Attachment 5
Updated
A Word document (31 KB) attached to SEV Strategic Replenishment Contract, from the Department of the Air Force. Due Dec 2, 2026, 4:00 PM (UTC-5).
File name: Attachment 5.docx
The full file is for paid members, or buy this bid alone.
Preview
RFP FA8532-21-R-0004
ATTACHMENT 5
PAST PERFORMANCE RELEVANCY TABLE
(To be Completed by Offeror/Joint Venture Member) (Complete for each effort identified for evaluation in the PPI Tool)
Request the offeror/joint venture member (as applicable) complete a separate Relevancy Table for each effort identified for evaluation in the PPI Tool. This table, in addition to the information provided by the offeror in the PPI Tool, will assist the PCO in evaluating the relevancy of the proposed effort to the instant requirements. Offerors/joint venture members shall only complete column three. Offerors’/joint venture members’ answers are applicable only to the efforts identified in the PPI Tool, not the offeror’s proposed solutions to the instant effort. Please be as specific as possible with the fill-in information provided.
Contractor:
Cage Code:
Contract Number:
Program Title:
Contractor Agency/Customer:
Complete all rows that apply to the effort identified above.
Fill-in for the Proposed Effort (GOVT has completed this column)
(DO NOT CHANGE)
Fill-in for the Effort Identified Above (Offeror/joint venture member completes) The effort above required:
1. Nature of Business Area(s)
Involved
Sourcing
2. Inspection and
Acceptance Location
Facility Address
3. Contract Type(s)
FFP
4. Delivery Locations
OCONUS/CONUS
5. Data Deliverables
Examples: Test Plans, Test Procedures, Test Reports, Monthly Status Reports, Department of Defense (military style) technical data package creation (technical orders/manuals/commercial manuals)
Was this contract effort (as identified above) submitted as a past performance source of data for a previous Robins AFB procurement. Yes No . If yes, identify the buyer and/or contracting officer, their phone number and office symbol and solicitation number of the procurement for which this effort was submitted.
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Draft Request for Proposals ATTACHMENTS 1 and 4 through 8
- Draft Request for Proposals Attachment 3 Volume I Oral Presentations for Discussions Slide Deck
- Draft Request for Proposals Attachment 9 Volume II Oral Presentations for Discussions Slide Deck
- Draft Statement of Work
- Draft Request for Proposals
- Request for Proposals Attachment 2 Section M-900
- QandAs
- SRC Questions and Answers Posted to beta.SAM
- Questions and Answers
- Questions and Answers
- Attachment 2
- Attachment 4