SRC Questions and Answers Posted to beta.SAM
Updated
A PDF document (92 KB) attached to SEV Strategic Replenishment Contract, from the Department of the Air Force. Due Dec 2, 2026, 4:00 PM (UTC-5).
File name: 18 Sep 2020 SRC Questions and Answers Posted to beta.SAM.pdf
The full file is for paid members, or buy this bid alone.
Preview
18 Sep 2020 Government Response to Questions
1. Question: Can multiple subsidiaries from a single parent company propose? Answer: Yes if the subsidiaries have a separate CAGE code and are classified as a small business.
2. Question: Will the Government please clarify if additional information is to be included within Volume I, other than the completed/signed RFP, amendments, a cover letter, and any Joint Venture arrangements?
Answer: Yes, additional information is required as detailed in Section L.I.A. The Volume Requirements table contains the Proposal Volume Requirements and the required format of submissions. IAW with Proposal Volume Requirements listed in Section L.II.A, Volume I Requirements includes: Completed RFP/Technical Proposal, Cover Letter, and RFP Attachment 3 – Volume I Oral Presentation for Discussions Slide Deck. Section L.II.B 1-2 also includes specific details regarding Volume I submission information within the volume (Cover Letter and JV agreement).
3. Question: Does the Government intend for a “printout” file from the PPI Tool to be included within the electronically delivered Volume II, or is the PPI Tool database file itself sufficient for delivery of this information?
Answer: A “printout” is not required IAW Section L.II.A. Instructions. The PPI will be submitted electronically IAW Section L.II.A, Proposal Volume I Requirements and the Submission instructions in the RFP Attachment 4 “submit an electronic copy of the saved PPI database file with your proposal”
4. Question: Does the Government have a font / font size requirement for information in the electronically delivered Volumes (other than the Slide Deck), or is this at the Offeror’s discretion?
Answer: Currently there is no font/size requirement for the electronically delivered Volumes in the current draft RFP for the other documents. However, we will implement a font size of 11 Times New Roman or Arial in the Final RFP.
5. Question: How will prices submitted with the basic proposal be utilized? Will they be used to establish proposal reasonableness and/or competitive range? Answer: There will be no Price Volume submitted for the basic contract. Proposals for cost/price will be submitted at the individual order level IAW RFP preamble and Section M. The RFP’s Preamble to the Schedule will be updated to reflect any reference to price within the RFP and attachments is applicable to individual orders.
6. Question: Will individual orders be awarded at the basic proposed prices or will awardees be
The beginning of the document. Download the full file to read on.
Other documents in this bid
- Draft Request for Proposals ATTACHMENTS 1 and 4 through 8
- Draft Request for Proposals Attachment 3 Volume I Oral Presentations for Discussions Slide Deck
- Draft Request for Proposals Attachment 9 Volume II Oral Presentations for Discussions Slide Deck
- Draft Statement of Work
- Draft Request for Proposals
- Request for Proposals Attachment 2 Section M-900
- QandAs
- Questions and Answers
- Questions and Answers
- Attachment 2
- Attachment 4
- Attachment 5