Home / Pest Control Support Services at Naval Weapons Station Earle / Document

Attachment 5: J Management and Administration

Updated

A Word document (1.0 MB) attached to Pest Control Support Services at Naval Weapons Station Earle, from the Department of the Navy. Due Nov 24, 2026, 11:00 AM (UTC-5).

File name: ATT 5 - 0200000 J Management and Administration.docx

Download the full documentSee the bid

The full file is for paid members, or buy this bid alone.

Preview

Section J – 0200000
Management and Administration

Attachment Number
Attachment Title
J-0200000-01
Definitions and Acronyms
J-0200000-02
Wage Determinations
J-0200000-03
Directives, Instructions, and References
J-0200000-04
Invoice Form
J-0200000-05
Forms
J-0200000-06
Government-Furnished Property, Materials, and Services
J-0200000-07
Service Provider Information
J-0200000-08
Asset Information
J-0200000-09
Exhibit Line Item Numbers (ELINs)
J-0200000-10
Contractor Hazardous Material Inventory Log

Attachment J-0200000-01
Definitions and Acronyms

.
Definition
Description
Assessment
A general term referring to either a survey or inspection of a facility to determine condition. Asset
A general term used to refer to an item, such as a component, system, building or facility, which is managed by an automated data management program. Competent Person
A person who has the professional experience and training necessary to identify existing and predictable hazards at a work or service environment, and who has the authority to take prompt and corrective action to eliminate or remove dangers from the environment. One who can identify existing and predictable hazards in the working environment or working conditions that are dangerous to personnel and who has authorization to take prompt corrective measures to eliminate them. Component Inventory Management Unit (CIMU)
An organization of like-kind real property into manageable maintenance units. CIMU is a building component, group of components or component assemblies, serving a specific purpose in a facility that can be expected to follow a common and predictable lifecycle behavior. This class of non-equipment will include items such as exterior walls, exterior windows, interior finish, and roofs. This class of equipment will include items such as fan coil units, air handling units, lighting, and water closets. CIMUs can include one or more items of installed equipment typically subject to routine scheduled maintenance. Confined Work Space
A space that is large enough and so configured that a person may bodily enter a space (such as in tanks, vessels, silos, storage bins, hoppers, vaults, pits, and like spaces where there is limited means of entry) and is hindered or restricted from escaping during an emergency. Construction Equipment
Construction equipment refers to specialized heavy machinery that covers one industry and is specifically designed for executing construction work. Construction equipment requirements shall include a list of equipment establishing the size, quality, number of units, and unit prices. Construction equipment prices provided by the Contractor shall be the lowest price available considering the availability of equipment and the time constraints of the job. The direct equipment price shall be adjusted by all discounts and rebates that accrue to the Contractor.

The beginning of the document. Download the full file to read on.

Other documents in this bid