Attachment 6: Danville VA 2019 Asbestos Reinspection Drawings Rev. 1
Updated
A PDF document (8.4 MB) attached to FY27 Multiple Award Task Order Contract, SEED PROJECT NO: 550-25-108, Renovate Bathrooms in B103 PRRTP & B64/7 at the VA Illiana Health Care System (VIHCS), Danville IL., from the Department of Veterans Affairs. Due Nov 23, 2026, 10:00 AM (UTC-6).
File name: Attachment 6 - Danville VA 2019 Asbestos Reinspection Drawings Rev. 1.pdf
The full file is for paid members, or buy this bid alone.
Preview
DEPARTMENT OF VETERANS AFFAIRS
HAMPTON VA MEDICAL CENTER
DANVILLE, ILLINOIS
2018 ASBESTOS REINSPECTION
VA CONTRACT NUMBER: 550-18-106
LEGEND
00-000-0-00( )
ABC
CASTLE HILL ASSOCIATES, LLC.
2018
14-26
2018
14-24
2018
14-22
2018
14-23
BUILDING #14 - FIRST FLOOR PLAN
NO ACM
N
CASTLE HILL ASSOCIATES, LLC.
E
W
S
2018
14-27
2018
14-30
2018
14-28
2018
14-25
BUILDING #14 - SECOND FLOOR PLAN
NO ACM
N
CASTLE HILL ASSOCIATES, LLC.
E
W
S
2018
14-31
2018
14-33
2018
14-29
2018
14-36
2018
14-32
2018
14-35
2018
14-34
BUILDING #14 - ATTIC FLOOR PLAN
NO ACM
N
CASTLE HILL ASSOCIATES, LLC.
E
W
S
2018
19-15
2018
14-14
BUILDING #19 - BASEMENT FLOOR PLAN
E
LEGEND
W
N
S
CASTLE HILL ASSOCIATES, LLC.
2018
19-18
2018
19-16
2018
19-17
2018
19-7
2018
19-2
2018
19-5
2018
19-1
2018
19-10
2018
19-6
2018
19-3
2018
19-4
2018
19-19
2018
19-21
2018
19-11
2018
19-20
2018
19-9
2018
19-8
2018
19-12
BUILDING #19 - FIRST FLOOR PLAN
E
LEGEND
W
N
S
CASTLE HILL ASSOCIATES, LLC.
2018
19-13
E
BUILDING #19 - ATTIC FLOOR PLAN
W
N
S
CASTLE HILL ASSOCIATES, LLC.
0022-1802(NA)
4269-388/HA-7(-)
4269-408/HA-11(+)
0219D/HA-10(+)
0226D/HA-16(-)
4269-387/HA-7(-)
4269-412/HA-13(-)
4269-386/HA-7(-)
4269-413/HA-13(-)
22-10A-5-03(+)
22-10A-6-03(+)
4269-414/HA-13(-)
0221D/HA-12(+)
4269-415/HA-13(-)
22-3-16-01(-)
4269-406/HA-2(+)
0022-1801(+)
4269-416/HA-16(-)
BUILDING #22 - BASEMENT FLOOR PLAN
2018
22-69
2018
22-68
0022-1803(NA)
4269-376/HA-8(-)
22-103-14-02(-)
4269-377/HA-8(-)
22-103-15-02(-)
4269-378/HA-8(-)
22-109-3-02(-)
22-103-14-01(-)
22-109-4-02(-)
22-103-15-01(-)
22-109-3-01(-)
22-103-14-03(-)
22-109-4-01(-)
22-103-15-03(-)
22-109-3-03(-)
22-105-5-02(+)
22-109-4-03(-)
22-105-6-02(+)
0227D/HA-9(-)
22-105-9-02(-)
22-108-1-01(-)
22-107-5-01(+)
22-107-6-01(+)
22-107-9-01(-)
LEGEND
2018
22-66
2018
22-67
BUILDING #22 - FIRST FLOOR PLAN
S
CASTLE HILL ASSOCIATES, LLC.
W
E
N
2018
25-47
2018
25-49
2018
25-48
2018
25-51
2018
25-50
2018
25-52
2018
25-53
2018
25-54
BUILDING #25 - FLOOR PLAN
LEGEND
N
CASTLE HILL ASSOCIATES, LLC.
E
W
S
2018
25-55
2018
25-56
BUILDING #49 - CRAWL SPACE PLAN
LEGEND
S
CASTLE HILL ASSOCIATES, LLC.
W
E
N
2018
49-41
2018
49-45
2018
49-40
2018
49-44
2018
49-39
2018
49-38
2018
49-37
2018
49-46
2018
49-43
2018
49-42
BUILDING #49 - FIRST FLOOR PLAN
BUILDING #49 - LOFT FLOOR PLAN
S
CASTLE HILL ASSOCIATES, LLC.
W
E
N
58-4A-49-02(+)
58-4A-50-02(-)
58-4A-49-01(+)
58-4A-50-01(-)
4269-199/HA-21(-)
58-4A-49-03(+)
4269-200/HA-21(-)
58-4A-50-03(-)
The beginning of the document. Download the full file to read on.
Other documents in this bid
- SOL Attachment 3 Sub-contractor Info Consent
- SOL Attachment 4 Past Performance Client Questionnaire
- SOL Attachment 7 SEED PROJECT Wage Determination
- 0002 2026.10.20 full
- 0001 Attachment 1 SOL Attachment 1 SEED PROJECT Statement of Work Renovate Bathrooms B103 RRTP
- 0001 Attachment 4 SOL Attachment 4 Past Performance Client Questionnaire
- 0001 Attachment 5 SOL Attachment 5 SEED PROJECT Specifications
- 0001 Attachment 6 SOL Attachment 6 SEED PROJECT Drawings
- 0001 Attachment 7 SOL Attachment 7 SEED PROJECT Wage Determination
- 0001 Attachment 8 SOL Attachment 8 Contractor Safety and EMR
- 0001 Attachment 9 SOL Attachment 9 VAAR 852.219-75 Certification
- Bid document