park has initiated additional asbestos and lead testing and will issue the results through a formal Solicitation Amendment once available, currently estimated by November 20, 2026.
Solicitation 140PP027Q0018, Attachment 04, Questions & Answers
The beginning of the document. Download the full file to read on.